ياسر ابوزيد عبدالحى رفاعى, painting /coating inspector

ياسر ابوزيد عبدالحى رفاعى

painting /coating inspector

thyssenkrupp

البلد
مصر - القاهرة
التعليم
بكالوريوس, chemistry
الخبرات
18 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 0 أشهر

painting /coating inspector في thyssenkrupp
  • مصر
  • أشغل هذه الوظيفة منذ يونيو 2006

The Quality Control tasks, that includes:


Witnessing and carrying out the checks accompanied with pre-application, e.g surface
preparation, climatic conditions, materials preparation after application checks, marking areas of
defects and assurance of repair compliance, validity of equipment and materials storing
conditions, …etc.

Recording and reporting activities through daily / weekly technical reports.
Preparing the daily work schedule and the weekly work plan, that includes man power,
equipment, materials, and working hours.

Study of client’s specifications and developing the technical procedure according to the standards and requirements specified, attending the pre-job conference and the periodical meetings along with the project, technical submittals to/from concerned parties.

Carrying out evaluation tests for the coating systems proposed by suppliers for a new
project, that includes review of products data sheets, carrying out actual site application of products, evaluating quality and performance of coating systems through site tests as per standards specified,

The Quality Assurance tasks, that includes:

Specifications / Standards updating, and deciding of procedures compatibility.
Updating the reporting system/ forms for compliance with clients, internal and ISO policies.
Documentation system, including Approvals, NCRs, minutes of meetings, calibration, Analysis certificates, maintenance reports, expiration certificates.
Qualifying of personnel, instruments, equipment, and materials. That includes maintaining status, training labor, calibrating of instruments, and analysis/validity of materials. Evaluation takes place through periodical internal auditing.
Terminating / Renewal of approval of materials suppliers and subcontractors registered in clients’ vendor list. Evaluation takes place through periodical in-location auditing. Witnessing and approving tests of: pre-job evaluation and the final acceptance.

الخلفية التعليمية

بكالوريوس, chemistry
  • في Cairo Uni
  • مايو 2006

faculty of scence chemisry Dep.

Specialties & Skills

Painting

اللغات

الانجليزية
متمرّس

العضويات

نقابة العلميين
  • كيمياء
  • March 2007

التدريب و الشهادات

BGAS CSWIP Painting inspector grade 2 (الشهادة)
تاريخ الدورة:
April 2012
صالحة لغاية:
April 2012