PROJECT SCOPE: - LNG Storage Tanks and Outer Tank Pump Pre-cast & structural Platforms, Loading Lines and Berth Construction, Balance of Plant (BOP) Civil Works, including Utility ditches and trenches, Firefighting (FF) networks, Sewage, stormwater, and drainage systems, IDB & EDB duct banks for electrical and instrumentation services, Cathodic protection systems and earthing grids, Civil interface works for HV/LV cable laying, jointing, termination, and support to pre commissioning and commissioning activities, Implementation of utility protection measures, including: Concrete encasement, Waterproofing and insulation, Marker and warning tapes, Corrosion protection systems.
LNG Storage Tank & Pump Platform Civil Works:
• Executed and supervised civil construction works for LNG storage tanks and outer tank pump platforms, including precast and structural platforms, in compliance with IFC drawings, EPC specifications, approved ITPs, and LNG industry standards.
• Managed precast structural elements for pump platforms, including design and shop drawing review, fabrication coordination, transportation, heavy lifting, erection, alignment, grouting, and final acceptance, ensuring construction readiness for cryogenic pump and piping installation.
• Ensured strict control of dimensional tolerances, embedment plates, anchor bolts, and structural interfaces critical for pump alignment, vibration control, load transfer, and operational safety in LNG service.
• Coordinated pump platform civil works with mechanical, piping, and E&I teams to ensure seamless interface with equipment foundations, pipe racks, and commissioning requirements.
Loading Lines & Berth Civil Works:
• Supervised BOP civil works for LNG loading lines and berth construction, including foundations, trenches, pipe supports, and associated concrete works.
• Coordinated with mechanical and marine teams to ensure correct levels, alignment, and interface readiness for LNG loading systems.
Underground Utilities & Infrastructure Works:
• Supervised construction of underground utility networks, including Firefighting (FF) systems, Sewage systems, Stormwater and drainage networks, Utility ditches, and service trenches.
• Executed IDB & EDB duct banks for electrical and instrumentation services, ensuring correct routing, spacing, concrete encasement, and protection.
• Ensured proper setting out, slope control, bedding preparation, backfilling, and compaction, meeting project specifications, and Qatar Energy standards.
• Coordinated with multi discipline teams to prevent clashes and ensure smooth interface execution.
Coordination: Coordinated with Qatar Energy, Worley, subcontractors, and EPC teams to support planning, progress monitoring, ITR completion, system walkdowns, and final handover, including close out documentation.
Commissioning & Handover: Managed civil interfaces for HV/LV cable trenching, laying support, jointing, and termination, supporting pre commissioning and commissioning readiness. Ensured compliance with Qatar Energy quality and HSE requirements, closed IRs, NCRs, and punch items, and supported ITR completion and system handover.
Ensured compliance with project specifications, method statements, ITPs, and quality plans, closed IRs, NCRs, and punch items. Implemented Qatar Energy and Samsung C&T HSE requirements, including PTW systems, excavation permits, and toolbox talks.
- مجال الشركة:
- الهندسة المدنية
- الدور الوظيفي:
-
النفط والغاز
الموقع الشخصي