Yordan Suseno, SENIOR PIPELINE ENGINEER

Yordan Suseno

SENIOR PIPELINE ENGINEER

MCDERMOTT INTERNATIONAL

Lieu
Indonésie
Éducation
Master, Ocean Engineering
Expérience
21 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 4 Mois

SENIOR PIPELINE ENGINEER à MCDERMOTT INTERNATIONAL
  • Qatar - Doha
  • Je travaille ici depuis novembre 2022

• NORTH FIELD SOUTH (NFS) OFFSHORE PROJECT PIPELINE
Owner : Qatar Gas
Scope : 6", 28" and 36" Subsea and onshore Gas and MEG Pipelines, 4 lines Umbilicals, and 6 lines subsea cables, together with 4 subsea wyes and 2 subsea barred tees complete with subsea ball valves.

LEAD PIPELINE ENGINEER à SINGGAR MULIA
  • Indonésie - Jakarta
  • août 2021 à septembre 2022

• SISI NUBI AOI FIELD DEVELOPMENT
Owner : Pertamina Hulu Mahakam (ex. Total E&P Indonesie)
Scope : 6 New Pipeline route from Existing AOI Platform to New Platform.

SENIOR PIPELINE ENGINEER à TIGA INTI PILAR
  • Indonésie - Jakarta
  • novembre 2020 à août 2021

• EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD
Owner : Jindi South Jambi B Co. Ltd.
Scope : New 6 inch pipeline approximately 12 km from Hari-1, connected to Hari-2 and Hari-3, terminated in Teluk Rendah.

Lead Installation Engineer à Halul Offshore Service Company / 3S Engineering
  • Qatar - Doha
  • janvier 2020 à avril 2020

• EPCIC OF 15KV SUBSEA CABLE AS-BG TO AS-ED PROJECT
Owner : North Oil Company
Scope : Detail, Transportation and Installation Engineering of 15kV Subsea Cable, including J-Tube Pull-in, J-Tube Clamp and Crossing Support.

LEAD PIPELINE ENGINEER à ARIOSH LIMITED
  • Nigeria
  • septembre 2017 à janvier 2020

• EPCIC OF OML 119 OKPOHO-OKONO 12” AND 6” FLEXIBLE PIPELINES PROJECT
Owner : Nigerian Petroleum Development Company
Scope : 12” Multiphase and 6” Gas Lift Flexible Pipelines and Risers to Mystras FPSO along with SSIV and MWA (Mid-Water Arch)
• SHELL NIGERIA GBARAN PH 3B - UZU PROJECT
Owner : Shell Petroleum Development Company
Scope : 2 x 16” NAG Bulkline from Zarama-15 to Gbaran CPF, and 2 x 6” Oil flowline from Zarama NAG Manifold
• DED FOR MAKARABA GAS DEVELOPMENT PROJECT
Owner : Chevron Nigeria Limited
Scope : 8” New Pipeline from Makaraba Wellhead to Makaraba Process Platform

LEAD PIPELINE ENGINEER à TIMAS SUPLINDO
  • Indonésie
  • septembre 2014 à septembre 2017

• EPCI SERVICE FOR THE BISON, IGUANA AND GAJAH PUTRI (BIGP) DEVELOPMENT PROJECT
Owner : Premier Oil Natuna Sea B.V
Scope : - New Subsea Pipelines, Manifolds and Isolation Valve Structures
- New Umbilical and Subsea Control System
- Brownfield Modification
• LONG TERM PIPELINE REPAIR - REPLACEMENT PROGRAM
Owner : Pertamina Hulu Energi ONWJ
Scope : - 6” New Flexible Pipe from KKA to KKNA Platform
- 14” New Pipeline from PCP to MMF Platform
- 10” New Pipeline from BG to BC Platform
• PHE WMO EPCI-1 : PHE-12, PHE-24 AND CPP2 PLATFORMS AND PIPELINE
Owner : Pertamina Hulu Energi WMO
Scope : New pipeline 8” Riser & production pipeline from PHE-12 to CPP-2, 6” Riser & Gas Lift pipeline from CPP2 to PHE-12, and 6” Riser & production pipeline from PHE-24 to KE5 CPP
• BEKAPAI PHASE 2B EPSC 2 - PIPELINE INSTALLATION PROJECT
Owner : Total E&P Indonesie
Scope : New pipeline 12” from Bekapai BA Platform to Peciko SWP-K Platform

LEAD PIPELINE ENGINEER à DOVER ENGINEERING LIMITED
  • Nigeria
  • mars 2013 à septembre 2014

