Total Years of Experience: 9 Years, 0 Months
June 2015
To Present
Ingenieur Observer 2D
at Entreprise national de géophysique (E.NA.GEO)
Location :
Algeria
Ingenieur Observer 2D, à l’entreprise national de géophysique (E.NA.GEO) de Hassi-Messoud, je travaille sur le sismique pour, contrôler et gérer le laboratoire d’acquisition, gestion et organisation des équipes (Pose, Ramasse, Assistants...).
Les observers sont des ingénieurs en informatique travail dans un labo d acquisitions sismique nommé SERCEL 428 (Version 3, 4, 5)(sismique de réflexion) et LABO nome GEOODE 3000
Les observers sont des ingénieurs en informatique travail dans un labo d acquisitions sismique nommé SERCEL 428 (Version 3, 4, 5)(sismique de réflexion) et LABO nome GEOODE 3000
April 2014
To June 2014
Global gas treatment Facility Shut down & maintenance preparation,Technical of the Major Inspection
at GE oil & gas algesco
Location :
Algeria
Electrical Instrumentation
GE Oil & Gas (EGPS)
Instrumentation Technical
GE oil & gas algesco
april 2014 - Present (3 months)
Global gas treatment Facility Shut down & maintenance preparation, Technical of the Major Inspection of MJB Turbine MS-5002B .
- Technical of Instrumentation works during the Major Inspection of the Turbine John Brown MS-5002B :
- Technical, assistance all Algesco works.
- Calibration of Thermostats, Pressure Transmitters, Gas detectors, GCV.
- Simulation of SRV, IGV, Nozzles, mechanical over speed (with frequency generator) from MKV...
- Functional test of CO2 Dampers, Bleed valves, seismic probes, Igniters, flame & heat detectors, thermocouples & filling oil accumulators with Nitrogen.
- Gaps adjustments for all Bently Nevada probes.
- Assist the modifications done by GE Algesco.
- Successful Crank & Start up.
GE Oil & Gas (EGPS)
Instrumentation Technical
GE oil & gas algesco
april 2014 - Present (3 months)
Global gas treatment Facility Shut down & maintenance preparation, Technical of the Major Inspection of MJB Turbine MS-5002B .
- Technical of Instrumentation works during the Major Inspection of the Turbine John Brown MS-5002B :
- Technical, assistance all Algesco works.
- Calibration of Thermostats, Pressure Transmitters, Gas detectors, GCV.
- Simulation of SRV, IGV, Nozzles, mechanical over speed (with frequency generator) from MKV...
- Functional test of CO2 Dampers, Bleed valves, seismic probes, Igniters, flame & heat detectors, thermocouples & filling oil accumulators with Nitrogen.
- Gaps adjustments for all Bently Nevada probes.
- Assist the modifications done by GE Algesco.
- Successful Crank & Start up.
Share on Facebook
Share on Twitter
Share Via Email