Frontier Works Organization
Total years of experience :3 years, 8 Months
January 2014 to Date
Frontier Works Organization (Sehwan to Rtaodero)
• Cross Section of Highways
• Super elevation
• Structure of Bridges
• Box culvert
• Pipe culvert
• Retaining walls
• Side drain
June 2013 to December 2013
XuChang Guangli Highway Construction Company
FERP Hala To Moro South Bond N-5
• Cross Section of Highways, super elevation roads and Structure Drawings of bridges
December 20, 2010 To May 2013
MM Pakistan (Pvt) Ltd.
Water Sector Improvement Project
Prepared of structural drawings for the following components of the project: • Location Maps of the different packages (B2 Components)
• Feature Maps
• Structural Drawings
- Reinforcement Drawings of Head Regulators
- VRB layout plan and section drawings
- Foot bridges plan and sections drawings
- Washing ghats plan and section
- Buffalo wallows plan and section
- FO office buildings
- Rd Markers
- Stone pitching
- Typical discharge measurement section
- Pipe culvert
- Typical drawing section
- Cross sections
- L-sections
- Fall structures
- Outlet structures
- MIS Features using Google Earth Software
• Software used for the designs (AutoCAD), Google Earth, Microsoft Excel and PDF softwares.
WSIP- REHABILATION AND IMPROVEMENT OF CANAL SYSTEM
Presently Working On Water Sector Improvement Project at MMP Hyderabad Office
• Preparing Index Plans of the Project.
• Preparing Standard Structural Drawings.
• Processing Survey Data.
• Preparing X-sections of Minors and Distributaries under all three Area Water Boards viz; Nara Canal Area Water Board, Left Bank Canal Area Water Board and Ghotki Feeder Canal Area Water Board.
• Preparing L-sections of Minors and Distributaries under all three Area Water Boards viz; Nara Canal Area Water Board, Left Bank Canal Area Water Board and Ghotki Feeder Canal Area Water Board.
Overall Experience Designation Time Duration
• Saleh Saleem Architect & Associates
Computer operator/Land surveyor
1 year
• Marketing & Exhibitor Supervisor 3 years
• MMPakistan AutoCAD operator 2 years
• XuChang Highway Construction AutoCAD operator 6 months
• FWO AutoCAD operator 3 months
Domicile
• District Dadu
2013 Education Course/Certificate Institute Year
• Civil Draftsman Vocational training (Karachi) 2012
Degree/Certificate Institute Year • B.Sc University of Sindh 2011
• AutoCAD (2D & 3D) Aptech 2009