• INDORAMA GAS PIPELINE PROJECT
Owner : Nigerian Agip Oil Company (NAOC), and Indorama Eleme Fertilizer and Chemicals Limited
Scope : 1. 83 km long Pipeline laid in parallel to the existing pipelines inside an existing RoW
2. 2Nos. Block Valve Stations
3. Launching & Receiving Trap Facility
• EPC FOR KOLO CREEK TO SOKU GAS EXPORT PIPELINE
Owner : Shell Petroleum Development Company of Nigeria Ltd.
Scope : 1. Four (4) flowlines from the F2 wells to the new Kolo Creek
2. Three (3) flowlines from the F1 wells to the new Kolo Creek
3. 20-inch, 40 km long carbon steel pipeline.
4. Installation of a Fiber Optics Cable (FOC) along the length of the pipeline ROW
• SOUTHERN SWAMP GAS GATHERING PIPELINES PROJECT
Owner : Shell Petroleum Development Company of Nigeria Ltd.
Scope : 1. 12” x 17 km AG Pipeline from Benisede to Tunu CPF.
2. 8” x 17 km AG Pipeline from Ogbotobo to Tunu CPF.
3. 12” x 24 km AG Pipeline from Opukushi to Tunu CPF.
4. 10” x 11 km NAG Bulkline from Dodo North to Tunu CPF

LEAD PIPELINE ENGINEER à DOVER ENGINEERING LIMITED
  • Nigeria
  • mars 2013 à septembre 2014

• INDORAMA GAS PIPELINE PROJECT
Owner : Nigerian Agip Oil Company (NAOC), and Indorama Eleme Fertilizer and Chemicals Limited
Scope : 1. 83 km long Pipeline laid in parallel to the existing pipelines inside an existing RoW
2. 2Nos. Block Valve Stations
3. Launching & Receiving Trap Facility
• EPC FOR KOLO CREEK TO SOKU GAS EXPORT PIPELINE
Owner : Shell Petroleum Development Company of Nigeria Ltd.
Scope : 1. Four (4) flowlines from the F2 wells to the new Kolo Creek
2. Three (3) flowlines from the F1 wells to the new Kolo Creek
3. 20-inch, 40 km long carbon steel pipeline.
4. Installation of a Fiber Optics Cable (FOC) along the length of the pipeline ROW
• SOUTHERN SWAMP GAS GATHERING PIPELINES PROJECT
Owner : Shell Petroleum Development Company of Nigeria Ltd.
Scope : 1. 12” x 17 km AG Pipeline from Benisede to Tunu CPF.
2. 8” x 17 km AG Pipeline from Ogbotobo to Tunu CPF.
3. 12” x 24 km AG Pipeline from Opukushi to Tunu CPF.
4. 10” x 11 km NAG Bulkline from Dodo North to Tunu CPF

Lead Pipeline Engineer à TRIPATRA ENGINEERING
  • Indonésie
  • décembre 2011 à mars 2013

• FEED FOR ASSET INTEGRITY PROGRAM
Owner : Chevron Pasific Indonesia
• SENORO GAS DEVELOPMENT PROJECT
Owner : Joint Operating Body Pertamina - Medco E&P Tomori Sulawesi
• COPI ENGINEERING SERVICES CONTRACT
Owner : Conoco Phillips Indonesia Inc. Ltd.
Scope : Engineering, Assistance for engineered and tagged items of procurement, project management support, project services, document and data management and construction management support.
• GG FIELD DEVELOPMENT PROJECT
Owner : PERTAMINA HULU ENERGI ONWJ
Scope : FEED for 12 inch Export Pipeline approximately 35km in length from new Offshore Platform to new Onshore Processing Facility.

Pipeline Engineer à NIPPON STEEL CONSTRUCTION INDONESIA
  • Indonésie
  • novembre 2010 à décembre 2011

• SOUTH MAHAKAM DEVELOPMENT PROJECT PHASE 1 & 2
SENIOR PIPELINE ENGINEER
Owner : Total E&P Indonesie
Scope : Engineering, Procurement, Supply, Construction, Installation and Pre-Commissioning of 24” Export Pipeline and 12” Sea line (Offshore & Onshore)
1. 24” Main Gas Trunk line approximately 70 km in length (include Onshore Part)
2. 24” Gas Sea line approximately 10 km in length
3. 12” Gas Sea line approximately 4 km in length
4. Pre-Commissioning 24” and 12” Gas Pipeline
Responsibilities :
Perform analysis and calculation to recommend pipeline routing detail and all pipeline engineering aspect

Pipeline Engineer à SUFFOLK PETROLEUM SERVICE LIMITED, Nigeria
  • Nigeria
  • juillet 2009 à novembre 2010

• MAJOR INTREGRATED PIPELINE PROJECTS - (MIPS)
OFFSHORE PIPELINE ENGINEER
Owner : Mobil-Exxon Petroleum Nigeria (MPN)
Scope : Installation of various pipelines diameter which consisting of Shore approach and offshore pipelines.
The Pipeline Project route :
1. ASABO - USARI, 20” O.D. Pipeline
2. EDOP QP - EDOP SSM, 24” O.D. Pipeline
3. UBIT SSM - QIT, 24” O.D. Pipeline
4. EKPE - ASABO, 16” O.D. Pipeline
5. EDOP SSM - QIT, 24” O.D. Pipeline
6. IDOHO BP - QIT, 24” O.D. Pipeline
Responsibilities :
Preparing Pipeline Data Sheet, Procedure and Analysis
Pipeline Installation Analysis using OFFPIPE (Static and Dynamic Analysis)
Start-Up, Normal Laying, A&R, Laydown Analysis and Shore-Pull Analysis
Catenary Analysis, Local buckling check and fatigue analysis
Interfacing with other department for Project Execution

