ياسر Behgel, Construction Manager

ياسر Behgel

Construction Manager

Hill International,

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
بكالوريوس, Civil
الخبرات
27 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :27 years, 9 أشهر

Construction Manager في Hill International,
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ ديسمبر 2017
Construction Manager في Hill International,
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ ديسمبر 2017

a team of Project Management Construction (PMC) staff in executing the project and managing overall project quality, safety, and progress and cost objectives.
•Key projects

Project Revised master plan & Infrastructure works for Auto City ICAD 5 Rahayel project Area1, 2& 3
Project Construction of 308 Car Repair Workshops & Spare Parts Retails Area 2&d3
Project brief: revised master plan & construction of infrastructure including Roads, sewer, water, storm, firefighting and irrigation network and ducts for telecoms, electric substation, streetlight, showroom and workshops buildings with associated service buildings.

Construction Manager في Dorsch-ADNOC Civil Project Department Ruwais (PMC)
  • الإمارات العربية المتحدة
  • سبتمبر 2014 إلى أغسطس 2017
Construction Manager في Project Management Construction
  • الإمارات العربية المتحدة
  • سبتمبر 2014 إلى أغسطس 2017

(PMC) staff in executing the project and managing overall project quality, safety, and progress and cost objectives.
•Develop and introduce in-house project management procedure for construction supervision and management.
•Prepare special report to company management to investigate problems related to the scope and to provide recommendations and advice on any potential variation to the scope, since it may create cost or time impact.
•Monitor the progress of project at regular intervals through site visits and ensure that the project is running as per schedule and prepare daily site report and weekly progress report for the appraisal of higher management and provide timely advise to the management of any foreseen slippage of progress and propose corrective actions.
•Attend executive, weekly, monthly, quality & safety meetings and facilitate all audits carried out by third parties.
•Monitor and review sub-contractors’ activities for the progress and quality of work and scope creep to identify potential issues and proactively identify solutions to redress them.
•Liaise with the managers of other disciplines and ensure proper coordination among all trades.
•Ensure that all site activities going on are in accordance with the approved Project Quality Plan (PQP) and enforce measures for strict adherence to the environmental and safety norms and regulations.
•Ensure fulfillment of client expectations by providing delivery of highest quality service and promptly acting on feedbacks.
•Conduct formal and regular HSE audits to assess the compliance with HSE procedures & plans and initiate necessary action for the introduction of corrective actions.
•Organize periodical meetings with clients / consultants and maintain strong client service orientation combined with trusting relationship with clients / consultants and participate in management review meetings.
•Scrutinize the claims put up by the contractors and issue provisional acceptance certificate (PAC) or Final acceptance certificate (FAC) and perform the project closure activities.
•Implementation of pre-commissioning & commissioning plans, participate in final inspection, review of snags and rectification of snags.
•Complete the project related documents and initiate the project closure activities in coordination with the contractors.
Key Projects:

Project 6020C1Construction of New Sewerage Treatment Plant
Project brief: Construction of New Sewerage Treatment Plant Ruwais City with capacity of 25000 cubic meter/day effluent water including
•Inlet Head works
•Five Stream Anoxic and Aeration tanks,
•Distribution chamber,
•Five Secondary Clarifier,
•Effluent balancing tank,
•RAS SAS pump room,
•Filter feed backwash pump room
•Horizontal Pressure Sand Filter,
•Air blowers Pump Room,
•TSE storage tanks,
•TSE irrigation Pump room,
•Chemical Dosing tanks and pumps
•Tanker docking station with septage lift station tank
•Sludge Digestion Tank and Holding Tanks
•Dewatering building and Thickened sludge drying bed and dried sludge storage and backing area
•MCC room, Administration and Control building, Workshop, generator room and fire pump room
•External works
•Intermediate Irrigation Pumping Station
•Sewerage lifting station
•Water filling area
•Roads and utility hard and soft scape.

Project 7010C1Construction of New Water Pipeline
Project 5991C1 Rehabilitation of Old Ruwais Infrastructure
Project 6014C1 Landscaping
Project 7010C2 Relocation of Green Belt

