technical-design manager
PARKWAY international
Total years of experience :17 years, 6 Months
Technical Director / Design and Assistant Project Manager,
Al Marya Plaza Tower
as the work is intense and under great pressure according to the high‑level requirements of the project:
Tower B3+SGL+LL2+LL1+VGL+L!+23 typical floors+L24+L25 pool+aminity floors+2 Penthouses
client Far‑Glory and the consultant KEO International
https://drive.google.com/file/d/1dDQzOTJp51fazO-TSVKNHmVjElac5ATw/view?usp=drives
A to Z system
Chief Architect, projects manager, architecture and finishes supervisor.
Provides leadership in the development and delivery of design services.
Develops expectations for content and quality of design at various stages of the project.
Ensures timely completion of the design project.
Incorporates client needs with effective design techniques, problem-solving, and creativity to ensure satisfactory outcomes.
Participates in project decisions regarding technical approaches, cost, scheduling, and performance.
Coordinates and supervises internal and external resources.
Plans and reviews compensation actions and enforces policies and procedures.
Accomplishes human resource objectives by training, coaching, counseling, and disciplining employees.
Review product designs for feasibility, technical capabilities.
Work with various Engineers, Designers, Draftsmen, and Technicians to maintain program schedules and budgets as required.
Assist in the day‑to‑day operations of the Engineering Department including administrative functions, not excluding reviews and project budgets.
The Burlington Building in Business Bay. Total built area 104, 000 m2. Project completed The 51 Building in Business Bay, total built area 60, 000 m2. Project Completed, Working on the Opus project Lead Architect: Zaha Hadid Architects. Total built area 180, 000 m2. Project completed
100 floors residential building on Sheikh Zayed Road. Lead Architects: SOM. The project was put on hold
Clients meetings and requirements
Schematic design and working drawings stages.
Coordination with all other disciplines (structure, MEP, specs, and Regulations).
Selected Projects:
Marina towers the project about 900 million DH. More than 2500 cars parking
Al Reem tower G+m+25 stories about 160 million DH.
2 towers in shams Abu Dhabi about 300 million.
900 villa village proposal.
Many other projects and competitions
(HCT, IAT& Services building) / UAE emirates‑Ministry of defense
Building for the department of honoring and hospitality/Abu Dhabi
High colleges of technology women’s colleges /Abu Dhabi
Proposed workers city ‑13300 persons /Abu Dhabi.
Education area / Medina Zayed ‑ Abu Dhabi
2 of UAE Embassies / Morocco and China
Proposed of ID project‑13buildings / UAE Emirates
3 Proposed Mosque Alain and Abu Dhabi
8 commercial buildings / Abu Dhabi
2 Palaces projects / Abu Dhabi
22 Villas projects /Abu Dhabi and Alain
8 Commercial villas /Abu Dhabi
Schematic design and working drawings stages.
Coordination with all other disciplines (structure, MEP, specs, and Regulations).
Selected Projects:
Al‑Badi health club in Al Ain.
Sh.Ahmed tower in Abu Dhabi.
Sheikh KHALIFAS palace, 2 proposals.
Al‑Dhahiri tower.
Four summer centers.
UAE flag pole in Abu Dhabi.
Gamco hangar in Abu Dhabi.
Al‑Rabee School & American School.
The factory in Al Yemen.
Islamic bank 35F in Abu Dhabi.
Banks institutes 4F Building in Sharjah.
Mahmud Khalid villa, Mahmud Khalid shelled, Abu Abdullah 4 villas, Abu Saed Buildings 6+2F, Al‑Badi villa in AlAin, Al‑Hamily 2 villas, Sh.Ahmed Tower in Abu Dhabi, Sh‑ Aisha 2 villas, Al‑Shamsi 2 villas, Ismaeel Al Marzuki villa, Ateeq villa, Jabir building, Marwan villa, Nazar villa, Petrol Station, Saud‑Haifa villa, 20 villas complex, Sultan Albadi villa in Alain, Isaa Al Faheem villa, Ameara villa, Bin Garran villa & Bin Hammud villa& Fatima 4 Villas.
Villas, towers & public buildings as Omer Busit. (B+G+M+7fl)
Modern Dubai School. (B+G+1st)
Juma Saeed Villa (Complex). (B+G+1st)
Mountaser Saffarini Villa. (B+G+1st )
Tawheed Villas (Complex). (B+G+1st)
Salam Villas (complex). (B+G+1st)
Abu Dawood Mosque. (G+1st)
Proposed Comm. Building for Sheik Bin Rashid Al Maktoum (B+G+M+7th fl)
Omar Sosa Villa (complex) (G+1st)
Amin Muhammad Villa (Complex) (G+1st)
Abdu‑Alaziz Sultan Villa (Complex) (G+1st)
Villas, palaces, public buildings.
Dr Abdullah Al -Sheikh Villas (complex) (Riyadh -Saudi Arabia), design including site works, swimming pool system design & other Architectural details.
Sheikh Abdul Rahman Al‑Juraisy complex of villas, main palace ((Riyadh -Saudi Arabia), design including site works & other Architectural details.
Eng. Ahmed Al‑Namla complex villa (Riyadh -Saudi Arabia), as a designer on it and working drawing.
the Fanateer tourisms villa (Jabeel‑ Saudi Arabia), design and redevelopment stage, requirement, design including site services works.
Sheikh Abdul Aziz Al‑Umran 5 villas complex (Riyadh -Saudi Arabia), design including site services works, as a designer on it.
Interior design (Organic Islamic patterns and Muqarnas Works for MINBAR Saladin / Palestine
Eng.Minwer Al‑Meheid villa / Landscape design & supervision
Analyzing Islamic ornaments and geometry, and creating the composition.
Maqam of Jaafar Al‑Tayyar / include wood, marble, gypsum, lighting works for
Minber, cupboards, windows, domes, and carpet design (Karak‑Jordan).
Organic Islamic ornaments and Muqarnas works for Saladdin Minbar (Quds).
Eng.minwer Al‑Meheib Villa (Amman‑Jordan).
Architectural design &working drawing work for the college of Islamic studies - Balqaa University (Salt - Jordan).
Interior design.
Project manager for Landscape, interior, and finishing work for Mr.Mohammed Nazzal Al‑Armouty family palaces (Amman‑Jordan) Design including fit‑out and site supervision.
Mr.Mohammad Al‑Talhouny villa (Amman‑Jordan) design including site works.
Mr. Nasser Judah villa (Amman‑Jordan).