Electrical Site manager
ArabTec
Total years of experience :15 years, 9 Months
Project: Construct a Residential compound “SODIC West Town”
The company has executed 44 residential building including all facilities, Parking Areas, Land Scape.
The electrical work includes:
- Installation of all electrical components inside the buildings “MDB - apartment’s panel - lighting system - HVAC System - Submersible Pump System
- Installation of Low voltage cables inside the building.
- Installation of all light current systems "T.V -Telephone - Intercom"
- Installation of connections between the buildings and the outside networks.
PROJECT: Reconditioning the runway of Hurgada International Airport.
After constructing a new runway at Hurgada airport, the airport management decided to upgrade the elder runway including all networks and facilities.
The electrical work includes:
- Construction and Installation of all electrical ducts, pipes and Manholes to create power, lighting and fiber-optic networks
- Installation of all MEP systems inside the electrical power stations “lighting - power - fire alarm - firefighting - Gates “.
- Installation of all equipment at the electrical power stations "Transformers - Ring Main Units - MDB - UPS - CCR - Generators”.
- Supervise the installation of all Earthling works for the project.
PROJECT: (Residential compound "Palm Hills Village Gardens Katameya").
The project contains modern stand alone villas, townhouses and apartments and includes lushly landscaped gardens, streets and networks. I am responsible for sector A, which is estimated with the half of the project.
The electrical work includes:
- Installation of all electrical components inside the buildings.
- Installation of all components at the power system rooms "Transformer -Ring Main Unit- MDB"
- Installation of Street lighting Columns and lighting panels.
- Installation of all pillars and dwelling boxes (coffree)
- Supervise the installation of switchgear panels and the connection the M.V terminals with it.
- Supervise the installation of all Earthing works for the project.
Main Duties & Responsibilities:
-Generally responsible for implementations and monitoring of all electrical related works at site.
-Ensure and prepare the resources such as materials, consumables, equipment, tools, required for all electrical and related works before execution.
- Review design drawings and studies the contract documents and applicable standards or specifications before execution of the project.
-Manages directly a team of Technicians provide engineering and technical support to the entire electrical work group at site.
- Prepare quantity survey and measurements
- Establish invoices and supervise its proper application.
-Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
-Coordinates with the Consultant / Owner’s representatives for any site instructions and inspection of works.
- Ensures that all the works done are in accordance with the approved design drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
- Performs other related duties as may be required by the Project Manager.
From February 2011 - Till Now (NILE MISR for Electro-mechanics)
The Company is electro-mechanics works contractor.
Position: Senior Electrical Engineer.
• Main Projects:
1. Renovation and development of central air conditioning plant at (Hurghada Airport).
The electro-mechanical work included:
- Installation of 3 chillers 550 K.W
- Installation of 11 A.H.U includes 3 fans (supply - return - smoke)
- Installation of all M.C.Cs to operate the machines.
- Installation of cables that feeds all M.C.Cs
- Renovation and development of A.H.Us Hall (lighting and power sockets)
- Installation of BMS to control every machine at the plant
2. The rehabilitation of the (Le Meridian DAHAB Hotel)
The project was constructing a Health club, Gym and Meeting room. The Company was responsible of all electro-mechanic works.
The electrical work included:
- Installation of all electrical components inside the buildings. "Lighting fixtures, panels and all accessory"
- Installation of all light current systems and networks "T.V, Telephone, Data, Fire alarm and Public address"
- Installation of Low voltage networks
- Installation of Medium voltage cables and connections.
- Installation of all components at the power system room "Transformer -Ring Main Unit- MDB"
3. Building an emergency power station for (MARSA MATROH Airport)
The company was the main contractor and there was a subcontractor for civil works.
The electro-mechanical work included:
- Installation of 2 generators 60 K.V.A
- Installation control panels and ATS panel
- Installation of the fuel tanks (daily and monthly)
- Installation of all power connections with the basic electrical station.
- Installation of fire alarm system including the connections with the master system at the air port.
- Installation of all lighting, power sockets and the station service panel.
-responsible for implementations and monitoring of all electrical related works at site.
-Ensure and prepare the resources such as materials, consumables, equipment, tools, required for all electrical and related works before execution.
- Prepare quantity survey and measurements
- Establish invoices and supervise its proper application.
-Plans the execution of all electrical related works and coordinates the works to mechanical and civil groups.
-Coordinates with the Consultant / Owner’s representatives for any site instructions and inspection of works.
- Performs other related duties as may be required by the Project Manager.
PROJECT(Residential city "EL KHAMAIL")
The company has executed 36 residential building including all facilities, streets and networks; I am responsible for a range of buildings estimated with 20 building include its networks.
The electrical work includes: - Installation of all electrical components inside the buildings.
- Installation of all light current systems "T.V -Telephone - Intercom"
- Installation of Low voltage networks
- Installation of Medium voltage network
- Installation of Telephone network
- Installation of all components at the power system room "Transformer -Ring Main Unit- MDB"
- Street and Gardens Lighting network With Installation of lighting Columns
The project was implementation of textile factory "ELVY" at industrial city (BORG EL ARAB), and the company was the electrical works constructor. I participated in that project from the beginning till the primary Recognition
Main Duties & Responsibilities:
Review design drawings and studies the contract documents and applicable standards or specifications before execution of the project.
- Ensures that all the works done are in accordance with the approved design drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
-Prepare quantity survey and measurements
-Ensure and prepare the resources such as materials, consumables, equipment, tools, required for all electrical and related works before execution.
Details of the project
The electrical work included: - Installation of all electrical components inside the buildings. "Lighting fixtures, panels and all accessory"
- Installation of all electrical MCC panels
- Installation of all light current systems and networks "CCTV, Telephone, Data and Fire alarm"
- Installation of Low voltage networks
- Installation of all components at the power system rooms "Transformers -Switchgear- MDB"
- Installation of Medium voltage cables and connections.
2008 - Bachelor Degree in Electrical Power and Machines Department Faculty of Engineering, Helwan University. The Accumulative Grade: 'Good' Graduation Project: design, build and operate a CNC PCB router machine. (Excellent)