Zekai Yurtman, Electrical & Instrumentation Design Manager

Zekai Yurtman

Electrical & Instrumentation Design Manager

CALIK Energy

Lieu
Turquie - Istanbul
Éducation
Baccalauréat, Engineering and Architecture
Expérience
19 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 10 Mois

Electrical & Instrumentation Design Manager à CALIK Energy
  • Turquie - Istanbul
  • Je travaille ici depuis juillet 2023

Following and managing electrical and instrumentation systems engineering works, coordination with site works and coordinating with procurement & logistic department.

ELECTRICAL & INSTRUMENTATION WORKS SITE MANAGER à ENKA
  • Libye - Tripoli
  • juin 2021 à juin 2023

Managing all electrical and Instrumentation site works, coordinating with Client/Consultant and
coordinating & reporting with other construction departments.

Electrical & Automation Manager à Lineer Metal
  • Turquie - Istanbul
  • septembre 2020 à juin 2021

Following and managing electrical-automation & instrument engineering design and implementation works

Procurement & Electrical Manager à INCO
  • Émirats Arabes Unis - Dubaï
  • juin 2019 à août 2020
Senior Electrical Engineer à Berksan Engineering
  • Émirats Arabes Unis - Dubaï
  • mai 2018 à juin 2019

ROUTE 2020 METRO RAIL PROJECT
ELECTRICAL LEAD DESIGN ENGINEER

Electrical Design Manager à GAP İnşaat
  • Turquie - Istanbul
  • mars 2017 à mai 2018

Managing Electrical Design team&design subcontractors and coordinate/prepare project designs, calculations (grounding, cable size, short circuit, load flow..), systems and equipment’s
specifications preparation and following procurement activities

Country Manager à MT Electric
  • Arabie Saoudite - Riyad
  • avril 2014 à février 2017

- Business Development and Customer Relations
- Project Execution and Project Management
- Team Organization and Management
- Offers, PO’s and Agreements Preparation
- Contract Management

Senior Electrical Engineer à SIEMENS SAN
  • Turquie - Istanbul
  • janvier 2011 à mars 2014

2011 to 2014
SIEMENS SAN ve TIC A.S.
Senior Electrical Engineer
SAUDI ARABIA, Ras Al Khair 2400 MW Combined Cycle Power Plant (ON-GOING)

Project is included 18 kV Siemens SGT6-5000F Gas Turbine and Generators, 16.5 kV Siemens
SST6-5000F Steam Turbine and Generators, 400/18 kV - 400/16.5 kV Step Up Transformers,
380 kV Gas Insulated Breakers, 380 kV underground HV XLPE cable lines, isolated phase
busduct systems, 18 kV Generator Circuit Breakers, 18/13.8kV UAT Transformers, 13.8 kV MV
Distribution Switchgears, 6.6 kV MV Distribution Switchgears, 11/0, 4kV transformers, 0, 4 kV
LV distribution switchgears, Black start diesel and emergency diesel generator systems for emergency power distributions.
Following engineering activities included: Sizing calculations of the main electrical equipments,
lighting design and calculations, Lightning protection design and calculations, grounding design and calculations, cable routing, electrical equipments layouts and arrangements.


1
My responsibilities are as follows;

Project designs, calculations (transformers & diesel generators sizing calculations, cable
sizing calculations..), systems and equipments specifications preparation, site
test/commissioning activities and following testing jobs:
a- Preparing design drawings and documents list.
b- Design Specifications for HV, MV and LV transformers.
c- Design Specifications for MV and LV switchgears.
d- Design Specifications for Isolated Phase Busducts
e- Design Specifications for Generator Circuit Breaker
f- Design Specifications for DC/UPS Systems and batteries
g- Design Specifications for HV, MV, LV, Control and instrument cables
h- Factory & Site Tests and commissioning of the HV, MV and LV transformers.
i- Factory & Site Tests and commissioning of the IPB
j- Factory & Site Tests and commissioning of the GCB
k- Factoy & Site Tests and commissioning of the MV and LV switchgears.
l- Factory & Site Tests and commissioning of the DC/UPS Systems and batteries
m- Factory & Site Tests and commissioning of the HV, MV, LV, Control and instrument
cables
n- Site coordination/interface meetings attendances
o- Site Product change/revisions management and material supply coordination
p- Site installations / supervisors management
r- Preparing installation procedures and method of statements
s- Preparing site tests and commissioning procedures

Electrical Design Team Leader à ENKA TEKNIK General Contracting Maintenance Operation and Management Inc
  • janvier 2006 à janvier 2011

2006 to 2011
ENKA TEKNIK General Contracting Maintenance Operation and Management Inc.
Electrical Design Team Leader
LIBYA, Obari 4x160MW Power Plant

Project is included 15.75 kV Siemens SGT5-2000E Gas Turbine and Generators, 220/15.75 kV
Step Up Transformers, 220 kV underground power distribution lines, isolated phase busduct
system, 15.75 kV Generator Circuit Breaker, 15.75/11kV Transformers, 11 kV MV Distribution
Switchgears, 11/0, 4kV transformers, 0, 4 kV LV distribution switchgears, emergency diesel
generator systems for emergency power distributions. DCS (Distributed Control System) for
Turbine and BOP Equipments Control. DC/UPS Systems, telephone, data, fire alarm, CCTV,
paging, public address system included. Crude Oil Pumping Stations

My responsibilities are as follows;
Managing Electrical Design team and coordinate/prepare project designs, calculations
(grounding, cable size, short circuit, load flow..), systems and equipments specifications
preparation and following procurement-testing jobs:
a- Preparing tender design drawings and documentation.
b- Preparing tender procedure.
c- Finishing tender, select supplier and erection works subcontractors.
d- Procurement for HV, MV and LV transformers.
e- Procurement for MV and LV switchgears.


2
f- Procurement for Isolated Phase Busducts
g- Procurement for Generator Circuit Breaker
h- Procurement for DC/UPS Systems and batteries
i- Procurement for telephone, data, fire alarm, CCTV, paging, public address system
j- Procurement for MV, LV, Control and instrument cables
k- Factory tests for HV, MV and LV transformers.
l- Factory tests for MV and LV switchgears.
m- Factory tests for MV, LV, Control and instrument cables
n- Factory tests for Isolated Phase Busducts
o- Factory tests for Generator Circuit Breaker
p- Factory tests for DC/UPS Systems and batteries
r- Site coordination/interface meetings attendances
s- Site Product change/revisions management and material supply coordination
t- Site installations / supervisors management
s- Preparing installation procedures and method of statements
t- Preparing site tests and commissioning procedures
u- Preparing electrical systems turn-over packages

ENKA TEKNIK General Contracting Maintenance Operation and Management Inc.
Electrical Design Engineer
LIBYA, Zwitina 2x285MW Power Plant (COMPLETED)

Project is included 20 kV Siemens SGT5-4000F Gas Turbine and Generators, 220/20 kV Step
Up Transformers, 220 kV underground power distribution lines, isolated phase busduct system,
20 kV Generator Circuit Breaker, 20/6, 6kV Transformers, 6, 6 kV MV Distribution Switchgears,
6, 6/0, 4kV transformers, 0, 4 kV LV distribution switchgears, emergency diesel generator system for emergency power distributions. DCS (Distributed Control System) for Turbine and BOP
Equipments Control. DC/UPS Systems, telephone, data, fire alarm, CCTV, paging, public
address system included. LFO Pumping station and RMS (Reducing and Metering Station) and
RMS control system. RTU communicated by Fiber Optic Cables for NCC and AGC.

My responsibility was as follows;
All systems project design, calculations (grounding, cable size, short circuit, load flow..),
systems and equipments specifications preparation and following procurement-testing jobs:
a- Preparing tender design drawings and documentation.
b- Preparing tender procedure.
c- Finishing tender, select supplier and erection works subcontractors.
d- Procurement for HV, MV and LV transformers.
e- Procurement for MV and LV switchgears.
f- Procurement for Isolated Phase Busducts
g- Procurement for Generator Circuit Breaker
h- Procurement for DC/UPS Systems and batteries
i- Procurement for telephone, data, fire alarm, CCTV, paging, public address system
j- Procurement for MV, LV, Control and instrument cables
k- Factory tests for HV, MV and LV transformers.
l- Factory tests for MV and LV switchgears.
m- Factory tests for MV, LV, Control and instrument cables
n- Factory tests for Isolated Phase Busducts


3
o- Factory tests for Generator Circuit Breaker
p- Factory tests for DC/UPS Systems and batteries

ENKA TEKNIK General Contracting Maintenance Operation and Management Inc.
Electrical Design Engineer
LIBYA, Desalination Plants (COMPLETED)

Projects are included, 30/11 kV Power Transformers, 30 kV underground power distribution
lines, 11 kV MV Distribution Switchgears, 11/0, 4kV transformers, 0, 4 kV LV distribution
switchgears, emergency diesel generator system for emergency power distributions. Telephone,
data, fire alarm, CCTV, paging, public address system included.
My responsibility was as follows;

All systems project design, calculations (grounding, cable size, short circuit, load flow..),
systems and equipments specifications preparation and following procurement-testing jobs:
a- Procurement for MV and LV transformers.
b- Procurement for MV and LV switchgears.
c- Procurement for DC/UPS Systems and batteries
d- Procurement for telephone, data, fire alarm, CCTV, paging, public address system
e- Procurement for MV, LV, Control and instrument cables
f- Factory tests for MV and LV transformers.
g- Factory tests for MV and LV switchgears.

Automation erection and maintenance chief à Electrical -Electronics
  • mars 2006 à novembre 2006

03/2006 -11/2006: BALKÜPÜ MB Sugar Factory Sultanhanı / AKSARAY
Electrical -Electronics - Automation erection and maintenance chief

- Following electrical & instrument erection jobs and preparing subcontractor allowance
- Electrical & instrument equipments maintenance chief

Electrolysis pot rooms Electrical & Automation Maintenance Chief à ETI Aluminium Co. / Seydisehir
  • Turquie - Konya
  • septembre 2005 à mars 2006

09/2005 -03/2006: ETI Aluminium Co. / Seydisehir / Konya
Electrolysis pot rooms Electrical & Automation Maintenance Chief

a- Electrical & Electronics maintenance of the Siemens S5 and S7 controlled metal
production pots

Cast Film machines electrical and mechanical chief à NAKSAN Plastik A.S.
  • Turquie - Gaziantep
  • juillet 2004 à septembre 2005

07/2004 -09/2005: NAKSAN Plastik A. . / Gaziantep
Printing, film producing and Cast Film machines electrical and mechanical chief
There have been below listed film and printing machines:
a- W&H Varex, Kiefel, Bandera film producing machines
b- W&H Astraflex, W&H Novoflex, Eryıldız, Scavi.. Printing machines
c- W&H Filex, Primplast stretch film machines
d- Technicol, Brüchel, Primplast turnover machines
e- Lemo, Hudson-Sharp, W&H Polyrex, Hemingston sealing machines


4

Éducation

Baccalauréat, Engineering and Architecture
  • à Anadolu University
  • janvier 2003

University (1998-2003) Anadolu University - Faculty of Engineering and Architecture Electrical and Electronics Engineering

Specialties & Skills

Electrical Engineering
PowerPlant
Powertrain
Calculations
Procurement
Grounding
Power & Distribution Transformers
DIESEL GENERATORS
ELECTRICAL DESIGN ENGINEER
GAS TURBINES
GENERATORS
TESTING
MV & LV Switchgears
Autocad
MS Office
LV/MV/HV Cables
Lightning Protection
Generator Circuit Breakers
AIS & GIS Substation
Isolated Phase Busducts
Sizing Calculations

Langues

Arabe
Moyen
Anglais
Expert
Turc
Expert

Adhésions

EMO - Electrical Engineers Chamber
  • Member
  • January 2004

Formation et Diplômes

Mechatronics (Formation)
Institut de formation:
FESTO
Date de la formation:
May 2005
MS Project (Formation)
Institut de formation:
Bilge Adam
Date de la formation:
May 2007

Loisirs

  • Music, Theatre, traveling, Cinema