Amr El-Menyawi, MEP Manager

Amr El-Menyawi

MEP Manager

Turner International

Location
Qatar - Doha
Education
Bachelor's degree, Bcs
Experience
29 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 3 Months

MEP Manager at Turner International
  • Qatar - Doha
  • My current job since July 2011

A) AT QATAR - DOHA July 2011 UP TO DATE
Job Title MEP Manager Turner International
• Carry Duties for MEP Manager for Phase-3
• Charge of a team of MEP engineers.
• Overall direction, technical support and control of the construction program with direct responsibility for review, coordination, monitoring construction schedules, drawings/documentation, evaluate tender package.
• Review the consultant reply on the RFI and the submittals.
• Evaluate manpower, skilled tradesman and equipment requirements.
• Handle the project through construction all the way to commissioning stage.
• Throughout this, must ensure documentation is prepared correctly.
• Review/approved the alternate proposed materials.
• Review/approved the MEP subcontractor prequalification.
B) AT UAE - DUBAI & Abu Dhabi March 2005 - UP TO June 2011

Resident Mechanical Engineer at Lahamyer
  • United Arab Emirates - Abu Dhabi
  • June 2009 to June 2011

Supervision on electrical substation

Senior Construction Manager at LAHMEYER International
  • United Arab Emirates
  • March 2009 to June 2011

1) March 2009 - up June 2011 LAHMEYER International.
Job Title Senior Construction Manager
Supervision for All Mechanical Work (Plumbing, Fire Fighting and HVAC Systems)
Project Description
33/11 KV substation
➢ 15 No. of substations
➢ Owner: Abu Dhabi water electricity Authority (ADWEA)
➢ Project value for MEP: 750, 000, 000 AED
➢ Project manager: LAHMEYER
➢ Arch. Consultant: LAHMEYER
➢ Civil Consultant: LAHMEYER
➢ Main contractor: Siemens / Butec
Duties
Supervisions at site and attending for all meetings

Assistance Project Manager at CANSULT MAUNSELL AECOM
  • United Arab Emirates - Dubai
  • August 2007 to March 2009

2) August 2007 - March 2009 CANSULT MAUNSELL AECOM.
Job Title Resident Mechanical Engineer "RME" (Assistance Project Manager)
In charge of the daily supervision of construction of the mechanical installations, for plumbing system, HVAC system and fire fighting system.
Project Description
Global Village Development
➢ 6 No. of international Pavilions
➢ Owner: GLOBAL VILLAGE
➢ Project value for MEP: 150, 000, 000 AED
➢ Project manager: PARSONS
➢ Arch. Consultant: CANSULT
➢ Civil Consultant: CANSULT
➢ Financial consultant: EC-HARIS
➢ Main contractor: Al Naboodah
➢ Civil contractor: AL-NIMR.
➢ MEP contractor: REMCO.
➢ Infrastructure contractor: Bin Ladin

Duties
• Redesign, review the shop drawing, and review material submittal, supervisions at site and attending for all meetings.
• Supervision for the underground pipes: sewage network, fire fighting network, domestic water network, Pre insulated chilled water network and irrigation network.
• Underground pump rooms: 4 No. filtration pump rooms for the lake, 1 No. irrigation pump room and 1 No. fire fighting pump room.
• Underground tanks: 1 No. for irrigation system 1350 cubic meter and 1 No. for firefighting system 1200 cubic meter.
• Chilled water system.
• Pre insulated pipes for the chilled water system.
• Heat exchanger plant room (4 plant room each one have. 3 H.E)
• Air Handling unit
• HVAC Ducting Network& chilled water piping.
• Domestic water Pumping Stations
• Fire Fighting Sprinkler System Network.
• Supervision for the district cooling plant (DCP)
• Testing and commissioning of all mechanical equipment

Senior Mechanical Engineer (SME) at allied
  • United Arab Emirates - Dubai
  • June 2007 to August 2007

PROJECT # (5) from date 1/06/07 to 1/08/07
Job title: Senior Mechanical Engineer (SME)
Supervision for all Mechanical activities.
Project Description
OLD TOWN - PHASE B - BURJ DUBAI DEVELOPMENT
➢ Mid-rise buildings and amenity - 19 No.
➢ Owner: EMMAR
➢ Project value for MEP: 150, 000, 000 AED
➢ Project manager: MACE
➢ Arch. Consultant: DSA
➢ Civil Consultant: LC
➢ Landscape consultant: AKC
➢ Main contractor: ABM "AL BASTI&MUKTAHA"
➢ Subcontractor: BILT MIDDLE EAST.
Duties
• Redesign, Review the shop drawing, material submittals, supervisions at site.
• Chilled water system.
• Pre insulated pipes for the chilled water system.
• Heat exchanger plant room (4 plant room each one have. 3 H.E)
• Air Handling unit (15 Plant rooms)
• Car park exhausts system.
• Pressurization fan for the stair case.
• HVAC Ducting Network& chilled water piping.
• Irrigation system.
• Swimming pools (6 Swimming pool)
• Water Feature (23 Water feature)
• Water Pumping Stations (14stations)
• Sewage pumping station (2 station)
• Car park drainage system (2 station)
• Subsoil drainage system (2 station)
• Fuel system (tank, pumps & piping, ) (6 station)
• Fire Fighting Sprinkler System Network.
• CO2 system.
• FM200 system.
• Foam Deluge system.
• Garbage chute system (14 station)
• Testing and commissioning of all mechanical equipment.
C) JAN 1995 to MARCH 2005 AT CAIRO - EGYPT

Senior Mechanical Engineer at ALLIED CONSULTANTS Ltd
  • United Arab Emirates - Dubai
  • March 2005 to August 2007

3) March 2005- August 2007 ALLIED CONSULTANTS Ltd.

