Quality Control Engineer
Alhayat carpet factory
Total years of experience :2 years, 8 Months
1-Follow up the Quality control for final production line.
2-Analyze and report on quality data.
3-Collaborate with production teams to address quality-related issues.
4-Identifying trends and opportunities for production enhancement.
5-Monitoring and performing monthly Reports about Quality issues to the Heads.
6-Inspect mending carpets.
7-Familiar with carpet defects and design mistakes.
8-makining standards for new qualities and giving materials details.
9-daily weighting carpet to controll product.
10-making decision for first class carpet.
11-Inspect packaging
12-control length measurements for both wall to wall and rugs.
● VAN DE WIELE VELVET LOOMS,
1-Setting for pile hight.
2-Change gerbox belt for pic scissor.
3-Gripper replacement
4-Griper timing.
5-Change jacquard's operating arm.
● DORNIER CARPET 3.40 m LOOMS, STÄUBLI AND BOONS JACQUARDS,
1-Support installing of machines by analyzing drawings (production line) of new expansions of the factory.
2-support handling the failures of all machines.
3-Gripper timing.
4-Change loom's external parts once damaged.
5- Minimizing, maximizing machine width.
6-Selctors settings for wefts between 3 to 12 weft
7-Metal rolls changing.
8-Computer settings and messages.
9-clutch, disk change.
● DORNIER B2 LATEST GENERATION'S CARPET MACHINE,
1-Installing rapiers and make timing for weaving.
2-Insert plains and designs into computer.
3-Errors and alers messages.
● STÄUBLI JACQUARD
1-module Overhauling.
2-Drawing Testing patterns.
3-Install new harness camper box.
4-Replace operating arm.
5-Jacquard balancing.
6-Oiling period.
7-Harnesses tension and drilling.
8-locate damaged hooks.
● BONAS LATEST GENERATION JACQUARD
1-Changing damaged casets.
2-Repair damaged casets ready as a spare parts.
3-Replace damaged solenoids.
4-locate damaged hookes.
5-Jacquard balancing.
6-Oiling period.
●PRODUCTION
1-Work to improvise product quality and resolve quality problems.
2-Concentration in Product Realization.
3-Gain more supervise skills.
4-Review machine's breakdown times for both maintenance and production process.
● PICANOL & DORNIER LOOMS
1-Insert plains and data into machine computer.
2-little operating adjustments makining machine efficiency higher like reducing both warp and weft cutting, setting for weft colors.
3-Install beams, shafts, reeds, temples, rippers, head of rippers, other parts.
4-Gripper timing.
5-Minimize, maximize machine width.
URL removed due to policy violation. Please contact support for further information.