الخبرة العملية

مجموع سنوات الخبرة :13 years, 7 أشهر

Senior Planning Engineer في Aqua Arabia
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ نوفمبر 2020

•• Supervising of Planning Team.
• Developing and implementing plans.
• Create and oversee Master Project Plans
• Providing feedback on schedule quality.
• Ensure that the cost of the project is according to the project budget.
• Reflect any technical change on the project to the project cost either more or less.
• Invoicing of payment.
• Performance monitoring using control measures.
• Coordinate schedules, deliveries, and work tasks involving other teams or staff members.
• Preparation of action plan with the project manager.
• Liaising among internal units and with external vendors.
• Preparation of look ahead program.
• Preparation of progress report and submission to the client.
• Preparation of delay analysis according to the project record.
• Follow-up with engineering team or engineering contractors the preparation of engineering documents.
• Link the engineering designs (data sheets, drawings … etc) to the procurement of the materials
• Prepare engineering control measures.
• Prepare procurement control measures and follow-up with the manufacturing schedule of the equipment or materials.
• Follow-up with construction team at site on construction progress.
• Get updates on the problems at site and how it effects the project schedule.
• Prepare construction measures.
• Arrange for scheduled meetings and prepare the agenda for that.
• Payment claims according the contractual payment terms.
• Update project schedule.

Planning Engineer في Centroid technical cervices
  • السودان - الخرطوم
  • أبريل 2014 إلى مارس 2020

• Reviewing and managing contractors Schedules.
• Reviewing resources usage against the schedule and recommending/taking corrective action where required.
• Ensuring proactive project planning, stakeholder relations, and risk management takes place across projects.
• Preparing and updating the schedules of all running & future projects in Primavera P6 Professional.
• Creating and reviewing baselines, recovery/revised and updated periodic schedules.
• Reviewing Project Managers/ Resident Engineer's weekly reports and provide Schedule inputs as required.
• Incorporating additional works into Schedules as required and updating / maintaining additional works logs.
• Establishing Issue Register and follow-up issue's impacting the project’s schedule.
• Generating detailed and executive summary reports for higher management.
• Monitoring and analyzing progress & efficiency of the project and report to supervisors and managers.
• Assisting in the reviewing and preparation of documents to support claims management and in particular extensions of time.
• Follow up with the contractors the progress of the materials and delivery and inspection at site.
• Follow-up with construction team (PMC)
• Arrange for progress meeting with the contractor.
• Review and approval of payment claims submitted by the contractors

Planning Engineer في star contracting
  • السودان - الخرطوم
  • مارس 2010 إلى مارس 2014

• Preparation of over-all project schedule including engineering details, procurement, construction and commissioning and revise the program during the execution as required.
• Creation and review of tender schedule during bidding phase.
• Resources planning and schedule monitoring.
• Payment claims based on project progress and contractual payment terms.
• Preparation of all supporting documents for any claim of extension of time.
• Generation of Cash-flow considering project expenses (whether it is sub-contractors, rental of equipment and cost of materials) and the project payment from the client.
• Performance monitoring using control measures.
• Preparation of schedule of manpower and equipment.
• Loading of materials quantities and time duration required to deliver the materials.
• Preparation of weekly and monthly report.
• Preparation of action plan with the project manager.
• Preparation of look ahead program.
• Preparation of progress report and submission to the client.
• Preparation of delay analysis according to the project record.
• Follow-up with engineering team or engineering contractors the preparation of engineering documents.
• Link the engineering designs (data sheets, drawings … etc) to the procurement of the materials
• Prepare engineering control measures.
• Prepare procurement control measures and follow-up with the manufacturing schedule of the equipments or materials.
• Follow-up with construction team at site on construction progress.
• Get updates on the problems at site and how it effects the project schedule.
• Prepare construction measures.
• Arrange for scheduled meetings and prepare the agenda for that.
• Update project schedule.

الخلفية التعليمية

دبلوم, Forensic Schedule Analysis
  • في College of Contract Management United Kingdom
  • ديسمبر 2023
الثانوية العامة أو ما يعادلها, Process Integration
  • في Universiti Teknologi Petronas
  • يناير 2010

in

بكالوريوس, Chemical Engineering
  • في Geizera University - Wad Madani
  • يناير 2008

in

Specialties & Skills

Project Plans
Planning
BRIDGES
CABLING
CASH FLOW
CONSULTING
CUSTOMER RELATIONS
DELIVERY
MATERIALS MANAGEMENT
MEETING FACILITATION
MICROSOFT EXCEL

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس