projects manger
s.a
Total years of experience :16 years, 6 Months
projects studies H.V.A.C
pricies analysis
materiales submitales
mechanical works cordination with construction schadual
supervisorof supliers, subcontractores, manpoweres in the site
a/c load calculation
duct disign
shop drowing preperation
pipe line design
pumps design
water chillers, package units, centeral splits installation
B.M.S control installation
testing, startup, commetioning of a/c system
air and water balance
plumping work installation
fire fighiting work installation
operation and maintainanceof natoinal gaurd (dammam)
a/c -power generatores -plumping -
operation and maintainanceof riyd bank branches in eastern area general maintainance-a/c-electercal
operation and mainainanceof a/cwork in K.F.U 15000 TONS
operation &maintainance for gas turbines(G.E ) 25 M.W
(major -minor -routine -overhauling ) maintainance
hot gas path inspection(1st stage nozzel-2nd stage nozzel-fan bleeds-cross fire tube- c.chambers ----- etc )
compressor 17st (, fuel, oil, water )pumps, air filters inspection, maintainance
operation &maintainance for gas turbines(HISPANO SWIZA ) 5 M.W
operation &maintaioperation &maintainance for DEISEL ENGINE 5.8 K.W MODEL FANCATIERI
operation &maintaioperation &maintainance for DEISEL ENGINE 2.5.(M.W) MODEL WARTSLLA
meduim voltage 11K.V , 22 K.V