plumber
Tulu Moye geothermal operation PLC
Total years of experience :7 years, 7 Months
I started working in may 15/2021-January 22/2024 and have worked The types of work construction and maintenance in geothermal drilling projects. The type of work I have done is HDPE pipe, welding and fitting, GS pipe, UPVC pipe, Victaulic pipe cutting grooving and welding and other pipe laying and fitting work, and welding various metals and a light car driver I have enough knowledge and experience in these works
I started working under Mikada Engineering in December 2019 and have worked on various projects. I have done piping and pressure testing on Aluto Geothermal Project, I have done piping and fixture installation for toilets in dormitory and cafe buildings in Horo Guduru University, I have been doing general sanitation work and control of water lines in Arjo Gudetu Road Project. I stopped working with them voluntarily and they fired me legally.
I first started my career with Abebe Negash General Contractor and gained a lot of experience from them. I have also done many different drinking water projects with them for rural areas and different cities.The type of pipe I was working on was HDPE pipe welding and fitting, DCI pipe installation, UPVC pipe installation, GS pipe installation and borehole works and various sanitary works. Since I was hired as a junior professional, the salary paid to me was low, and the improvement made to me during my tenure was not commensurate with my work, so I was forced to leave the job on my own accord.
Since January 2016for the past eight years i have been employed under various deep organization and have worked on many drinking water and sanitation project and have sufficient knowledge and experience . The last company i worked for was the country's first geothermal project and i had better experience from them. At present the company has closed the project due to various rseasons and now i am currently unemployed.