Zia Mehdi,

Zia Mehdi

Alarrab Contracting Co. (ACC)

Lieu
Pakistan - Karachi
Éducation
Baccalauréat, Refrigeration and Air-Conditioning Technology( Mechanical)
Expérience
37 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :37 years, 5 Mois

à Alarrab Contracting Co. (ACC)
  • Je travaille ici depuis juin 2017

at King Abdullah Project, Arar KSA, responsible for supervision of mechanical works including Plumbing, HVAC and firefighting.

project coordinator à Arabian pipeline projects Co APPCO
  • Arabie Saoudite - Riyad
  • novembre 2015 à mars 2017

having responsibilities of client ( Owner, s ) representative for ACWA Holding group of companies, the project consisted construction of new offices at Alia Plaza, Riyadh.
I was responsible for construction, completion and handing over of all civil & electromechanical works under the scope of the contract in between contractor and the owner, s the parent company.
Followed technical and financial responsibilities to achieve the scheduled time frame for completion as planned. Resolved contractual issues for all related works upto the satisfaction of the client including work progress invoices, negative & positive variation work and its implementation.

Mechanical Engineer à 2015 -(Arabian Pipeline Projects Company- APPCO)
  • Arabie Saoudite
  • septembre 2013 à octobre 2013

I have worked in Arabian Pipeline Projects Company (APPCO) - Franchise of Toledo Arabia, KSA on, AL-Taif - Al-Baha Water Transmission system Pipeline project as

Mechanical Superintendent à Toledo
  • Arabie Saoudite - La Mecque
  • mai 2013 à août 2013

in Toledo Arabia contracting co. My responsibilities were to supervise installation of District Cooling Plant in Makkah, Saudi Arabia for the consultant SNC ll and client Saudi tabreed,
•Installation of Centrifugal Chillers.
•Execution of site work including piping for Chilled water and cooling water supply and return headers and branches connections to the chillers with valves and accessories..
•Installation of chilled water, cooling water and make up water pumps and piping connections.
•Erection of Cooling Tower.
•Preparation and getting approval of interim payments according to progress of work at site.
•Arrangement of material and supervision of fabrication, fit-up and welding of piping spool as per approved shop drawings, Isometric drawings and according to approved method statement.
•Raising RFIs to obtain work approvals from consultant at site.

Consultants à Al Salam
  • Émirats Arabes Unis
  • mars 2010 à juin 2011

I worked with Salam Consultants for CMW project section, responsible for the supervision of A/C and Mechanical system installations for the projects at different locations

Project Manager à Bin Darwish General Contracting & Maintenance Es
  • Émirats Arabes Unis
  • mars 2010 à juin 2011

to complete the installation of 1st chiller plants for Lusail Development including 3km piping network connected with different ETS, on an EPC contract with Marafeq Qatar ( District Cooling/Utilities Provider ).
•Supervised the projects of District Cooling System of M/S ‘tabreed’ District cooling Provider as a consultant in UAE.
•Worked with Salam Consultants for Command of Military Works project section, responsible for the supervision A/C and Mechanical system installations for the projects at different locations in UAE,

à 2013 ( Bin Darwish General Contracting & Maintenance Es
  • Émirats Arabes Unis
  • juillet 2011 à avril 2011
Mechanical Engineer à consultant Shankland Cox Ltd
  • Émirats Arabes Unis
  • août 2007 à février 2010

Worked in UAE Armed Forces, Directorate of Military Works

à Shankland Cox Ltd.
  • Émirats Arabes Unis
  • août 2007 à février 2010
Project Section à UAE armed forces
  • Émirats Arabes Unis
  • juin 1993 à juillet 2007

During above mentioned period, supervised installations of Central Air-Conditioning Systems including Chillers, Chilled Water Pumps, CS piping, Packaged Type Units, Fan Coil Units, Air-Handling Units, Fresh Air Systems, Fire Suppression system FM-200, EOT cranes, Elevators, Automatic shutter Doors, Fuel Tanks Operating System, Compressed Air System and Grease, Oil Pumps Systems installed in Washing Bay.
•From 1986 to 1992 I have worked in the maintenance department of

Consultants à Emirates District Cooling Company
  • Émirats Arabes Unis
  • janvier 2005 à janvier 2007

I was posted in Dubai and Northern Emirates Military Camps on same job responsibilities as mentioned in details of my experience in Al Salam

à Al Sorouh projec
  • Émirats Arabes Unis
  • janvier 1993 à janvier 2007

for District Cooling client. Pal Technologies.

