Office and site engineer
Trad Engineering & Contracting Est
Total years of experience :4 years, 7 Months
Execution Baalbek sewer pipe line as a Project Manager in July 2015.
•Execution Zahli water pipe line, (WATER INFRASTRUCTURE SUPPORT AND ENHANCEMENT FOR LEBANON / WISH-LEBANON PROGRAM).
Designer plans on Auto CAD and Google Sketch up
- Calculate different elements of structure; calculate charges and designer the armatures.
- Works on sites
- Make the BOQ
Studying, designing and drawing Auto-CAD
Auto-CAD drawings: structure and architect (plans, section, elevations, 2D and 3D),
Analyzing various areas and factors that are related to designing and construction, investigate and examine the location of the site and verify whether it is appropriate for construction purposes, review and approve project reports and designs, calculate the loads(beams, stirrups, columns, slabs and foundations) in addition to the site work constructions.
Worked in calculating loads and studying the steel for the beams, columns and foundations and some site works, drawing auto CAD (2D-3D), develop detailed design layout that covers the requirement of the client, Interact and communicate effectively with other subcontractors, architects and consultants.
- 2013-2014M2 college student in "ISAE-CNAM Liban"; providing the graduation project - 2012-2013: RNCP 2 (M1)