Resident Engineer في Tebodin Middle Eas
  • الإمارات العربية المتحدة
  • يونيو 2003 إلى يونيو 2014

to Project Principal Resident Engineer with the responsibility of leading a team of 10 employees to ensure the planned progress of the project.
•Review and approval of project plan, safety plan, quality plan & contractors prequalification.
•Review and approval of work method statement, materials submittals, shop drawings and prepare RFI replies.
•Inspect site condition prior to start of construction activity and verify the compatibility of the site with design permanent works.
•Supervise and control site resident’s team, prepare daily logs and reports, maintain records of inspection made and tests performed.
•Prepare daily, weekly & monthly report for review meeting in main office and attend design consultant presentation meetings.
•Organize periodical meetings with clients / consultants, prepare minutes of the meeting and maintain strong client service orientation combined with trusting relationship with clients / consultants.
•Liaise with the mechanical and electrical department for clearance before proceeding with the civil construction work.
•Ensure that the works carried out by the contractors are in line with the contract drawings and meet the relevant specification.
•Ensure strict compliance to company’s QC manual; perform periodical internal / external audits. Also, conduct HSE audits, risk assessment and timely introduction of preventive measures.
•Accompany the consultant during site inspections and make sure that all activities are completed and the site is ready for inspection.
•Monitor the project activities against Bill of Quantities (BOQ) and ensure financial administration of the project.
•Implementing pre-commissioning &commissioning plans, participate in final inspection, preparation of snag list, reviewing and assessing close out report.
•Perform contract closure activities after ensuring the project has addressed all the terms, conditions, and fully met the exit criteria.

Key Projects:
•Construction of water supply works on Al Reem Island Development

Resident Engineer في Tebodin Middle Eas
  • الإمارات العربية المتحدة
  • يونيو 2003 إلى يونيو 2014
في Nakheel
  • الإمارات العربية المتحدة
  • يناير 2009 إلى يونيو 2014

Project brief: Design review and construction of regional water mains (PRMs) from the TRANSCO line to the regional network of developments (DI Pipe- 800 mm & HDPE Pipe 280 mm), internal water distribution network for all the three developments Shams Abu Dhabi, Tamouh sector 1, 5 & 6, 2-3 and Najmat Abu Dhabi (HDPE Pipe 630-32 MM) and construction of valves chambers, data measuring points, bulk consumers, fire hydrants, domestic connections and other network accessories and fittings as per ADWEA/ADDC standards.

•Omran Infrastructure Project Phase 1- (Part of Dubai Water Front Development)

Civil Enginer في Villa Palm Island Jumerah
  • الإمارات العربية المتحدة
  • مارس 2005 إلى سبتمبر 2006

Project brief: landmark project construction of 1400 high luxury villas adopting the highest
International standards for finishing
•Agricultural water supply from camel race tank - Al Ain
Project cost: Contract amount 125M/Dhs
Client: Private Department of H.H. the

Project cost
  • أكتوبر 2004 إلى مارس 2005

Project brief: The project includes construction of 60 km GRP pipes DN (1000-600-400-300) with associated chambers and fittings

•Shuweihat Water Transmission Project,

  • يونيو 2003 إلى أكتوبر 2004

Project brief: Construction of Marfa Pumping station "LOT-C" with pumping capacity of 22, 740m3\ hour. Backfilling embankment work (42, 000m3), foundations for pumps and motors. Steel structure for shed. Four number shell tanks with 10 million gallon water capacity. Ring beam for the shell tanks, engineering fill inside ring beam. Crush run around ring beam, surge vessel foundation "16 no". Foundations for surge vessels, elevations pad and anchor bolts. Workshop, warehouse, chlorination building and recirculation pump sheds. Foundations anchor bolts and steel structure. Service block building, office building, accommodation buildings for junior and senior staff, executive staff building, mess hall and all related works like reinforcement, masonry, carpentry, plastering, paint and sanitary work. Road asphalt pavement. Street lighting. Drainage system. Cable trench and box culverts. Telephone lines. D.I. pipe laying (under ground and above ground with connections), hydro test, flushing and disinfections.

Asst. Resident Engineer في Parsons International LTD
  • الإمارات العربية المتحدة
  • أغسطس 2001 إلى يوليو 2003
Assistant Resident Engineer في Parsons International Ltd
  • الإمارات العربية المتحدة
  • أغسطس 2001 إلى يونيو 2003

Key Responsibilities:
•Accountable for managing and leading a team of seven employees, with the responsibility of site supervision of projects and reporting to Resident Engineer.
•Responsible for studying the site plan, layout, design, etc. and analyzing the feasibility and effectiveness of the project.
•Assist the resident Engineer in making changes to the construction design to make the project more feasible and eco-friendly.
•Supervise and coordinate the project activities, to ensure timely and accurate completion of the construction project.
•Manage the approval of project plan, safety plan, quality plan & contractors prequalification.
•Review and approve work method statement, materials submittals shop drawings and prepare for RFI replying,
•Responsible to ensure that the materials used are as per the standards set in the contract.
•Collect data from project site, make reports on stock of raw materials and equipment’s, and submit it to seniors.
•Assist in conducting tests on materials for load bearing and resistance against environmental factors.
•Inspect the work carried out by supervisors, contractors and engineers and check for any deviations in executing the plan

Key Projects:
•Sewerage facilities for 200 houses, houses at Bahya, Abu-Dhabi. Contract 507/4
Project Cost: Contract amount 21 M/Dhs.
Project brief: Includes construction of approximately 27kms of GRP, UPVC & NDM pipes with associated manholes, chambers and pumping station.

