Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Zohaib Khan, Mechanical Engineer

Zohaib Khan

Mechanical Engineer·Fichtner Consulting & Engineering,

Saudi Arabia

Bachelor's degree, (Mechanical)

Work experience

Total years of experience: 11 years, 6 months

Mechanical Engineer

January 2024 - Present

Fichtner Consulting & Engineering,

Tabouk, Saudi Arabia

January 2024 - Present

• Direct daily inspections for HVAC and firefighting systems for the 1.7 Billion US Dollar AMAALA PPP project, maintaining
100% compliance with NFPA and ASHRAE standards.. Maintain detailed Inspection Requests (IRs) and mechanical
inspection records.
• Validated 50+ mechanical shop drawings, P&IDs, and material submittals, method statements, calibration certificates,
and manufacturer documentation. Reducing technical revision cycles by 15%.
• Monitor and controlled project quality by reviewing Project Quality Documents (PQDs), Inspection & Test Plans (ITPs),
equipment tagging/labeling records, and mechanical inspection checklists to verify end-to-end QA/QC compliance.
• Participate in Testing & Commissioning (T&C) activities, including pressure testing, leakage tests, flushing, mechanical
cleaning, TAB (Testing, Adjusting & Balancing), FAT, and SAT, ensuring mechanical system performance met design
criteria and operational standards.
• Supervise installation works for pumps, HVAC equipment, mechanical rooms, piping systems, and fire-protection
systems, verifying mechanical room clearances, access compliance, and overall installation quality.
• Validate O&M manuals, test scripts, commissioning documents, training records, and equipment calibration reports,
ensuring Pre-Commissioning and Commissioning turnover packages met operational and contractual requirements.
• Mitigated project risks by identifying and documenting 20+ Non-Conformity Reports (NCRs) and implementing data
driven corrective actions.
• Oversee contractor performance to ensure adherence to project scope, schedule, budget, international mechanical
codes, and QA/QC standards, promoting consistent compliance throughout execution.
• Support training and development of junior engineers, technicians, and subcontractors in mechanical troubleshooting,
inspection procedures, documentation requirements, and T&C workflows during regular technical coordination meetings.

Company industry:
Business Consultancy Services

Lead MEP Engineer

January 2023 - January 2024

BBIAGCJV Six Flags Qiddiya,

Riyadh, Saudi Arabia

January 2023 - January 2024

• Managed end-to-end execution of HVAC, Firefighting, and Plumbing works for a $1.6B EPC project portfolio, overseeing
all phases from engineering to final handover.
• Evaluated and approved 80+ shop drawings, material submittals, and vendor datasheets, ensuring 100% adherence to
NFPA and ASHRAE standards.
• Collaborated with 6 multidisciplinary teams (Civil, Electrical, HSE, etc.) to resolve over 40 technical interfaces/clashes,
reducing site rework by 15%.
• Directed 3 major subcontractors and a site workforce of 50+ personnel, maintaining a zero-accident safety record and
strict QA/QC compliance.
• Supervised the installation of 30+ AHUs/FCUs and complex VRF/VRV systems, validating 100% of support alignments
and insulation finishing for high-efficiency performance.
• Executed HVAC testing and commissioning (T&C) for systems totaling 1, 200+ Tons of Refrigeration (TR), including
successful TAB and duct leakage checks.
• Spearheaded the installation and layout of 1 dedicated fire pump rooms, ensuring 100% system integrity and compliance
with Civil Defense regulations.
• Certified firefighting system performance through 60+ successful hydrostatic tests and full system functional/alarm
integration checks.
• Oversee plumbing and drainage systems for 11 buildings, witnessing disinfection and pressure tests to ensure a defect
free handover to the client.

Company industry:
Construction & Building

Mechanical Engineer

January 2022 - January 2023

Power China - Spine water project, NEOM

Tabouk, Saudi Arabia

January 2022 - January 2023

• Directed the execution of 80km+ HDPE pipeline networks and MEP services, ensuring 100% adherence to project
specifications and aggressive EPC timelines.
• Supervised the installation of ARV (Air Release Valves), Washout Valves, and high-capacity Booster Pump stations,
enhancing system pressure stability.
• Managed daily inspections of pipeline works, including trenching, pipe laying, and HDPE butt-fusion/electro-fusion
welding, achieving a zero-leakage record during initial testing.
• Coordinated multi-stage hydrostatic and pneumatic testing for pipelines and HVAC systems, ensuring 100% system
integrity and performance prior to handover.
• Led the installation of high-scale HVAC systems, including Chilled Water (CHW) networks, AHUs, and ducting, while
managing a workforce of 40+ technicians and subcontractors.
• Oversaw Firefighting and Plumbing works, ensuring the installation of NFPA-compliant sprinkler systems, fire pumps,
and domestic water/drainage networks.
• Facilitated cross-functional collaboration between civil and mechanical trades to resolve 30+ installation clashes,
streamlining site handovers and reducing rework by 10%.
• Managed pre-commissioning and commissioning phases, including chemical cleaning of chilled water pipes and Final
Functional Performance Testing (FPT) for all MEP equipment.
• Optimized construction workflows by reviewing shop drawings and identifying 15+ technical issues before they impacted
the project schedule.
• Maintained critical technical documentation, including Inspection Test Plans (ITP), Daily Progress Reports (DPR), and
comprehensive commissioning protocols for final client handover.
• Ensured 100% compliance with international standards (ASTM, ISO, NFPA, ASHRAE) and project-specific QA/QC plans
for high-tier utility projects.

