Witness and supervisor the Slim Hole Project
Operation
Total years of experience :15 years, 8 Months
11) Witness and supervisor the Slim Hole Project (Rig less Operation) which included: • Record the CBL-VDL log through 5.5'' CSG after drilling rig moved.
• Perforate Using CSG gun through 5.5'' CSG.
• Collect fresh water, KCL and tanks for frac.job.
• Conduct frac .job (mini and main) through 5.5'' CSG using isolation tool
• Which fixed on 7 1/16'' Big Bore Valve.
• Lift and test the well using C.T, N2 and testing unit to
Evaluate the well performance after frac.job.
000000000000000000000000000000000000000000
witness on rig and rigless job
• From (2009-Till now):
• Field production operation engineer
I am working for KHALDA Petroleum Company in district engineering Sector KHALDA is a joint company with apache working in western desert in Egypt, during that period; I was held first petroleum engineer position.
KHALDA has many gas and oil fields. The most of oil wells are producing by ESP and SRP Technique the details of my work experiences during that period are as follows:
1) Performing and/or witnessing the following jobs:
• Drill stems test (DST), hydraulic fracturing, proppant clean-out and gravel pack
• Chemical jobs (matrix stimulation, tubing cleaning, corrosion & scale inhibition)
• Perforation jobs (TCP, through tubing perforation)
• Well logging (PLT, RST, TDT, USIT, GR-CCL)
• Wire line work (rig less recompilation, tubing gauging)
• CTU work (sand and scale cleaning, stimulation, lifting with N2)
• ESP water back wash, diesel back wash and acid back wash
2) Analyzing the following well logs qualitatively:
• Open hole logs (resistively, LDL, CNL) to develop completion and/or Recompilations recommendations.
• Cased hole logs (PLT, TDT, USIT, CBL) to develop stimulation, water shut- off,
Perforation/ Perforation, and work over recommendations as required.
3) Following up the total oil and gas production of many of western desert Oil and gas fields to develop a corrective action as required.
4) Following-up the performance of oil, gas, and water injection wells of many of western desert fields To develop remedial actions for any problematic well as required. Most of oil wells are producing by ESP technique.
5) Analyzing the following well tests for producing and water injection wells: repeat formation tester (RFT), static survey (SS) and echo meter survey
6) Recommending and/or preparing stimulation, well-bore cleaning, scale inhibition, water shut-off, and Work over, well test, CTU and wire line work, cased hole logging, and perforation programs.
7) Using the computer software (Microsoft word, Excel, and PowerPoint) to build up different database.
8) Planning, following-up, and supervising well testing, walkovers, stimulation and well-bore cleaning, Unloading wells using CTU and N2, and CTU and wire line WORK.
9) Conducting in-depth engineering studies about a specific issue such as: • Design and/or modification of oil wells' flow lines and trunk lines. Also, design and/or extension of manifolds for oil and water injection wells according to the development plan.
Summer Training: -Zitco Petroleum Company 29/08/2007- 04/09/2007
-Petropel Petroleum Company 29/07/2007 - 6/08/2007
• Cairo University • Faculty of Engineering B.Sc. of petroleum engineering: • Major: Petroleum Department, • Date & grade of Graduation: July 2008, Very Good with honor degree, • Project grade: Excellent.