•Sea outlet for Samha, Shama and Rahba surface Drainage Contract 509/1
Project cost: 30 M/Dhs.
Project brief: Pertains to the construction of approximately 7 Kms of DN 1800 mm & 2400 mm Dia. R.C.C pipe and sea outlet structure.

•Contract 507/4A.
Project cost: Contract amount 12, 000, 000Dhs
Project brief: Pertains to the construction of approximately 27kms of GRP and UPVC pipes with associated manholes and chambers

Engineering Consultant
  • الإمارات العربية المتحدة
  • أكتوبر 2000 إلى أغسطس 2001
Site Civil Engineer
  • الإمارات العربية المتحدة
  • أكتوبر 2000 إلى أغسطس 2001

a team of supervisors and workers with the responsibility for supervision and inspection of construction activities
•Review of engineering drawings, specifications and monitor the executed work against the approved Shop drawings.
•Ensure compliance of materials delivered to site with approved submittal and repair forms for test.
•Ensure strict compliance to the quality requirements and to the fullest satisfaction of the main contractor, consultant and client
•Mobilize workforce & resources, arrange according to the day-to-day requirement of the project, and dispatch schedule to the work site.
•Maintain the daily, weekly records of the progress of the works, evaluate the progress on monthly basis against the planned program and budget, and appraise the Senior Officers.
•Liaise with different government departments for various project related permits and approvals.

Key Project:
•Falaj Hazza Model School (PWD project)
Project Cost: Contract amount 30 M/Dhs

Consultant في Al Barajeel Eng
  • الإمارات العربية المتحدة
  • يوليو 1999 إلى سبتمبر 2000
Civil Engineer في Al Barajeel Engineering Consultan
  • الإمارات العربية المتحدة
  • يوليو 1999 إلى سبتمبر 2000

in design, preparation of BOQ and specification of the project, in addition to site supervision and coordination.
•Inspect and supervise the utility works pertaining to Relocation and construction projects.
•Supervision and inspection of construction activities such as excavation, piling and foundation reinforcement, form works, concrete works and testing.
•Computation of material requirement for different parts of the project and coordinate the supply of material at site as per the daily requirement.
•Review of engineering drawings, specifications and monitor the executed work against the approved Shop drawings.

Key Project:
•Construction of Commercial Bldgs., private Villas, low cost houses and service buildings

Civil Engineer في Sudan Railway Corporation
  • السودان
  • مارس 1996 إلى يونيو 1999
Civil Engineer في Sudan Railway Corporation
  • السودان
  • مارس 1996 إلى يونيو 1999

in design, preparation of BOQ and specification of the project, in addition to site supervision and coordination.
•Review of engineering drawings, specifications and monitor the executed work against the approved Shop drawings.
•Supervision and inspection of construction activities.

Key Projects:
•Construction of Khartoum north new Container Terminal.
•Construction of Khartoum north new Station terminal.
•Construction of 33 km. Sector Road Atbara railway city.
•Construction of alignments and truck work, steel bridge and culverts

الخلفية التعليمية

بكالوريوس, Civil
  • في Omdurman Islamic University
  • مايو 1996

courses: Professional Development •Diploma of National Association of Safety Professional (NASP), Dubai (2005) •Occupational Safety and Health Administration (OSHA), Dubai (2005) •Project Management Professional – PMP, Abu Dhabi (2009) •Structural Design Program, SAP-90, STAAD, Sudan (1998) •Construction Management, Training Centre. S, R Corporation, Sudan (1996) •Industrial Training Course, Civil Engineering Dept., Design Office, Sudan (1996) •Earthwork Construction Road & Bldg Research, University of Khartoum, Sudan (1996) Short-Term Courses Attended •Safety Awareness Course •Managing and Conducting Meetings •Time Management •How to Conduct Effective Meetings •Project Management module I & II •ISO 9001 Awareness. •Construction & Site Safety

Specialties & Skills

Inspection
Payments
Site Supervision
Engineering
Coordination
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
MANAGEMENT
MATERIALS MANAGEMENT
MICROSOFT OFFICE
MICROSOFT WORKS
NETWORKING
PROGRESS
QUALITY

اللغات

العربية
متمرّس
الانجليزية
متمرّس

الهوايات

  • LOVE READING AND SPORTS