mechanical drafter
LOTTE Engineering & Construction Co
Total years of experience :6 years, 11 Months
South Korean), Ltd. as draftsman for the following project :
• Al-Manakher (IPP3) Power Project with Piping Engineering Department. In Amman - Jordan Working on piping layouts, equipment layouts, piping isometric as well as steel works such as platforms for information. Still working with the above-mentioned project up to date for additional site modification drawings and as-built drawing works, period from 28/04/2013 till 30/05/2014.
Fichtner Water & Transportation (Germany) as draftsman for the following project :
• Energy Efficiency in the Jordanian Water Sector, the work included preparation of general layouts for approximately 115 wells and 3 pump stations, preparation of details piping and instrumentation diagrams, preparation of civil guideline drawings, detailed civil design drawings etc., maintaining the drawings as per project identification system, from 01/07/2014 to 31/10/2014
Saudi Bin Laden Group ( Saudi Arabia ) as draftsman for the following project :
• The Extension of the Holy Mosque (Haram) and Surrounding Elements in Makkah Almukarama with mechanical section, the project consists of a five floors and four Mezzanine floors between, Working on Firefighting & Plumbing Systems, Preparing the Shop drawings & as built Drawings.
project identification system
Saudi Arabia ) as draftsman has work shop drawings & As built drawings for the followings Projects :
• Project to establish a treatment plant wastewater in Khamis Mushayt which cost more than 35 Million Saudi Riyals, Which consists of the aeration and Clarifiers tanks, chlorine contacts tanks, In addition to the rooms electricity and pumping stations for the period from 11/06/1998 until 02/11/2012.
• Project sewage network in Najran first phase cost value 34 million Saudi Riyals under the supervision of the Office of Khouzam Engineering Consultants, Which consists of a network of primary and secondary lengths of 80 km various depths in addition to pumping stations and expulsion in the project for the period from 01/08/2002 till 10/10/2005
• Project buildings Border Guard in Asir, which consists of a group concerns administrative buildings and workshops in addition to the building, engineering and leadership club and dormitories, I was worked all Shop drawings, as built drawings & Different Architectural, Structural details Total areas of 20, 000 m 2 under the supervision of engineering management, led by border guards and for the period from 12/12/2005 till 25/10/2008.
•Project to establish Khamis Mushayt General Hospital capacity (150 beds) and with a total value of 71 million S.R, Which consists of a two floors main building and building services with a total area of 7500 m2 and the general location, the work included Shop drawings, as built drawings & Different Architectural, Structural details which required for site, for the period from
Basil Shehab Office As draftsman for residential projects different areas and projects malls, restaurants, tourist city of Jerash - Jordan and for the period from
diploma in architectural engineering