Senior Facilities Engineer
Qatar Foundation
Total years of experience :37 years, 0 Months
- Education City
Facilities Management Operations & Maintenance
in-charged for 59 buildings, FM
pool vehicles 20 nos., FM-O&M Directorate member of the Maintenance Support Contract Tender
Committee, in line with our directorate objectives on its operations & maintenance, managed the
execution & performance to optimum level that is comparable or better than any external service
provider in terms of customer satisfaction and operating cost. Drive focused on reliability centered
maintenance on root cause analysis and failure mode & effect analysis. PLAN-OPERATE-MAINTAIN-
AUDIT.
- Logistics & Event
. 1987
- my entry position in 5-star hotel career, hands on operations, repair & maintenance, installation
responsibility for cold & hot handing equipment, fluid handling equipment, kitchen & laundry
equipment grounds maintenance equipment, fire & safety equipment, HVAC, MEP,
instrumentation, window cleaning cradle, catering equipment, delivery & catering vehicles.
7. BARMAP Contractors - Gen. Engineering & Marine Works, Paranaque,
Metro Manila, Philippines
Sales/
- as delegated by my Chief Engineer, managed specific engineering team & project contractor
team for standards, efficient, cost effective, within the approved budget, compliant to all legal
& statutory regulation in performing- executing the hotel operations, maintenance, repairs on
security-fire-safety installations, projects-up grades modification, trouble shooting, root cause
analysis activities & testing of facilities system and equipment to ensure that plant facilities are
available for use to safely support front of the house, back of the house, grounds, recreation-
marine facilities.
- 1996 Engineering focal point during the ‘17th GCC Head of State Summit, Dec .7 -9, 1996’
member of the Organizing Committee, responsible for the summit venue. Attended 6 months
series planning meetings (before event-during event- after event) of various government
agencies, hotel’s other departments & General Manager.
- Submitted event ‘Emergency/Crisis Plan’ to my Chief Engineer for his approval & distributed
E/CP electronic-printed copies to stakeholders 5 months before the event. The summit was
completed with great success & I was one of the few that received a commemorative wrist
watch Award by the 17th GCC Head of State Summit 1996 ’ organizing committee.
Renaissance 1000 South Tower, Ortigas Center, Metro Manila
- Property developer owner representative to the building contractor on the final
construction phase & building completion handover. Started up the organization of the
condominium association conducted the election of officers, also the start up of property
management office administrative, operations & maintenance, hard & soft services, security and
the health & safety of the building commercial space tenants & residential units occupants,
established & formulated, approval of the property lease rates, association dues rates, house
rules/handbook for condominium residents & commercial space tenants.
-
Pre-opening team member & reviewed engineering facilities newly installed equipment
commissioning performance data over the design parameters and provided the Chief Engineer
report & recommendation for his consolidated technical report to the Hotel building contractor
for as required rectification or warranty snags claims for action. Provided the optimized start up
maintenance team organization head count & set up the PPM, CM, RCM, quality & audit, project,
fire & safety, emergency evacuation plan, energy resources procedures/ scope of work. Sustained
activities, implementation focus on quality, economical operations & maintenance activities
but with high customer satisfaction, high equipment and facilities availability for use.
–