وقاص Shehryar, Process Engineer (Ammonia)

وقاص Shehryar

Process Engineer (Ammonia)

Fatima Fertilizer Company Limited

البلد
باكستان - لاهور
التعليم
بكالوريوس, Petroleum & Gas Technology
الخبرات
14 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 4 أشهر

Process Engineer (Ammonia) في Fatima Fertilizer Company Limited
  • باكستان
  • أشغل هذه الوظيفة منذ أبريل 2014

• Currently working on Capacity enhancement Project of Ammonia, DBN (Debottleneck to increase 20% production rate of ammonia with a final production target 1800 MTPD Ammonia.
• Working on Project conceptualization, basic project development and Detailed Engineering both from technical & commercial perspective. Basic Engineering working with Haldor Topsoe (HTAS), with detailed engineering working with FW (USA), CNCEC and others.
• Reviewing Proposals from different vendors and involvement in technical correspondence with vendors and licensors..
• Working on Waste Gas Boiler, Waste Gas Booster Compressor, Cold Box, Reformer Main & Aux Burners Evaluation project, with technical correspondence with vendors and also in house evaluation.
• Working on New Cooling Tower Project, Evaluation of Existing Cooling Tower Capability using CTI Toolkit.
• Remained involved in the Catalyst unloading, loading, reduction activities during ATA-2014. Replacement of Primary Reformer Catalyst, the pressure drop profiling and loading. Desulphurisers, Syngas Dryers, LTS Guard Bed media and catalyst loading and unloading.
• Preparation of Process Data Sheets and Process Packages for Process Equipments and Instruments.
• Reviewed/Developed PFD's, P&ID's and process data sheets from vendors.
• Worked with other project team members for development of layouts, input to safety studies, and other engineering functions.
• Rating of different equipment like heat exchangers, pumps for performance evaluation,
• Performance evaluation of cooling water heat exchangers by through Aspen EDR and also using Hydraulic study for determination of exact flow rates.
• Development of process design specifications by using simulation tools such as HYSYS, and design software such as ValSpeq, HTRI, Firstvue, Fisher, PEL, instrucalc and KORF.

Process Engineer (Process Support Manager) في LOTTE Chemical Pakistan Ltd
  • باكستان - كراتشي
  • أبريل 2010 إلى أبريل 2014

Responsibilities and Experience Includes:

a) Process Development:

• Working on New Initiatives, Modifications in view of process improvement, Variable Cost Reduction, Energy resource Conservation.
• Plant Performance & Process parameters Continuous Monitoring, Optimization and analysis utilizing “Aspen IP21”.
• Product quality Control Optimization and Strategy Development.
• Carrying out Process Investigations, Problem Solving and Root Cause analysis.
• Developing design philosophies, equipment datasheets, Engineering Drawings (PFD & P & I Diagrams) for Projects and modifications.
• Working on Debottlenecking and rate adjustments.
• Performing Pipeline network Hydraulic studies (Aspen Hysys Upstream, KORF, PEL), Control Valves sizing (ValSpeQ, FirsVue), Relieve Valves sizing.
• Development of Steady State Process Simulations; Aspen Plus, Aspen Hysys.
• Vendor Document Review and Correspondence.
• Developing and reviewing the Standard operating procedures.
• Instrumentation and Control support to instrument team, DCS (DeltaV) controllers tuning and Logics development and Process Automation.
• Good understanding of related ASME, FW, ASTM & API rp’s, codes & standards.
• Variable Cost, Efficiency Calculations, CAPEX and Loss Account Preparation.
• Performance Monitoring specifically Sundyne Pumps, Centrifugal Air Compressor (20 MW, 150, 000 Nm3/hr & 19barg pressure), Distillation Column, Absorber, Heat Exchangers, Dryer, Filters, Swing Bed Absorber, Reactor etc.

b) Process Safety:

• Participating in HAZOP Study as a Process Engineer.
• Carrying out Safety Audits (Safe and UnSafe Act (SUSA)) of Complete Plants.
• Ensuring successful implementation of ICI - Responsible Care Management System (RCMS) .
• Carrying out study in DCS, PLC and control logics development to ensure safe & smooth operation of plant and to have effective alarm and trip control.
• Developed plant operating and trials procedures covering complete HSE study.
• Job Cycle and operational audits.
• Lead Auditor in Q3 & Q4 2013.
• Carrying out PHA and risk assessment also utilizing ICI Process Safety Guide for process and operational evaluations.
• Carried out multiple Safety drills (Toxic, Fire etc), with participation as auditor/observer.

c) Process & Operation Support:

• Technical support to Operations department during start-ups, shut-downs, plant optimization and trouble shooting
• Plant Monthly, Daily Performance and utilities consumption report Issuance.
• Ensuring the smooth operation of reactor, crystallisers, Distillation Column, Absorbers, Filters (Sinter, Press, Rotary Vacuum, Ama filter), Steam Dryer, Absorber, Air Coolers, Heat exchangers, Compressor, Pumps, Control Valves etc.
• Plant Process & Operation Control and Management.
• Ensuring conformance to site Engineering and Safety HSE & S Procedures.
• Plant Start-up and Shutdown Management.
• Monitoring Shift Operations and ensuring Plant Integrity and Smooth Operation.
• Awareness of PTW (Permit to Work) system.
2. Chemical Engineer (Internee)
Northern Power Generation Company Limited (NPGCL), GENCO III, Thermal Power Station (1350 MW), Muzaffargarh, Punjab. Aug 2009 - Sept 2009

• Working and assessment of Cooling Tower and Dosing Facility.
• Demineralization Plant operation and process study.
• Boiler & Furnace Operation, Issues & Furnace Tube Scaling Prevention additives Study.
3. Chemical Engineer (Internee)
Sui Northern Gas Pipeline Limited, Distribution Department, Lahore.
July 2008 - Aug 2008
• Gas Distribution, Metering and Piping System during site and Plant visits.

Shift Manager (Trainee) في LOTTE Chemical Pakistan Ltd
  • باكستان - كراتشي
  • أبريل 2010 إلى أغسطس 2010

2. "Shift Manager (Trainee) " in LOTTE Chemical Pakistan Ltd.
Apr 2010 - Aug 2010
Salient Responsibilities: • Plant Process & Operation Control and Management.
• Ensuring conformance to site Engineering and Safety HSE & S Procedures.
• Plant Start-up and Shutdown Management.
• Monitoring Shift Operations and ensuring Plant Integrity and Smooth Operation.
• PTW system, Issuance of PTW.

Chemical Engineer في Northern Power Generation Company Limited
  • باكستان - لاهور
  • أغسطس 2009 إلى سبتمبر 2009

Chemical Engineer (Internee)
Northern Power Generation Company Limited (NPGCL), GENCO III, Thermal Power Station (1350 MW), Muzaffargarh, Punjab. Aug 2009 - Sept 2009
Studied and done training on Cooling Tower, Demineralization Process, Boiler & Furnace Working, and Issues & Furnace Tube Scaling Prevention additives.

الخلفية التعليمية

بكالوريوس, Petroleum & Gas Technology
  • في University of The Punjab
  • يناير 2010

B.Sc (Engg) Chemical Engineering & Technology 2006 - 2010 Specialization in Petroleum & Gas Technology CGPA / %age 3.97 / 87% ICET, University of The Punjab, Lahore, Pakistan

الثانوية العامة أو ما يعادلها, Engineering
  • في Forman Christian College
  • سبتمبر 2005

HSSC (F. Sc Pre-Engineering) 2003 - 2005 Forman Christian (FC) College, Lahore, Pakistan 77%

الثانوية العامة أو ما يعادلها, Science
  • في The Trust School
  • أغسطس 2003

SSC (Matriculation) 2001 - 2003 The Trust School, Lahore, Pakistan 85%

Specialties & Skills

Operations Optimization
Process Simulation
Process Engineering
Process Safety
Process Development
Aspen Exchanger Design & Rating (Aspen EDR)
CONTROL VALVES
ENGINEER
GAS TURBINE
HEAT EXCHANGERS
HYDRAULICS
INSTRUMENTATION
Process Investigations
Aspen Plus
OPERATIONS
OPTIMIZATION
PETROCHEMICAL
Process Simulation

اللغات

الانجليزية
متوسط
الأوردو
متمرّس

العضويات

SPE
  • Member
  • April 2008
PEC
  • Registered Engineer
  • January 2011

التدريب و الشهادات

7-Habits of Highly Effective People (تدريب)
معهد التدريب:
Franklin Covey
تاريخ الدورة:
January 2013
المدة:
48 ساعة
Process Hazard Analysis (تدريب)
معهد التدريب:
Fatima Fertilizer Company Limited
تاريخ الدورة:
June 2014
المدة:
48 ساعة
Aspen Hysys Dynamics (تدريب)
معهد التدريب:
AspenTech
تاريخ الدورة:
January 2013
المدة:
16 ساعة
Problem Solving & Decision Making (تدريب)
معهد التدريب:
Saddi Insha
تاريخ الدورة:
January 2013
المدة:
72 ساعة
Aspen Plus Dynamics (تدريب)
معهد التدريب:
AspenTech
تاريخ الدورة:
January 2012
المدة:
24 ساعة
Winning Decision (تدريب)
معهد التدريب:
Winning Edge
تاريخ الدورة:
January 2014
المدة:
72 ساعة