Senior Mechanical Engineer (SME) at Allied
  • United Arab Emirates - Dubai
  • March 2007 to June 2007

PROJECT # (2) from date 1/03/07 to 1/06/07
Job title: Senior Mechanical Engineer (SME)
In charge of supervision for all mechanical activities.
Project Description
District cooling plant - DCP 1 - BURJ DUBAI DEVELOPMENT
Emaar's District Cooling Plant No 1, serving the Burj Dubai Tower and the Dubai Mall with a total cooling capacity of 44000 TR, the plant design is based on the concept of ice thermal storage system including water cooled centrifugal chillers, cooling towers and related plant equipment & accessories.

➢ Owner: EMMAR
➢ Project value for MEP: 300, 000, 000 AED
➢ Project manager: TURNER
➢ Arch. Consultant: DP
➢ Civil Consultant: MEINHARDT
➢ Main contractor: CONSOLIDATED CONTRACTORS INT'L CO "CCC".
➢ Subcontractor: GULF DISTRICT COOLING "GDC".
Duties
• Mechanical activities supervision

PROJECT # (3) DESIGN TASK
Job title: Senior Mechanical Engineer (SME)
Project Description
➢ Project: RESIDENTIAL BUILDING B+G+10 typ. floors, International city "CHINA TOWN"
➢ Owner: AL NABOODAH GENERAL ENTERPRISES HOLDING CO. LLC.
➢ Arch. Consult.: ADAM BUREAU.
Duties
• Design for firefighting systems.

PROJECT # (4) DESIGN TASK
Job title: Senior Mechanical Engineer (SME)
Project Description
➢ Project: MEFLEH RESIDENTIAL BUILDING 3B+Mezz.+Gr+12 typ. floors
➢ Owner: MEFLEH
➢ Arch. Consult.: ADAM BUREAU
Duties
• Design for plumbing system and swimming pool.
• Design for firefighting systems.

Senior Mechanical Engineer (SME) at allied
  • United Arab Emirates - Dubai
  • March 2005 to March 2007

PROJECT # (1) from date 1/03/05 to 1/03/07
Job title: Senior Mechanical Engineer (SME)
In charge of supervision for all mechanical activities.
Project Description
OLD TOWN - PHASE A1 - BURJ DUBAI DEVELOPMENT
➢ Mid-rise buildings and amenity - 15 No.
➢ Owner: EMMAR
➢ Project value for MEP: 80, 000, 000 AED
➢ Project manager: MACE
➢ Arch. Consultant: DSA
➢ Civil Consultant: LC
➢ Landscape consultant: AKC
➢ Main contractor: ABM "AL BASTI&MUKTAHA"
➢ Subcontractor: BILT MIDDLE EAST.
Duties
• Redesign, Review the shop drawing, material submittals, supervisions at site.
• Chilled water system.
• Pre insulated pipes for the chilled water system.
• Heat exchanger plant room (3 plant room each one have. 3 H.E)
• Air Handling unit (9 Plant rooms)
• Car park exhausts system.
• Pressurization fan for the stair case.
• HVAC Ducting Network& chilled water piping.
• Irrigation system.
• Swimming pools (4 Swimming pool)
• Water Feature (14 Water feature)
• Water Pumping Stations (9stations)
• Sewage pumping station (2 station)
• Car park drainage system (3 station)
• Subsoil drainage system (3 station)
• Fuel system (tank, pumps & piping, ) (4 station)
• Fire Fighting Sprinkler System Network.
• CO2 system.
• FM200 system.
• Foam Deluge system.
• Garbage system (10 station)
• Testing and commissioning of all mechanical equipment.

Senior Mechanical Engineer (SME) at Shaker Consultancy Group
  • Egypt
  • March 2001 to March 2005

1) March 2001 - March 2005 Shaker Consultancy Group ( SCG)

Job title: Senior Mechanical Engineer (SME)
Project Description
City Stars, Heliopolis (GOLDEN PYRAMIDS PLAZA)
Total Floor Areas 750, 000 sq mt, Integrated tourism, Hotels, Residential, Office, Retail, and Leisure Complex.
➢ Owner: Golden Pyramids Plaza Company
➢ Project value: 700 Million Us Dollars (250 Million Us Dollars For Electromechanical Works)
➢ Project manager: Bechtel international
➢ Arch. Consultant: Cassia &Associates
➢ Civil Consultant: Arab consultant engineers " Moharram - Bahkoum "
➢ Main contractor: CCC "Consolidated contractors international company" J.V with Orascom
➢ Subcontractor: Debbas Enterprise Ltd.
Duties
• Review Shop Drawing.
• Review Material Submittals.
• Review Hydraulic Calculations for sewage, booster & fire Pumps.
• Supervision on installation for all piping networks "fire, drainage, water ".
• Supervision on installation for fire, submersible, boiler, booster, Pumps.
• Prepare monthly technically report.
• Redesign plumbing & fire fighting works.