Company industry:
Construction & Building

Mechanical Engineer

January 2019 - January 2021

Hansa Electromechanical – Zayed international airport

Abu Dhabi, United Arab Emirates

January 2019 - January 2021

• Directed the end-to-end execution of complex electromechanical (MEP) installations for Airport developments, ensuring
100% adherence to International Building Codes (IBC), safety protocols, and project specifications.
• Conducted rigorous daily site inspections and Quality Control (QC) audits to verify that all mechanical installations—
including HVAC ducting, chilled water piping, and firefighting networks—aligned with approved IFC (Issue for
Construction) drawings.
• Facilitated technical coordination between subcontractors, consultants, and stakeholders through weekly progress
meetings, successfully resolving over 20+ technical clashes and design discrepancies to keep the project on schedule.
• Managed the lifecycle of Material Inspection Requests (MIRs) and Work Inspection Requests (WIRs), ensuring all
mechanical equipment and materials met project quality benchmarks and received timely consultant approval.
• Optimized project workflows by identifying site bottlenecks and implementing Root Cause Analysis (RCA) for installation
delays, reducing equipment downtime and improving labor productivity by 12%.
• Validated the installation of MEP assets including pumps, air handling units (AHUs), and fire-suppression systems,
ensuring strict compliance with NFPA and ASHRAE standards.

Company industry:
Construction & Building

Mechanical Engineer

January 2014 - December 2018

Tuff Poly Films

Karachi, Pakistan

January 2014 - December 2018

• Implemented reliability-centered maintenance (RCM) practices, reducing unscheduled downtimes.
• Assessed and upgraded outdated machinery to enhance production efficiency by 18%.
• Maintained calibration schedules for critical equipment, ensuring compliance with quality standards.
• Developed emergency repair protocols, reducing response time to equipment failures.
• Conducted root cause analysis (RCA) for recurring faults, implementing long-term solutions.
• Collaborated with vendors for procurement and installation of high-performance equipment.
• Assisted in facility expansion projects, including installation of new machinery and utility systems.
• Ensured compliance with safety standards during all maintenance activities, avoiding workplace incidents.

Company industry:
Industrial Production

Education

Preston University

September 2017

September 2017

Bachelor's degree, (Mechanical)

Pakistan

Govt. College of Technology

March 2009

March 2009

Diploma, (Mechanical)

Pakistan

Skills

Construction & Property
Expert
Construction & Property
Expert
Quality Management
Expert
Quality Management
Expert
Plant Maintenance
Expert
Plant Maintenance
Expert
MEP
Expert
MEP
Expert
INSTALLATION
Expert
INSTALLATION
Expert
PUMPS
Expert
PUMPS
Expert
TROUBLESHOOTING (PROBLEM SOLVING)
Expert
TROUBLESHOOTING (PROBLEM SOLVING)
Expert
REPAIRING (MANUAL/MECHANICAL)
Expert
REPAIRING (MANUAL/MECHANICAL)
Expert
ELECTRICAL WIRING
Expert
ELECTRICAL WIRING
Expert
DATA ANALYSIS
Expert
DATA ANALYSIS
Expert
HVAC
Expert
HVAC
Expert
LEAK DETECTION
Expert
LEAK DETECTION
Expert
MECHANICAL ENGINEERING
Expert
MECHANICAL ENGINEERING
Expert
QUALITY CONTROL
Expert
QUALITY CONTROL
Expert
COMMISSIONING
Intermediate
COMMISSIONING
Intermediate
BUILDING INSPECTIONS
Intermediate
BUILDING INSPECTIONS
Intermediate
FIREFIGHTING
Intermediate
FIREFIGHTING
Intermediate
MECHANICAL ELECTRICAL AND PLUMBING MEP SYSTEMS
Intermediate
MECHANICAL ELECTRICAL AND PLUMBING MEP SYSTEMS
Intermediate
NFPA NATIONAL FIRE PROTECTION ASSOCIATION CODES
Intermediate
NFPA NATIONAL FIRE PROTECTION ASSOCIATION CODES
Intermediate
PRODUCT QUALITY QA QC
Intermediate
PRODUCT QUALITY QA QC
Intermediate
ROOT CAUSE ANALYSIS
Intermediate
ROOT CAUSE ANALYSIS
Intermediate
THIRD PARTY LOGISTICS
Intermediate
THIRD PARTY LOGISTICS
Intermediate

Languages

Urdu

Expert

Arabic

Expert

English

Expert

Training and Certifications

Certifications
PMI-PMP
MUSTADAM AP
ISO 9001 QMS
ISO 14001 EMS
QMS

Hobbies and interests

Water and Power Development Authority
DESCON Engineering
Lucky Cement Factory Pakistan
Cricket

i have been awarded as a best player of the year in our district