Total Years of Experience: 13 Years, 6 Months
March 2012
To Present
Mechanical Engineer
I found this job using Bayt.com
at Saudi Services for Electro Mechanic Works
Location :
Saudi Arabia - Tabouk
• Riyadh Water Transmission System (SWCC (Piping, Testing, Pre-Commissioning Engineer)
SSEM Construct Three Pumping stations on Riyadh Water Transmission Project with Capacity of 39504 M3 P/H
• Riyadh RO Plants (NWC)
(Piping, Testing, Pre-Commissioning Engineer)
SSEM construct 26 RO Plants & Wells with capacity of 5000 M3 P/D in Riyadh City
• Construction of Four Fuel Tanks & Six Loading Skids (SEC)
(Piping, Testing, Firefighting, Pre-Commissioning, Operation Engineer)
SSEM construct four Crude Oil Tanks, six Loading Skids. Pump House, Tanks interconnection Piping and along with associated auxiliary systems
• Duba Green Integrated Solar Combine Cycle Power Plant (SEC)
(Solar Erection, Solar Piping, HTF Piping, Testing, Engineer)
S.S.E.M with Consortium of Intec Energeia
Constructed Integrated Solar Combine Cycle Power Plant, Which Consist Two Gas Turbine Two HRSG And One Steam Turbine Supported By Parabolic Solar Panels
• Key Responsibilities
•
Provide support for piping design, installation and testing of pressure piping systems.
• Delivered resourceful technical support to Piping Supervisor and ensured construction work complied with all engineering standards, codes, specs, and design instruction while continually communicating with client & Consultant.
• Checking project scope of work and required input data for all engineering activities.
• Participating in concept of design, engineering works, and facilitating the critical technical issues.
• Supervised and inspected the installation and modifications of mechanical systems at construction sites.
• Prepared and Reviewed Material Take off (MTO)
• Updated construction schedule, created productivity reports.
• Supervised and directed drafters generates Red Mark-Up & As Built
• Preparation of QC Documents ( QC Dossier, Test Packages, Parts Data Packages)
• Preparation of Piping Progress & Erection Repots and System Presentations.
• Responsible of Pressure Testing activities of piping systems
SSEM Construct Three Pumping stations on Riyadh Water Transmission Project with Capacity of 39504 M3 P/H
• Riyadh RO Plants (NWC)
(Piping, Testing, Pre-Commissioning Engineer)
SSEM construct 26 RO Plants & Wells with capacity of 5000 M3 P/D in Riyadh City
• Construction of Four Fuel Tanks & Six Loading Skids (SEC)
(Piping, Testing, Firefighting, Pre-Commissioning, Operation Engineer)
SSEM construct four Crude Oil Tanks, six Loading Skids. Pump House, Tanks interconnection Piping and along with associated auxiliary systems
• Duba Green Integrated Solar Combine Cycle Power Plant (SEC)
(Solar Erection, Solar Piping, HTF Piping, Testing, Engineer)
S.S.E.M with Consortium of Intec Energeia
Constructed Integrated Solar Combine Cycle Power Plant, Which Consist Two Gas Turbine Two HRSG And One Steam Turbine Supported By Parabolic Solar Panels
• Key Responsibilities
•
Provide support for piping design, installation and testing of pressure piping systems.
• Delivered resourceful technical support to Piping Supervisor and ensured construction work complied with all engineering standards, codes, specs, and design instruction while continually communicating with client & Consultant.
• Checking project scope of work and required input data for all engineering activities.
• Participating in concept of design, engineering works, and facilitating the critical technical issues.
• Supervised and inspected the installation and modifications of mechanical systems at construction sites.
• Prepared and Reviewed Material Take off (MTO)
• Updated construction schedule, created productivity reports.
• Supervised and directed drafters generates Red Mark-Up & As Built
• Preparation of QC Documents ( QC Dossier, Test Packages, Parts Data Packages)
• Preparation of Piping Progress & Erection Repots and System Presentations.
• Responsible of Pressure Testing activities of piping systems
September 2010
To March 2012
Project Coordinator / Supervisor
at Descon Engineering (Pvt) Ltd
Location :
Pakistan - Lahore
• Erection & Commissioning Water / Fire Tube Boiler & Associated Piping
(Piping Fabrication & Erection. Boiler Erection)
• Fauji Cement Factory 72TPD Plant
(Raw Mill erection, Pre Heater Structure, Cement mill Structure and Piping)
• Key Responsibilities
• Preparation OF BOQ of all Piping isometric drawings for procurement department
• To check and review piping material specification (line classes), vendor quotation evaluations and verifications of vendor documents and piping material for compliance to project standards or specifications, applicable codes, contract requirements, quality standards and accepted engineering and construction practices.
• Planning, scheduling and organizing daily piping fit-up work.
• Preparation of BOM for issuance of required material from store.
• Monitor and supervise fabrication of piping spools according to drawings.
• Daily progress reports.
• Supervise and monitor hydro test according to required procedure
• Preparation of as build drawings with draftsman.
• Closely monitor the Piping installation to ensure that all the requirements stated on the drawing (e. g.) slope etc.) has been followed.
• Resolve technical problems encountered on site and take immediate action in any cases, which needs technical solutions.
• Conduct line checking for punch listing and punch clearing.
• Coordinate with the QC for the final documentation and RFI preparation.
(Piping Fabrication & Erection. Boiler Erection)
• Fauji Cement Factory 72TPD Plant
(Raw Mill erection, Pre Heater Structure, Cement mill Structure and Piping)
• Key Responsibilities
• Preparation OF BOQ of all Piping isometric drawings for procurement department
• To check and review piping material specification (line classes), vendor quotation evaluations and verifications of vendor documents and piping material for compliance to project standards or specifications, applicable codes, contract requirements, quality standards and accepted engineering and construction practices.
• Planning, scheduling and organizing daily piping fit-up work.
• Preparation of BOM for issuance of required material from store.
• Monitor and supervise fabrication of piping spools according to drawings.
• Daily progress reports.
• Supervise and monitor hydro test according to required procedure
• Preparation of as build drawings with draftsman.
• Closely monitor the Piping installation to ensure that all the requirements stated on the drawing (e. g.) slope etc.) has been followed.
• Resolve technical problems encountered on site and take immediate action in any cases, which needs technical solutions.
• Conduct line checking for punch listing and punch clearing.
• Coordinate with the QC for the final documentation and RFI preparation.