Site Manager (SM) at Glaxo Welcome company
  • Egypt - Cairo
  • April 1996 to July 2001

PROJECT # (1) from date 1/04/96 to 15/07/97
Job title: Site Manager (SM)
Project Description
➢ Project: Fire fighting network.
➢ Owner: Glaxo Welcome company for pharmaceutical
➢ Project value: 1, 700, 000 L.E
Duties
• Organizing all site activities.
• Secure quality and time schedule of the work.
• Preparing weekly and monthly reports.
• Invoices.
• Material and equipment purchasing.
• Erection for underground & Suspension pipes.
• Installation to Fire pump room "electrical, diesel, jockey ".
• Installation to sprinkler system, foam box, fire hose reel, fire hydrant.

Head Section for the Technical Mechanical Department at Main Office
  • Egypt
  • July 1997 to March 2001

Main Office from date 15/07/97 to15/03/2001
Job title: Head Section for the Technical Mechanical Department.

❖ Tendering Projects
Project Location
➢ Hilton Hotel Taba
➢ Golden Pyramids Plaza (Phase I) Nasr City-Cairo
➢ Shallalat Hilton Sharm El-Shikh
➢ Four Season Hotel Jordan
➢ Nevert Bay Hotel Hurgada
➢ Sama Masr Administration Building Cairo
➢ Poles Factory 6 October City - Cairo
➢ Changi Air Port Singapore
➢ Train Station Hong Kong
➢ TV Building Extension Cairo
➢ Cement Factory El-Swiss-Cairo
➢ Oriental Resort Sharm El-Shikh
➢ Residence & Construction Bank Cairo
➢ World Health Organization (WHO) Nasr City-Cairo
➢ La-Pouar Factory Cairo
➢ Beverly Hills 6 October City-Cairo
➢ Golden Pyramids Plaza (Phase 2) Nasr City-Cairo
➢ Lube Oil Extension Alex.
➢ Polyester Factory (Zimmer) El-Amria (Alex.)
Duties
• Tendering projects
• Cost Completion
• Cost Expenditure
• Material Planning
• Take Off Material
• Material Submittals
• Shop Drawings
• Material Inspection
• Negotiation with suppliers

❖ Projects Execution

PROJECT # (1)
➢ Project: Shallalat Hilton "Sharm El-Sheikh".
➢ Owner: Arabic tourism company
➢ Project value: 17 Million L.E For Electromechanical Works.
➢ Main Consultant: Saboour

PROJECT # (2)
➢ Project: Europe Egyptian Pharmaceutical Plant (EEPP)
➢ Owner: EEPP
➢ Project value: 20 Million L.E For Electromechanical Works.
➢ Main Consultant: Dar El-Handsa.

PROJECT # (3)
➢ Project: Canary Beach Village Tourist.
➢ Owner: Megicon tourism company
➢ Project value: 15 Million L.E For Electromechanical Works.
➢ Main Consultant: Saboor


Duties
• Mechanical shop drawings.
• Domestic pumping station.
• Sewage pumping station.
• Fire Pumps Room
• Hot water network.
• Steam network.
• Boilers room.
• Compressor Machine Room.
• Laundry & Kitchen Equipment's
• Fire Fighting System
• LPG System
• Nitrogen System
• Preparing submittal for all mechanical activity.
• Preparing time schedule.
• Invoices.
• Supervision on Installation for all mechanical Activity.

mechanical Engineer at Megicon
  • Egypt - Cairo
  • April 1996 to March 2001

(2) April 1996 - March 2001 Megicon for Contracting and Development

Construction Mechanical Engineer at NEIC company
  • Egypt - Cairo
  • January 1995 to April 1996

(3) Jan 1995 - April 1996 NEIC company
Job title: Construction Mechanical Engineer
Project Description
➢ Project: Electrical motor factory.
➢ Owner: NEIC
➢ Project value: 5 Million L.E.
Duties
• Mechanical equipment Cooling Tower
• Fuel system network Piping, Underground tank, Daily Tank & Pumps.
* Water Network Piping Tank, Piping & Booster Pumps.
• Drainage Network Piping Piping, Sewage Pumps.
• Compressed air network Compressor, Receiver, Dryer Network
• Preparing all purchase order
• Take Off Material to spare parts

Education

Bachelor's degree, Bcs
  • at Faculty of Engineering
  • May 1994

Mechanical Engineer

Specialties & Skills

Languages

Arabic
Expert
English
Intermediate

Training and Certifications

ISO (Certificate)
Date Attended:
March 2000
Valid Until: