زبير Razaq, Electrical Engineer

زبير Razaq

Electrical Engineer

DESCON Engineering Limited

البلد
باكستان
التعليم
بكالوريوس, Electrical Engineering
الخبرات
16 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 6 أشهر

Electrical Engineer في DESCON Engineering Limited
  • باكستان - لاهور
  • أشغل هذه الوظيفة منذ نوفمبر 2009

Done two Projects:

(a) FCCL, Taxila
Duration: November 2009 to May 2011

Responsibilities:
(1) Act as Area Incharge of Kiln Substation, Kiln, Kiln Feed, Preheater, Raw Mill EP, Gas Conditioning Tower area.
(2) Routing, Laying and termination of HV, LV & Communication & control cables.
(3) Alignment and Coupling of MV, MCC, ACC and Frequency Drive Panels.
(4) Installation and Testing of Distribution & Converter Transformers.
(5) Earthing and Lightening of whole area.
(6) Installation of Lighting fixtures, Sockets, Lighting DBs.
(7) Instrumentation and Commissioning of whole area.
(8) Working on Gas Analyzers of Kiln Inlet, Kiln Outlet and Preheater Exit.

(b) SATPARA Dam & Power Houses (17MW), Skardu
Duration: May 2011 to May 2013

(1) Acting as Incharge Electrical.
(2) Installation, Testing & Commissioning of Overhead 11kv Transmission Line from Main Dam to PH-01.
(3) Installation, Testing & Commissioning of 100KVA Transformer at Main Dam & Valve Chamber.
(4) Installation, Testing & Commissioning of Overhead Crane (15Ton) used for lowering of stop logs.
(5) Installation, Testing & Commissioning of Slide Gate in Surge Chamber & 04 Nos. of Radial Gates at Spillway & 01 No. of Radial Gate at Stilling Basin.
(6) Designing & Furnishing of Earthing System of Power House 01, 02, 03 & 04.
(7) Mapping & Laying of Underground Power & Control cables.
(8) Internal Electrification of Power Houses, Surge Chamber, Valve Chamber & Instrument Houses.
(9) Planning of whole Electrical related activities using Primavera 3.0.
(10) Making of As-Built Drawing of executed activities.
(11) Dealing with Contractual Matters of Electrical related activities.
(12) Preparation of Measurement Sheets in Monthly Statements.
(13)Worked on Monthly Statements related to Electrical & discuss it with Consultant (IPC).
(14) Managing the Inspection Requests of executed activities.
(15) Managing of Electrical related materials.
(16) Dealing with Sub-Contractors.

(c) Ranolia Hydro Power Project, Bisham
Duration: May 2013 to Present

(1) Working as an Incharge Electrical at both Power House building & Employer’s Facilities areas.
(2) Designing and Furnishing of Earthing System of Power House.
(3) Mapping and Laying of Underground Power and Control cables.
(4) Internal Electrification of Power Houses and Employer’s Facilities building.
(5) Planning of whole Electrical related activities using Primavera (Version 3.0).
(6) Dealing with contractual matters of electrical related activities.
(7) Preparation of site measurements for Monthly Statements.
(8) Preparation of Daily, Weekly and Monthly Progress reports.
(9) Managing the Inspection Requests of executed activities.
(10) Checking the compliance of electrical materials delivered to the site.
(11) Dealing with Sub-Contractors, checking their work progress in line with project’s approved work schedule and quality standards.

Engineer (E&I) في M. Abdullah Azeem Engineering Services
  • باكستان
  • سبتمبر 2008 إلى أكتوبر 2009

(1) Worked with MAES which is sub contractor of DESCON Engineering Limited.
(2) Making & Discussing the Monthly Invoices with Client.
(3) Installation, Testing & Commissioning of overhead transmission line.
(4) Installation and Testing of Distribution & Converter Transformers.

Electronics Engineer في Advanced Systems Pvt. Ltd., Gujranwala
  • باكستان
  • مارس 2008 إلى أغسطس 2008

(1) Worked in Research & Development Department on SSD-99000 Bulk Encryption Unit.
(2) Done the documentation of SSD-99000 as per instructions given by Pakistan Army.
(3) Preparation & Delivering of Presentation for Pakistan Army Personals.

Internee Engineer (Electrical) في Naubahar Bottling Company(Pepsi Cola), Gujranwal
  • باكستان
  • يوليو 2006 إلى سبتمبر 2006

(1) Installation of latest PET Plant by SIG Simmunazi.
(2) Managing the material.
(3) Working with Italian Engineers.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في University of Central Punjab, Lahore
  • أبريل 2008

Specialties & Skills

Electrical Engineering
Costing
Project Documentation
Electrical Testing
Primavera P6
Primavera Project Planner (P3)
AutoCAD 2004/07
MS Excel
Primavera Project Planner (P6)

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Registered Engineer
  • April 2008

التدريب و الشهادات

Project Planning & Schedulling (تدريب)
معهد التدريب:
Computer College, Pakistan Engineering Congress

الهوايات

  • Movie Watching