Ahmed Ali, Architectural Project Manager

Ahmed Ali

Architectural Project Manager

Concept

Lieu
Egypte
Éducation
Baccalauréat, Architecture
Expérience
20 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 2 Mois

Architectural Project Manager à Concept
  • Egypte - Le Caire
  • Je travaille ici depuis juillet 2014

-Responsible to develop and maintain professional and meaningful Client relationship.

-Responsible to determine the functional and spatial requirements of the project in consultation with the prospect Clients and Concept Designers.

-Administers activities of studio members to ensure performance of the team.

-Monitors the progress and quality of work by the team to ensure proper execution with the required level of accuracy.

-Monitor work output of the teams in terms of Quality standards and timely delivery and takes adequate measures to rectify any sub-standard outputs.

-Represent the company and attend official meetings with various statutory authorities as when required.

-Attends to any direct instructions from GM - PCS regarding the development and progress of the production design drawings.

-Assists Senior Management in responding to RFP (Request for Proposal) of clients if need arises.

-Support subordinates to respond to RFIs from the Contractors at tender stage.

-Prepare workflow for the team and periodic performance review of subordinates regarding performance, productivity and compliance to the established company & industry standards.


-Guide others and apply Computer assisted design software and equipment to prepare project designs and plans.

-Examine material samples and other submittals with respect to standard specification before presenting to clients.

-Responsible to plan, coordinate and manage cost effective preparation and production of Architectural drawings throughout the various stages of Project Design life cycle and across the Studios.

-Prepare detailed list of deliverables for the project including no. of drawings and associated time and cost at Proposal stage.

Senior Architect à Projestar
  • Arabie Saoudite - Riyad
  • avril 2012 à mai 2014

-Responsible of all Architecture work of the Architectural department such as architecture design, interior design and urban design.

-Prepare workflow for the team and periodic performance review of subordinates regarding performance, productivity and compliance to the established company & industry standards.

-Guide others and apply Computer assisted design software and equipment to prepare project designs and plans.

-Examine material samples and other submittals with respect to standard specification before presenting to clients.

-Responsible to plan, coordinate and manage cost effective preparation and production of Architectural drawings throughout the various stages of Project Design life cycle and across the Studios.
Prepare detailed list of deliverables for the project including no. of drawings and associated time and cost at Proposal phase.

Senior Architect à Concept Architecture,
  • Egypte - Le Caire
  • novembre 2009 à mars 2012

• Responsible to develop and maintain professional and meaningful Clientele relationship
• Responsible to determine the functional and spatial requirements of the project in consultation with the prospect Clients and Concept Designers
• Administers activities of studio members to ensure performance of the team.
• Monitors the progress and quality of work by the team to ensure proper execution with the required level of accuracy.
• Monitor work output of the teams in terms of Quality standards and timely delivery and takes adequate measures to rectify any sub-standard outputs
• Represent the company and attend official meetings with various statutory authorities as when required
• Attends to any direct instructions from GM - PCS regarding the development and progress of the production design drawings.
• Assists Senior Management in responding to RFP (Request for Proposal) of clients if need arises
• Support subordinates to respond to RFIs from the Contractors at tender stage
• Prepare workflow for the team and periodic performance review of subordinates regarding performance, productivity and compliance to the established company & industry standards
• Guide others and apply Computer assisted design software and equipment to prepare project designs and plans
• Examine material samples and other submittals with respect to standard specification before presenting to clients
• Responsible to plan, coordinate and manage cost effective preparation and production of Architectural drawings throughout the various stages of Project Design life cycle and across the Studios
• Prepare detailed list of deliverables for the project including no. of drawings and associated time and cost at Proposal stage.

Projects Architect à La poire
  • Egypte - Le Caire
  • juin 2007 à septembre 2009

La Poire Co. is the owner of four names of touristic Restaurants & Coffee shops.
(La Poire, Beanos Café, Beanos Express & Café La Poire).
Our Mission in the Projects Department Starts from
The Phase of chose the choose the appropriate Place then
Coordinate with the designers and provide them with the
Required information needed for the store design even
Preparing tenders & oversee the Contractors work and time schedules.

Assistant Project Manager). à Travel Ways for Tourist Facilities).
  • Egypte - Hurghada
  • septembre 2005 à mai 2007

I was responsible for assisting the Project Manager in the planning, management direction, project completion, client satisfaction, and financial outcome of assigned construction projects. Also assisting Project Manager in coordinating all contractual requirements, design drawings, and project specifications.

-during this period i joined to finish Prima life resort in full, including the rooms, restaurants, health club and the main kitchen.
-Designing & Execution of roof café at same resort.

Site Engineer à CAIROTECH for trading & engineering
  • Egypte - Le Caire
  • novembre 2003 à juin 2005

- organizing and supervising role on construction projects, setting out and determining the location for above and underground infrastructural installations involved in construction operations

- apply designs and plans to mark out the site and can be involved in projects ranging from small scale to multi-million pound ventures. This may include civil, road, rail and other infrastructure projects.

- I was working as part of the site management team liaising with and working alongside architects, engineers, construction managers, supervisors, planners, surveyors and subcontractors. I was sharing responsibility for site security, health and safety, and the organization and supervision of material and human resources

Éducation

Baccalauréat, Architecture
  • à Shorouk Academy
  • mai 2003
Baccalauréat, Architectural Engineering And Urban Planning
  • à El Shorouk Academy
  • mai 2003

التصميم المعمارى و التخطيط العمرانى و تنفيذ جميع أنواع التشطيبات للمنشأت العامة و السياحية و الطبية

Specialties & Skills

Microsoft Excel
SketchUp
AutoCAD
Adobe Photoshop
Artlantis
interior design
Architectural Design
High level Finishes implementation
high level finishes implementation
urban planning
materials
negotiation
site supervision
ms project
landscape design
project planning
residential
microsoft powerpoint
planning
problem solving
AutoCAD
Architecture
Project Management
Management
SketchUp
Adobe Photoshop
Quantity Surveying
Microsoft Office
Joinery
Fit out
Interiors
Facility Management
Coordination
Interior Architecture
Engineering

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Anglais
Moyen
Arabe
Langue Maternelle