HVAC Engineer
Arabi Enertech KSC
Total des années d'expérience :13 years, 10 Mois
Experienced in worked in oil and gas projects comprising installation of Central Plant chiller system, Package unit and Split Air Conditioning unit, Minisplit units, VRF, VRV, DX also comprising Planning, Scheduling, Co-ordinating with main clients, contractors, sub-contractors, interacting with consultants, Heat Load Estimation (HAP Carrier), Equipment selection, Duct Design & Sizing (ASHRAE, BS, SMACNA, DW 144/142/141/171 etc.), CHW Pipe Design & Sizing (BS, ASHRAE, ASME, NFPA, ANSI), ESP Calculation, Pump Heat Calculation, Workshop Drawing & Material Submittal preparation, Materials & Fitting take off and Execution of installation, Testing & Commissioning of Air Handling unit with Recovery wheel, Fan Coil Units, Ventilation fan, Air washers, Air Curtains, Fan Coil unit (FCU), Blowers, CHW Pumps, MS Control and Control Valves, Inert Gas IG-100/IG-55 Fire Suppression works with HVAC Interconnection and Fire Control Systems, Eye Wash and Safety Washers etc.
Installation of HVAC System using with international quality standards ASHRAE, SMACNA, ASME, NFPA, ANSI and SAES etc.
Installation & maintenance of large HVAC, AHU, FCU and Chillers room.
Installation & maintenance of VRF, VRV and DX Systems high rise building, hospitals, hotels, malls, offices, metro Projects and Villas etc.
Installation & maintenance of large Commercial & Industrials multi storey buildings, towers, Villas, Palace and Airports.
Execution of Chilled Water Piping’s Connections.
Installation of Fire fighting lines.
Piping Installations (MS, CS, GI, PVC AND CPC) etc.
To Calculate Heat Load for the Project.
To make the Technical Data Sheet as per requirement.
To Calculate Static Pressure and Pump Head Calculations.
To make Ducting and Piping Layouts.
Selection of Grills, Diffusers and other Equipments.
Selection of Chillers, AHU’s, FCU’s, blowers & exhaust fan.
Installation of HVAC System using with international quality standards ASHRAE and SMACNA.
Installation & Maintenance of large HVAC, AHU, FCU and Chillers room. Installation Maintenance of VRF, VRV and DX Systems high rise building, hospitals and offices etc.
Testing and Commissioning of HVAC Systems.
Piping Installation and Maintenance (MS, CS, GI, PVC AND CPC) etc.
To Calculate Heat Load for the Project.
To make the Technical Data Sheet as per requirement.
To Calculate Static Pressure and Pump Head Calculations.
To make Ducting and Piping Layouts.
Selection of Grills, Diffusers and other Equipments.
Selection of Chillers, AHU’s, FCU’s, blowers & exhaust fan.
Experienced in worked in oil and gas projects comprising installation of Central Plant chiller system, Package unit and Split Air Conditioning unit, Minisplit units, VRF, VRV, DX also comprising Planning, Scheduling, Co-ordinating with main clients, contractors, sub-contractors, interacting with consultants, Heat Load Estimation (HAP Carrier), Equipment selection, Duct Design & Sizing (ASHRAE, BS, SMACNA, DW 144/142/141/171 etc.), CHW Pipe Design & Sizing (BS, ASHRAE, ASME, NFPA, ANSI), ESP Calculation, Pump Heat Calculation, Workshop Drawing & Material Submittal preparation, Materials & Fitting take off and Execution of installation, Testing & Commissioning of Air Handling unit with Recovery wheel, Fan Coil Units, Ventilation fan, Air washers, Air Curtains, Fan Coil unit (FCU), Blowers, CHW Pumps, MS Control and Control Valves etc.
Installation of HVAC System using with international quality standards ASHRAE, SMACNA, ASME, NFPA, ANSI and SAES etc.
Installation & maintenance of large HVAC, AHU, FCU and Chillers room.
Installation & maintenance of VRF, VRV and DX Systems high rise building, hospitals, hotels, malls, offices, metro Projects and Villas etc.
Installation & maintenance of large Commercial & Industrials multi storey buildings, towers, Villas, Palace and Airports.
Execution of Chilled Water Piping’s Connections.
Installation of Fire fighting lines.
Piping Installations (MS, CS, GI, PVC AND CPC) etc.
To Calculate Heat Load for the Project.
To make the Technical Data Sheet as per requirement.
To Calculate Static Pressure and Pump Head Calculations.
To make Ducting and Piping Layouts.
Selection of Grills, Diffusers and other Equipments.
Selection of Chillers, AHU’s, FCU’s, blowers & exhaust fan.
Mechanical Engineering.