احمد عبد العزيز, Asst. PMO director

احمد عبد العزيز

Asst. PMO director

IDRAK fine finishings - DMG

البلد
مصر - القاهرة
التعليم
بكالوريوس, interior design and furniture
الخبرات
19 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 4 أشهر

Asst. PMO director في IDRAK fine finishings - DMG
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ أكتوبر 2011

Job description:
1. Work on establishing the organization business system processes.
2. Assistant to support the PMO Director and other members of the
work stream outputs on time, within budget and to scope.
3. Minute Project Boards, Ensure that actions are dealt with and updates on each action
circulated.
4. Monitoring and update of risk and issue registers, liaising with risk/issue owners as
appropriate.
5. Apply Background Investigation process, project training process, and status reports.
6. Support project managers on financials.
7. Follow up the project through the entire project life cycle in below milestones.
 developing plans and schedules.
 estimating resource and requirements
 defining milestones and deliverables
 monitoring activities
 evaluating and reporting on accomplishments to the PMO director.

construction manger في IDRAK fine finishings - DMG
  • مصر - القاهرة
  • يوليو 2011 إلى سبتمبر 2014

Job description:
1. Plan the delivery of the project at hand.
2. Manage the day‐to‐day working, utilization, implementation and technical consultants
engaged on client assignments. From ensuring the correct material turns up before a
job, to explaining the work ethics and activities to colleagues.
3. Report progress on projects by suitable media to sector management, maintain and
update project reporting, checkpoints and financial reporting to a high standard.
4. Plan and arrange visits to existing and new potential clients, ensuring every client
receives sufficient support to enhance their relationships.
5. Develop contacts with senior staff, directors, and other influential staff within each
account during the implementation phase.
6. Co‐ordinate required support levels and training.
7. Produce reports on each project at agreed intervals, and whenever substantive actions
are required

Project: CFC tunnel
Owner: Cairo festival city
Project Manager: CFC
Consultant: Alamar
Scope of work: 10, 000 M2of epoxy

Project: AstraZeneca
Owner: AstraZeneca pharmaceuticals
Project Manager: Raya smart building
Consultant: ASSAF group
Scope of work: 650 M2 civil and architecture
work.

Project: Regus5th Avenue
Owner: Regus international
Project Manager: Raya smart building
Consultant: AVA
Scope of work: 1200 M2 civil and architecture
work.

Project: Bayer 5th Avenue
Owner: Bayer international
Project Manager: Raya smart building
Consultant: AVA
Scope of work: 1600 M2 civil and architecture
work.

Project: VFS Tasheel, Souhag branch
Owner: VFS international
Project Manager: Vasco worldwide
Consultant: Pacer
Scope of work: 1500 M2 civil and architecture
work.

Project: VFS Tasheel, Alexandria branch
Owner: VFS international
Project Manager: Vasco worldwide
Consultant: Pacer
Scope of work: 2800 M2 civil and architecture
work.

Project: Porto Cairo Mall
Owner: Amer Group
Project Manager: Projacs
Consultant: Elgabaly Architects
Scope of work: 7500 M2 Roof floor civil and
architecture work.

Project: Raya Plaza
Owner: Raya
Project Manager: Raya Smart Buildings
Consultant: EHAF/ AVA
Scope of work: 47000M2 Interior civil and
architecture work/LEED.

Project: Polaris international industrial parks
Owner: Polaris International
Project Manager: PMP
Consultant: PAD
Scope of work: 2460M2 Building interior civil
and architecture work.

Project: Mountain View north coast
Owner: Mountain View, DMG
Project Manager: PMO
Consultant: Dr. Mamdouh Hamza office
Scope of work: 54 villas interior civil and
architecture work

zone manger في concrete plus / SODIC
  • مصر - القاهرة
  • يناير 2011 إلى يونيو 2011

1.Implementing various operations through proper coordination and control of planning, design, estimating, contracting and construction in the entire process.
2.Direct and supervise workers.
3.Evaluate construction methods and determine cost-effectiveness of plans
4.Determine labor requirements and dispatch workers to construction sites.
5.Inspect and review projects to monitor compliance with building

Project: Allegria
Owner: SODIC
Project Manger: Turner
Consultant: MZECH, Dr. Medhat Abou Zaids’ office

partner في Roaya
  • مصر - القاهرة
  • فبراير 2007 إلى أبريل 2011

1.Home and Office furniture.
2.Wall cladding and doors.


Project: Etisalat Masr, sever branches (embaba, Faisal, Hurghada, Tanta, Shobra, Zyton ETC..)
Owner: Etisalat Masr

Project: Club Mad, Taba
Owner: Club Mad


Project: Fairmont Heliopolis
Owner: Oraskom

Project: Fairmont Nile towers
Owner: Oraskom

Project: Artillery house
Owner: Armed Forces, Artillery

Project: IBM, Pyramids hights
Owner: IBM egypt

External Manufacturing Department Manger في Architouch - KANDIL industries
  • مصر - القاهرة
  • فبراير 2009 إلى ديسمبر 2010

1.Implementing the outsourcing production plan through proper coordination and control of lead-time and estimated cost.
2.Select and contract, vendors who complete specific pieces of the project
3.Direct and supervise vendors.
4.Evaluate manufacturing methods and determine cost-effectiveness of plans
5.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and technical problems


Project: Cairo airport TP3
Owner: Egyptian Airports
Project Manger: Egyptian Airports

Project: International City stars intercontinental, Shark El sheikh
Owner: City stars properties
Project Manger: City stars properties


Project: HD bank, Mohandseen
Owner: HD bank
Project Manger: Modern interiors

Project: Nile kempenski Cairo
Owner: Talaat Mostafa Holding
Project Manger: Talaat Mostafa

Project: El sweedy Cables factories
Owner: El sweedy
Project Manger: El sweedy

Project: Petronas petroleum services
Owner: Petronas



Project: Ford El Obour
Owner: Ford

site manger في Dimensione
  • مصر - القاهرة
  • مارس 2008 إلى يناير 2009

1.Direct and supervise workers.
2.Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and technical problems
3.Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.

Project: Ministry of health and population, conference room
Owner: Ministry of health and population
Project Manger: Wadi El neel

Project: Colas Rail's regional office
Owner: Colas Rail's

Project: Mrs. Yasmine Abd El- Aziz's villa
Owner: Mrs. Yasmine Abd El- Aziz

Project: Set Core petroleum services
Owner: Mr. Tamer Nassar

Production engineer في Mancy Art
  • مصر - القاهرة
  • فبراير 2006 إلى يناير 2007

•Carpentry and upholstery section Head.
•Kitchens Design office.

Production engineer في el sukkary furniture
  • مصر - القاهرة
  • يناير 2005 إلى يناير 2006

•Carpentry and machinery section head.
•Design office leader for both Cairo International Festival 2006 and Tourism and Shopping Festival 2006 booths.

الخلفية التعليمية

بكالوريوس, interior design and furniture
  • في helwan university
  • سبتمبر 2008

Specialties & Skills

Adobe Photoshop
Construction & Property
Project Support
Microsoft Excel
AutoCAD
photoshop
ms project
autocad
office applications
3d studio max

اللغات

الانجليزية
متمرّس

العضويات

raoya furniture
  • partner
  • May 2006