SURF Engineer
Premier Oil Indonesia
Total years of experience :17 years, 2 Months
Supervise EPCI contractor in subsea related works i.e. pipeline, umbilical, flexible flowline, flexible riser and subsea structure and ensuring on-time and quality submission of contractor documents
•Supervised Site Integration Test (SIT) for integration of tree and SCM.
•Engaged internal and external party for execution of SIT
•Supervise line pipe contractor on the line pipe production and ensuring on-time delivery as per contract
Established mutual agreement sales plan with channel partner
•Promoted products and solutions in Indonesian market to meet orders, sales and margin
•Managed the sales proposal process from opportunity identification through contract flow down to key organizations
•Built customer relationships and communication
•Supported operations in customer credit and collection
Updated company standard specifications for horizontal tree, vertical tree and manifold piping by adapting personal experience, latest industry standard and lesson learnt from previous tenders.
•Trained and mentored young engineers to understand the complete cycle of subsea production system and improved awareness of developing clear requirements for a project.
•Reviewed and provided inputs to contractor documents related to manifold, connection system, tree system and workover system in Angola 15/06 East Hub Project
•Prepared tree schematic drawing and data sheet for tree standardization project.
•Reviewed and provided inputs to contractor documents in tree standardization project.
•Reviewed and evaluated bid documents in Argo Project for tree and wellhead systems. Provided recommendation of the bid documents to Company and provide response to bidders exceptions/technical queries on behalf of Company.
•Provided documents related to subsea structures including assembly schematics, data sheets, scope of work, input to pre-commissioning/commissioning philosophy, input to basis of design, for North Port Said (NPS) Stranded Gas Project, Egypt.
As Tender Technical Manager during tender:
•Led and managed a tender team that consist of flow assurance, tree system, well access /intervention system, subsea control system, manifold system, tie-in & connection system, material, welding and reliability to deliver quality tender technical documents in time.
•Implemented internal process e.g. technology gas assessment, technical design review and commercial review
•Managed communication with clients for clarifications & exceptions. Finalized all clarifications & exceptions prior to bid submission.
•Produced system tender documentations e.g. system technical write-up, master equipment list, field schematic drawing, master document register
•As Lead Engineer during study/FEED:
•Led and managed a team that consist of flow assurance, tree system, well access /intervention system, subsea control system, manifold system, tie-in & connection system, material to deliver quality technical documents as per agreed scope in time.
•Maintained good communication with customer and technical team to achieve mutual understanding on the development /FEED concept and resolve technical issues on system and product level
•Provided optimization on field layout which covers for umbilical/pipeline route optimization and subsea production equipment location optimization
•Developed and issued system FEED/study documentations e.g. basis of design, system schematic, field layout, master equipment list and outline test program
•As System Engineer during project execution:
•Developed and issued system project documentations e.g. basis of design, system schematic, field layout, master equipment list, weld matrix, material matrix and company provided item register and outline test program.
•Managed and responded technical queries, exceptions and interface register with inputs for relevant parties.
•Ensure all submission of project document as per agreed master document list and project schedule
•Performed design review with involved product groups e.g. tree, manifold, control system, connection system and well access/intervention system.
•Supported site integration test
Marine Engineering Services, Jakarta Indonesia
Achievement:
•Lead and managed FEED team that consist of subsea control system, pipeline, flow assurance, instrumentation subsea structure and material to deliver quality FEED technical documents in time
•Produced FEED documentations e.g. system technical write-up, HPU modification schematic, topside control hydraulic schematic, tree schematic, manifold schematic, field schematic, project cost estimate report, master document register
•Specified requirements for “request for quotation” process for supply of subsea valves, subsea piping fittings, subsea production system equipment, umbilical and subsea equipment installation
•Reviewed and updated company specification for subsea control system, tree system and manifold system
•Provided technical support in reviewing client project documentation prepared by client other contractors
•Provided technical documents during tender process
Experience:
•Project Support:
•Kangean Energy, Terang Sirasun Batur Project (project support), Indonesia 2010
•FEED:
•ConocoPhillips, Bawal Subsea Development FEED, Indonesia 2009-2010
•Tender:
•Pertamina PHE, Engineering Support, Indonesia 2010 (win)
Prepared scope of work document, engineering estimate and performed execution of subsea equipment maintenance, subsea IMR and diving intervention
•Participated in contract negotiation with bidders for subsea equipment maintenance contract, subsea IMR contract and diving intervention contract
•Developed maintenance schedule for topside subsea equipment
•Performed diagnosis (troubleshooting) on subsea equipment problem both topside and subsea
•Produced diving intervention programs to be performed offshore.
•Supervised diving intervention operations and IMR, as Company Representative onboard a DSV / vessel
•Established and maintained subsea equipment spare database
•Provided inputs in operations aspects to Projects Department in the ongoing subsea projects
Experience:
•Hiu subsea wells repair 2009 (SCM replacement and SCSSV lock-open tool installation)
•Hang Tuah subsea production system repair 2007 (Pipeline clamp installation and EFL & SCM replacement
, Projects Department, Jakarta Indonesia
Final Project: Experimental Study of Latex and Fly Ash Addition Effects to Concrete Dampening Properties.