MEP Construction Manager
Aramco Saudi Arabia (Target Construction Saudi)
مجموع سنوات الخبرة :27 years, 10 أشهر
SAUDI ARAMCO (TARGET construction Saudi Arabia.) (Current Employer)
Project Name : SAPMT-North RT Ref.&Juaymah NGL Project Div
Duration : April 2022 until Till now
Postion : Construction Manager
Project Value : 70 Million USD
The Project Consist of
- Replace and construct of 12”, 10”, 8”, 6”, 4”& 3” Tie ins.
- Replace slop tanks (050-TK-141 and 050-TK-142) located in the north refinery tank farm area, the gasoline blend component tanks (050-TK-257 and 050-TK-258) and finished gasoline blending tank (050-TK-265) which are located in the south refinery tank farm area. These tanks were built in 1945 and have been in service of around 70 years. - replace 5 NS oil storage tank -1900 m3
AFRY (Previously known as Poyry Switzerland Ltd.)
Project Name : Shuqaiq Water Transmission System Phase 3
Duration : April 2018 until March 2022
Postion : Piping Engineer
Project Value : 800 Million USD
The Project Consist of
- Construction of 80" single pipeline from PS1-Ph3 at Shuqaiq up to
RTA-Ph3 - approx. 123.6 km……. 60”& 52”& 48”….. approx. 550 km.
- Construction works, supply and installation of all equipment for the following pumping stations: PS1-Ph3, PSM, PSJ-Ph3, PS2-Ph3, PS3-Ph3, PS4-Ph3, PS-TI,
PSQ, PS1-Ph3 (upgrade of existing Shuqaiq - Ukad WTS)
- 24NS Water storage tank -190 000 m3
Saudi Binladin Group ( INMA Utility Contracting Company)
Project : Central Utility Complex & Tunnel - Haram third Expansion
Duration : From 11/12/2011 To April 2018
Position : Piping Mechanical Engineer
Project Value : 1500 Million USD
The project consists of:
- District cooling chiller plant 24 chillers with total capacity 120, 000 TR (The biggest
HVAC station in the world).
- Generator station 14 generators with a total capacity of 70000 Kw, suction and pressure waste plant with a full capacity 650 Ton/Hr, firefighting pump station, grey water treatment plant, service building,
- Makeup water tank 17000 m3
- Training centre building.
Saudi Aramco ( Gulf Consolidated Contractors CO. LTD - GCC)
Project : Rtdb-1 Pipeline Capacity Increase -Saudi Arabia Ras Tanora Port
From : 1/1/2009 To 23/11/2011
Position : Piping Mechanical Engineer. Project value : 500 Million USD
Responsible for all installations, testing and commissioning of over 5 KM of various piping and many sophisticated equipment, planned and executed several shutdowns at Dahran - Qatif - Ras Tanora refineries.
Pipelines types: Diesel - Petrol - Kyrosene.
(Saudi Aramco) Consolidated Contractor Company - CCC Project : Kharasaniyah Producing Facility (KPF)
From : 12/12/2007 To 31/12/2008
Position : Mechanical Engineer
Project value : 330 Million USD
Responsible for all mechanical activities and manpower distribution on this mega grass root hydrocarbon project
null
Egypt Branch Co: (Egypt)
Project: Lube Oil Expansion Project. Alex Mineral Oil Co. (AMOC).
Iron & Steel Eldekhela factory .
Fabrication of piping and support.
* Supervising the erection of piping and supports at site.
* Controlling, selecting and dispatching of the material.
* Resolving out standing issues by modifying any necessary parts.
* Determining and preparing the piping circuits.
* Making and following punch list for the piping circuits.
* Controlling and following the hydraulic test at site.
* Supervising pre-commissioning, commissioning activities and start up activities.
* Supervising the calibration of safety valves.
* Supervising the final alignment for compressors and turbine flanges.
* Insulation following up.
* Supervising all construction work of subcontractor .
* Reviewing all designs drawings.
* Supervising the pneumatic test at site.
* Reviewing underground piping erection and testing .
* Underground piping test pack preparation. Reviewing commission system on p&ID.
* Marking test limits on p&ID.
* Test packs document preparation .pressure test mentoring and witness at site .
* Issue the piping pressure test and punch list for some test packages then follow up to get them completed
* Supervise the mechanical completion for systems .
* Supervise of boiler erection and the hydraulic test .
*Involved in construction of gas and oil projects and execution of the piping works in pertochemicals and fertilizing plants.
*Reviewing the isometric drawings for prefabrication spools.
*Fully aware with the different types of material ( Carbon Steel, Stainless Steel, duplex, Alloys steel and others for all grades and schedules ).
*Supervising the welding activities at Fabrication Shop.
*Responsible for Hydro test procedure, preparation, and Mobilization of Hydro tested spools from work shop yard to site.
*Executing of plant maintenance such as
Mechanical Engineering