Electrical Site Engineer
Pak Elektron Limited
Total years of experience :5 years, 3 Months
Plan, execute and monitor all Site activities both in buildings and switchyard area, ensuring quality as per approved shop drawings, contract documents, project specifications and all applicable standards.
Preparation of Electrical Shop Drawings, Load Calculation and Load Schedule, SLDs in AutoCAD as per Project Specifications, modify them according to actual site requirement (if required) for approvals from the consultant.
Installation testing & Commissioning of CRP Panels, Battery banks and chargers, JBs, LV/ MV Switchgears, LVAC/LVDC DB’s, NDB’s, EDB’s and all Electrical Appliances in Substation buildings i.e. CHB, MSB, SMS room and Generator room etc.
Manages directly and provide engineering and technical supports to all the electrical work groups at site and ensures execution, quality and accomplishments of all targets and reports to Project Manager on daily basis.
Coordinates with Client (NTDC) / Consultant (NESPAK) representatives for any site instructions and inspection of works.
Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
Ensure that the project execution will be done according to all applicable HSE standards and housekeeping
_Plan, execute and monitor all Site activities both in buildings and switchyard area, ensuring quality as per approved shop drawings, contract documents, project specifications and all applicable standards. .
_Manages directly and provide engineering and technical supports to all the electrical work groups at site and ensures execution, quality and accomplishments of all targets and reports to Project Manager on daily basis.
_Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
_Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
_Inspection and Quality check of cables glands, Loop checking, cable earthing, cable termination, MCCBs, ELCBs, MCBs and Cable Sizes.
_Maintaining and monitoring project plans, project schedules, budgets and expenditures, keeping coordination with head office on daily basis.
_Calling, organizing and participating in meetings with client /consultant /Subcontractors as per project requirement, following up on decisions from meetings.
_Preparation of progress invoices and get them approved from Consultant/ Client periodically.
_Project handing over/ taking over to the client, ensuring punch list rectification and provision of all required items i.e. As-Built drawings, manuals and keys etc.
_Ensure that the project execution will be done according to all applicable HSE standards and housekeeping.
Projects Completed:
220/ 132 KV Substation Gujrat, NTDC, Pakistan.
please find job Profile in attached resume.
Plan, execute and monitor all electrical related works in the switchyard as well as in the buildings and coordinate the work with civil groups.
Coordinates with Client/Consultant representatives for any site instructions and inspection of works.
Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.
Supervise all Site activities regarding equipment installation, Testing and Commissioning, handing over/taking over to the client, liabilities, O & M during warrantee period.
Projects Completed:
• GEPCO 132kv GIS Substation Sheranwala Gujranwala Punjab Pakistan.
• GEPCO 132kv Substation Kheyaali Gujranwala Punjab Pakistan.
Find details in attached resume.
• Testing and quality control of Current Transformers.
• Research and development work for prototype approval of CT’s.
• Control all manufacturing procedures of CTs.
• Accuracy Test of Current transformer on ELTEL AUTOMATIC INSTRUMENT TRANSFORMER TEST SET (AITTS-98).
• Keep lab equipment operational by following manufacturer’s instructions.
• Conduct inspections to the WAPDA inspectors according to specifications.
• Resolve field issues and quality issues through analysis.