Industrial Electrician
SEPAM MIDDLE EAST
Total des années d'expérience :10 years, 2 Mois
Trouble shooting electrical Problem Repair all type of equipment specially swimming pool motor
Setting the PA SYSTEM when have a party or any kind of event maintain electricity supply to save energy.
Installation of Cable tray cable pulling, glanding and termination, installation of panel board, knowledge in drawing plan. To install the materials must look the drawing what exact location and elevation, knowledge in standard installation, Cathodic, Anode installation.
Maintain the hotel in electrical problem. Charge all Basted build, check all the A/V must in good condition, repair and maintain all equipment of the hotel. Like housekeeping equipment, swimming pool pumps. Electrical motors
Construction, installation, testing, and commissioning the medium switchgear and low voltage MCC (MOTOR CONTROL CENTER). Lay out cable trays as per drawing, cable pulling as per the cable drawing schedule. Loop checking the power cables, megger the all cables according to the rated voltages of the cables and write down as per the commissioning sheet. Assisted the Electrical Engineer for the commissioning equipment. Prepare material quantity estimate for all material to be use in sites. Submitted to my supervisor for request to purchase or delivered the materials in the site.
/ College
/ College
/ College
/ College