ياسين BenBilgacem, Recreation Facilities Maintenance Supervisor

ياسين BenBilgacem

Recreation Facilities Maintenance Supervisor

BANANA ISLAND RESORD BY ANANTARA QATAR DOHA

البلد
قطر - الدوحة
التعليم
ماجستير, Materials And Chemical Engineering
الخبرات
12 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 7 أشهر

Recreation Facilities Maintenance Supervisor في BANANA ISLAND RESORD BY ANANTARA QATAR DOHA
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ نوفمبر 2016

In this role, I was the Coordinator between the Recreation Department and the Engineering Department, I was trained on all Department equipment and facilities in order to perform the following job description:

- Inspect the facilities and the equipments periodically to determine problems and necessary maintenance plans.
- Being on call for any maintenance issue which requires an immediate action.
- Prepare weekly maintenance schedules and allocate work in coordination with the Engineering Department.
- Prepare monthly prevention maintenance schedules and allocate work in coordination with the Engineering Department.
- Inspect and maintain buildings (e.g. Bowling, Water-sports, Surf-pool, outdoor Pools, GYM, Sauna…)
- Monitor inventory (mechanical and perpetual) of materials and equipment
- Participate in coordination of the Department projects (e.g. renovations)
- Ensure adherence to quality standards and health and safety regulations

On 2018, as my managerial and bilingual skills meet the position, I was promoted as Recreation Department Supervisor, I was performing the same above job description with more responsibilities (e.g. staff management, recruitment, events planning, training and job coaching, budgeting)

Production Manager في kmmimech materiel de construction
  • تونس - سوس
  • أبريل 2014 إلى أغسطس 2016

The company started as a small business in 2008 and grew up successfully to a certain level where a lean manufacturing system was required to improve both, production and product quality, in order to maintain the business growth, and here comes my role as a production and quality assurance Engineer.
Detected issues:
- The production was slow and sporadic due to the unorganized supply chain, workflow, workload, manpower, lack of equipments and raw materials supplies, no preventive maintenance and no safety measures applied.
- The quality wasn’t consistent due to the absence of the quality control system standards
- Wastage in terms of time and materials
Elaborated action plan based on PDCA methodology:
Reestablishing the production flow, with a mapped supply chain, based on the raw material transformation type and the product manufacturing order with different stations linked together as a production chain,
Elaboration of SOPs documentation for each work station, with a maintained updates based on operations issues which led to avoid all types of wastage (time, material, manpower, operation...) in order to give the most added value.
. Recruit and reorganize the manpower based on operations requirement and needed skills, implementation of Taylor manufacturing system followed by training session to the Team on their specified SOP.
Implementation of Kanban manufacturing methodology in order to control the work flow, equalize the workloads and plan the production based on received orders to avoid the production excess.
Enhancement of the safety protocols, training sessions conducted on the usage of PPE and their benefits
Implementation of the KPIs system, in to the production stations, in order to improve their efficiency and identify their highest performance which led to fix the production objectives and better estimation of orders expedition due dates.
Implement the preventive maintenance system and provide more equipment to the team based on operations needs and workload,
Robotize the raw materials cutting, purchasing of 2 programmable cutting machines, for more precision and supplies to the work stations to maintain both production flow and quality.
Rebuild the Quality Control System based on KPIs, with a well trained Team performing a quality assessment patrols with daily and monthly quality reports and data analyses in order to monitor our product quality progress
Implementation of the 5S (sort, set in order, shine, standardize and sustain) methodology which leads to the continuous improvement or lean manufacturing processes and visual work place.

Methods and project Engineer في WORLD REFRIGERATION COMPANY
  • تونس - تونس
  • أكتوبر 2013 إلى فبراير 2014

We are specialized in the installation and maintenance of the frigorific chambers
My job description was as the following:
- Define the chamber characteristics to meet the client needs.
- Define the human and material resources needed for the project
- Set the construction schedule and monitor the progress of the construction plan
- Define the quantifications of construction costs and methods used
- Define ways or particular methods while being able to compare the financial impact of different options to help launch the site.

Production Manager في TUNISIE PORCELAINE
  • تونس - تونس
  • يوليو 2011 إلى أغسطس 2013

Reporting to the Production Manager, I am responsible for:
-Animate my production site and maintain the safety standards,
- Lead my team to achieve the objectives, communicate all the information.
- Conduct production planning in collaboration with the scheduling department: adjustment of production orders according to the availability of personnel, materials and equipment, tracking of all production indicators and make sure all the goals are reached
- Tracking Team performance, implement and conduct trainings to improve their skills and knowledge to ensure the productivity and quality of manufactured products
- Coordinate with the Quality assurance department in order to maintain the quality standards
- Conduct the preventive maintenance planning in cooperation with the Maintenance Department
- Reduce energy consumption and materials wastage in order to enhance company profits.

الخلفية التعليمية

ماجستير, Materials And Chemical Engineering
  • في l'Ecole Nationale d'Ingénieur de Sfax
  • يونيو 2010

Civil Engineering, metallurgy, fabrication, manufacturing, logistics, analysis, planning,

الثانوية العامة أو ما يعادلها,
  • في l'Institut Préparatoire aux Etudes d'Ingénieurs de Sfax
  • يناير 2007

• 2005/2007: Cycle préparatoire: Section PC à l'Institut Préparatoire aux Etudes d'Ingénieurs de Sfax (IPEIS) - Tunisie.

بكالوريوس, science experimenale
  • في lycee 18 janvier 1952
  • يونيو 2005

High School graduation, Bachelor in Science , Physics and Mathematics

Specialties & Skills

Technical Drawing
Freehand
Materials
Production
Quality Oriented
ACROBAT
AUTOCAD
COMPOSITES
CORROSION
ISO 9001 QMS
lean manufacturing techniques
operation
logistics management
negotiation
materials
logistics
supply chain management
logistics planning
solidworks

اللغات

الانجليزية
متمرّس
العربية
متمرّس
الاسبانية
مبتدئ
الفرنسية
متمرّس
الايطالية
متوسط

التدريب و الشهادات

bachelor degree in Materials and Civil Engineering (الشهادة)
تاريخ الدورة:
June 2010
صالحة لغاية:
June 2010