Responsibilities

•Approval of shop drawings in accordance with hydraulic analysis.
•Approval of material.
•Site inspections for all related works of piping and valve chambers.
•Checking and evaluation of interim payments certificates.
•Correspondence with client and contractors.
•Resolving all technical issues and queries raised by the contractor up to the client’s satisfaction.

à Al Sorouh projec
  • Émirats Arabes Unis
  • janvier 1986 à janvier 1992

underground chilled water piping network, for District Cooling client. Pal Technologies.

•I have supervised the “Building Conversion” jobs from DX system to Chilled Water District Cooling System executed by M/S tabreed on the projects of T2, T3a & T4 in the premises of Sheikh Zayed Military City.(Sweihan) and Minhaad Air Base Dubai.

•My responsibilities in ‘tabreed’ projects were, inspection of various works including, underground CHW piping using HDPE rigid and flexible pipes, Butt Fusion and Electro fusion joints preparations, Polyurethane insulation according to specifications, preparation of valve pits and their accessories, chilled water MS piping, Installation of AHUS & FCUS, Energy Transfer Station ( ETS ) room’s work which have installation of chilled water pumps connected with heat exchanger and their PLC controls etc.

incharge à Habibullah Associates
  • Pakistan
  • janvier 1984 à janvier 1986

HVAC systems maintenance projects. ( Chillers, Packaged & Split type units

Associates à Habibullah
  • Pakistan
  • janvier 1984 à janvier 1986
site supervisor à Engineers & Contractors Ltd
  • Pakistan
  • janvier 1982 à janvier 1984

for the installation & maintenance of HVAC systems. ( Chillers, Packaged & Split Units )

à Engineers & Contractors Ltd
  • Pakistan
  • janvier 1982 à janvier 1984
Project Engineer à Bin Darwish General Contracting & Maintenance Es
  • Émirats Arabes Unis
  • à

Qatar), Responsible to complete the installation of 1st chiller plants ( 10 nos Air Cooled Chillers installed at 3 locations and connected with piping network ) for Lusail Development buildings ETS, including 3km piping network with Marafeq Qatar ( District Cooling Provider ) as an EPC contractor.
My responsibilities were as mentioned:
•Preparation of shop drawings according to site requirements.
•Obtain shop drawings and material approval.
•Monitoring procurement of material and delivery at site.
•Supervise the progress of construction work as per scheduled program of work.
•Conducting progress meetings briefing status of work to the client and discussions to resolve ongoing issues as per contract and specifications.
•Preparation of daily/weekly/monthly progress reports including two weeks look ahead schedule.
•Implement good safety at site during construction activities. Maintain regular HSE inspections and records.
•Preparation of monthly progress invoices and getting approval.
•Since July 2011, worked as Project Engineer for construction, installation & completion of Directorate of Military Works HQ building

Mechanical Engineer à consultants M/S Shankland Cox Ltd
  • Émirats Arabes Unis
  • à

My job responsibilities were the supervision of reticulation piping network of more than 100 Km, (project value-250 Million) for the client

mechanical supervisor à Alarrab Contracting co
  • à
à Directorate of Military Works, UAE Armed Forces
  • Émirats Arabes Unis
  • à

I worked in Project section.Directorate of Military Works in UAE Armed Forces, my responsibilities were the supervision of the installation works of A/C and Mechanical equipment. My site locations were in the premises

Site Engineer à Toledo Arabia Contracting Co
  • à

responsible for the installation of District Cooling Plant at Jabal e Omer, Makkah project, with SNC ll and Saudi tabreed as client.

Mechanical Engineer à Arabian Pipeline Projects Company ( APPCO )
  • Émirats Arabes Unis
  • à
Inspector
  • à

Éducation

Baccalauréat, Refrigeration and Air-Conditioning Technology( Mechanical)
  • à Government College of Technology
  • janvier 1978

courses: /CERTIFICATION •Certificate of Qualification and Training arranged by Directorate of Military Works from LG Electronics by April, 2004. •Microsoft Certified Professional Certification (MCP) in Windows NT server and workstation in year 2000.

Specialties & Skills

Project Supervision
Mechanical Testing
Site Inspection
Project Work
CUSTOMER RELATIONS
MECHANICAL
MICROSOFT WORKS
OIL PAINTING
OPERATING SYSTEMS

Langues

Arabe
Expert
Anglais
Expert
Urdu
Expert