Technical Maintenance/ turbo machinery
Kuwait Oil Company
Total des années d'expérience :24 years, 4 Mois
- Condition & Monitoring GE MS-5002 C a gas turbine compressor, Screw compressor for air instrument, Reciprocating compressor for fuel gas turbine compressor, DPDU compressor for rich gas at BS-180 Kuwait Oil Company (Booster Station 180 KOC).
- Ensure reliability GE MS-5002 C a gas turbine compressor, Screw
compressor for air instrument, Reciprocating compressor for fuel gas turbine compressor, DPDU compressor for rich gas.
- Drains equipment of any residual fluids, chemicals, milled materials etc. Ensures that all residues is drained off appropriately, to enable a clean and safe working environment.
-Prepared reports and recommendation to section head and engineering for corrective action.
- Minimize defect on units.
- Maintain and oversee the critical parts for Rotating equipment at BS-180 plant.
- Assist other team leader on execution such as Preventive Maintenance 1000 & 8000 hours repair maintenance, lubrication, inspection and Trouble Shoot For GE MS-5002 C a gas turbine compressor, Screw compressor for air instrument, Reciprocating compressor for fuel gas turbine compressor, DPDU compressor for rich gas.
- Supporting Vibration team to analysis and estimate the reliability a gas turbine engine to prevent unplanned shutdown due to vibration on units.
- Assist start up and shut down DPDU (Dew Point Depressuration Unit) Compressor at BS 180 Kuwait oil company area
- Assist start up and shut down a gas turbine (GE MS-5002 C) for driven compressor
- Weekly trial for Fire water pump.
- Montly trial for emergency Generator Diesel.
- Check and inspection DPDU equipment such as chiller, chiller ko drum, gas exchanger, slug catcher, scrubber, and condensat separator.
- Lock-out equipment to ensure a safe working environment at all activities in accordance with company safety procedures and manufacturers.
- Removes lock-out to reactivate equipment Coordinates with Plant Operator to observe and test-run equipment to ensure efficient operation.
- Reviewing the hazards and control of the work permit before the permit is approved by the section head
- Condition & Monitoring SOLAR Gas Turbine for Compressor and generator at PHE ONWJ (offshore north west java).
-supervisory reliafer personel’s turbine group on the other station.
- Writes and submits reports for recommendation to Team leader and engineering regarding predictive maintenance requirements of equipment, tools and consumable requirements for corrective action.
- Maintain and oversee the critical parts for SOLAR a gas turbine engine at station.
- Support trouble shoot and diagnose cause of mechanical malfunction or failure of operational equipment and performs preventative and corrective maintenance at the other station.
- ensured reliability SOLAR a gas turbine compressor and generator.
- Minimize defect on units.
- Provided information uninterrupted from PHE ONWJ (offshore north west java) to Indoturbine team leader on Jakarta.
- Performs critical preventive and Preventive Maintenance 1000 & 8000 hours, repair maintenance, lubrication, inspection and Trouble Shoot For SOLAR a gas turbine Engine.
- Replaces and adjusts packing and seals. Performs routine and preventive maintenance on specialty equipment
- Replacement and install Solar gas turbine, Repaired / Recondition turbine component, Stripping Down Compressor, boroscope inspection, alignment between engine and compressor, recondition and installed Lube Oil Pneumatic stater, auxiliary seal oil pneumatic stater, Pneumatic motor stater, inspect and cleaned fuell nozlle, repair and installed Main lube Oil pump, repair and installed main seal oil pump, repair seal gas and seal oil regulator, replace and repair bleeder valve and drain valve, recondition and installed bearing capsule for compressor, recondition primary valve, replace secondary valve, replace fuel gas control valve, etc.
- Supporting Vibration team to analysis and estimate the reliability a gas turbine engine to prevent unplanned shutdown due to vibration on units
- Lock-out equipment to ensure a safe working environment at all activities in accordance with company safety procedures and manufacturers.
- Removes lock-out to reactivate equipment Coordinates with Plant Operator to observe and test-run equipment to ensure efficient operation.
- Familiar and capable at SOLAR a gas turbine compressor.
- Follows all safety instructions and notices, and wears protective equipment at all times.
- Ensure implementation of the operational HSE Management System to ensure all staff observes standard HSE processes and operating procedures.
- Ensure implementation of ISO 14000 during on work area.
- Ensure implementation of ISO 18001 during on work area.
- Carries our good housekeeping by ensuring area is left clean and tidy that no tools are left lying around.
- Study work scope JT8-D engine by prat & Whitney before a engine visit to shop, and create bill routine component’s required in accordance with AD/SB.
- Supervise serviceable part and applicable part for JT8-D engine.
- Preparation report for JT8-D engine after visit to shop.
- Update JT8-D a engine logbook.
- Input and update engine control monitoring report by engineer on board
- Make schedule for production & good departure.
- Check & received document part import.
-Maintain stock level part for production base on First in first out
- Prepare good materials/finish good for customer and export.
- Prepare row material for production base on First in First out.
- Maintain machine performed base on parameter and manual books.
- Trial new model for Spark plug production.
- Make and improved tool’s for production.
Final Project title in ITI Analysis Failure of cart (at) NUT MATERIAL