Pipeline Engineer à LAPI ITB
  • Indonésie
  • septembre 2006 à juillet 2009

• SUBSEA PIPELINE ANALYSIS OF TRANSPORT SEDIMENT INFLUENCE ON SANDY SEABED, LNG TANGGUH
Owner : British Petroleum (BP)
Scope : Pipeline Analysis of On-Bottom Stability, Buckling, Free Span and Onset of Scour due to Transport Sediment
Responsibilities :
Pipeline Analysis Study, include : Buckle Analysis, On-Bottom Stability analysis, determination of weight coating, Free Span analysis, Onset of Scour and Disposition, Transport Sediment, Tidal, Wave and Current Characteristics
• PP PLATFORM TO ORF LANDFALL, 16” PIPELINE DETAILED ENGINEERING
Owner : Kodeco Energy Company Ltd
Scope : Pipeline Detailed Engineering of 16” O.D. Pipeline from PP Platform to Gresik Onshore Receiving Facilities (ORF), the pipeline length is approximately 66.046 km, consisting offshore section and nearshore section.
Responsibilities :
Detailed Engineering Design (DED) for Pipeline, include :
• Buckle Analysis, Determination of pipe wall thickness and steel grade, On-Bottom Stability analysis, determination of weight coating, Free Span analysis, Expansion Analysis, Pipeline Anchor
• FEED SUBSEA GAS PIPELINE TRANSMISSION PROJECT
BOJONEGARA LNG RTRF - MUARA KARANG PS - MUARA TAWAR PS
Owner : National Power Company (PT. PLN)
Scope : Front End Engineering Design (FEED) of 26” pipeline diameter (Bojonegara LNG RTRF - Muara Karang PS) and 20” pipeline diameter (Muara Karang PS - Muara Tawar PS) includes the design and fitting out the following gas inlet and outlet systems to be installed within the Pipeline Station.
Responsibilities :
Front End Engineering Design (FEED) for Pipeline, include :
• Pipeline Route Selection, Buckle Analysis, Determination of pipe wall thickness and steel grade, Stability analysis, determination of weight coating, Pipe spanning analysis
• MAIN TRANSIT TERMINAL DEVELOPMENT AND PIPELINE PROJECT
Owner : Pertamina
Scope : 32” diameter pipeline from Single Point Mooring (SPM) to onshore facilities.
Responsibilities :
On-Bottom Stability Analysis for Pipeline, include :
• On-Bottom Stability
• Soil Liquefaction Analysis
• Scouring Analysis
• Trenching and Backfilling

Offshore Engineer à Wijaya Karya
  • Indonésie
  • juillet 2003 à septembre 2006

• SURAMADU (SURABAYA - MADURA) CABLE BRIDGE PROJECT
Owner : Consortium China Contractors (CCC)
Scope : Main Bridge Section, include Sub-Structure and Upper-Structure.
Responsibilities :
Determination of Material Construction
Achievement :
Effectively of Material Construction.
• COAL FIRED STEAM POWER PLANT - COAL LOADING TERMINAL JETTY, BREAKWATER AND DREDGING PROJECT
Owner : CHENGDA Engineering (China)
Scope : Engineering Procurement and Construction (EPC) Project, include Power Plant 2 x 300 MW, Breakwater, Wharf and Dredging.
Responsibilities :
Manage Dredging, Breakwater and Jetty Construction to work base on specification and keep on HSE regulation, to get on schedule.
Achievement :
My Engineering team increase margin more than US$2 millions by making design and construction method more effective.
• ENGINEERING BUREAU, HEADQUARTER
Scope : Engineering Factor Supporting all of Wijaya Karya’s Project
Responsibilities :
Engineering Plan, Tendering, Bill of Quantity and Construction Method
Achievement :
New improvement of Construction Methods data base.

STRUCTURE ENGINEER à TATA MULIA
  • Indonésie
  • juillet 2002 à juillet 2003

Structure Engineer of High Rise Structure.

Éducation

Master, Ocean Engineering
  • à Bandung Institute of Technology
  • septembre 2009

Master Degree, GPA : 3.83 of 4.00

Baccalauréat, Civil/Structure Engineering
  • à Parahyangan University
  • septembre 2002

Civil/Structure Engineering, GPA 2.90 of 4.00

Specialties & Skills

Pipeline Design
Project Management
Pipeline Analysis
Installation
Pipeline Engineering
Engineering Management
Project Management
Project Engineering

Langues

Anglais
Expert
Indonésien
Expert

Adhésions

Indonesian Oil and Gas Community
  • Member
  • June 2006
Indonesian Pipeline Engineering Community
  • Member
  • May 2008
Indonesia Engineer Community
  • Member
  • October 2002

Formation et Diplômes

H2S Training (Formation)
Institut de formation:
OPITO
TBOSIET (Formation)
Institut de formation:
OPITO

Loisirs

  • Exploring new environment and knowledge