Kuwait Oil Company (KOC) Marine Project ( North & South Small Boat Harbours ) with total cost 140, 000, 000 KD
Work as a civil engineer to review
prepour and pour inspection for QUAY WALL Blocks
prepour and pour inspection for ACCROPODE II Blocks
post-pour inspection for Quay Wall Blocks & ACCROPODE II Blocks
checking curing procedures for ACCROPODE Blocks and QUAY WALL Blocks
monitoring of work permit and tool box talk
review for the daily and weekly progress reported submitted by the contractor
prepare the daily activity report
Project Fintas Co-Operative Society with total cost 2, 158, 480 KD, contained basement, ground floor, first floor and roof for the client Fintas Co-Operative Society, Project Manager Total Management Consultancy
Work as a project engineer to reviews the submittals, contract specification, work schedules and supervise the civil works, the finishing works as per as drawings also make a daily and monthly
construction report, check the payments, reviews the bill of quantity
Site engineer Apr 2011 - Present
• OHA Engineering Consultant Kuwait - Kuwait
Work as a site engineer to supervise the civil works, the finishing works as per as drawings also to make a daily and monthly construction report, check the payments, review the bill of quantity for
⇒ four residential buildings with a total cost of 2, 400, 000 KD for the client Kuwait Finance House ( Nakhel Real Estate) all of them contained basement, ground and 11th floor and roof floor
Site engineer Sep 2008 - Feb 2011
• Wasaya United Company Dubai - UAE
Work as site engineer in a company Wasaya United Building Contracting in Dubai, UAE in the company's projects
⇒ Yaqoub industrial factory for steel & Labor Accommodation with a total cost of 2, 150, 000 DH
⇒ a compound contains 25 residential villa ( G + 1) in merdef with a total cost of 75, 000, 000 DH
Site engineer Jun 2006 - Sep 2008
• Egypt Gas one of Petroleum sector companies
Cairo - Egypt
⇒ Work as site engineer in a projects pressure reduction station in Elmahalla al-Kubra & Elmansoura
⇒ Work as an distribution engineer to make the main and sub main line for the gas line consisting of steel pipes and polyethylene pipes feeding Talkha city
Site engineer Jun 2004 - May 2006
• Arab Contractors. Osman Ahmed Osman & Associates. Cairo - Egypt
Work at the Arab Contractors. North Delta Branch of the following projects
⇒ As a site engineer in
* a project for a sports stadium stands, in Mansoura University, with a capacity of 10000 spectators and the main stadium ground with a total cost of 15, 000, 000 LE
* central restaurant and visitors housing in Mansoura University, works included all the civil works and finishes the integrated project and the project is a building consisting of basement and four floors with a total cost of 35, 000, 000 LE
* student housing project of the University of Mansoura, a project is a tow residential building with area of 2500 square meters consisting of ground floor and five floors at a cost of 6, 000, 000 for the tow building
* Project to develop the city of Mansoura and the project is to develop the field and established the layers of the tooth, sand and asphalt layer to be converted to asphalt street and the work of planning for the field