مجموع سنوات الخبرة: 20 سنوات, 9 أشهر
يناير 2011
إلى حتى الآن
Project Manager
في LEONI Wiring Systems
البلد :
مصر - القاهرة
Responsible for key projects in different international locations.
Assure proper utilization of resources by maneuvering the resources based on work load and project complexity.
Perform cost management by preparing the capital expenditure and ensure the project adherence with planned costs.
Conduct project risk planning by monitoring the risk triggers and dealing with them based on the contingency plan for each risk.
Managing the sample area with zero customer concerns and schedule adherence of about 95%.
Leading a team of the KATA improvement projects.
Assure proper utilization of resources by maneuvering the resources based on work load and project complexity.
Perform cost management by preparing the capital expenditure and ensure the project adherence with planned costs.
Conduct project risk planning by monitoring the risk triggers and dealing with them based on the contingency plan for each risk.
Managing the sample area with zero customer concerns and schedule adherence of about 95%.
Leading a team of the KATA improvement projects.
أكتوبر 2008
إلى يناير 2011
Senior Project Engineer
في LEONI Wiring Systems
البلد :
مصر - القاهرة
Responsible for the Lighting sector mainly BMW & Mercedes.
Coach a team of 4 members; Analyzing and prioritizing their workload.
Responsible for the KPIs, setting and reviewing targets of the team.
Set training and development plans for the team.
Customer interface providing technical and improvement solutions on/off site from the design phase till the closure phase of the project.
Liaison with production planning, sales, and process and development departments.
Coach a team of 4 members; Analyzing and prioritizing their workload.
Responsible for the KPIs, setting and reviewing targets of the team.
Set training and development plans for the team.
Customer interface providing technical and improvement solutions on/off site from the design phase till the closure phase of the project.
Liaison with production planning, sales, and process and development departments.
مايو 2006
إلى أكتوبر 2008
Project Engineer
في Leoni Wiring Systems
البلد :
مصر
Led Lean Manufacturing & Six Sigma project team in automating the taping process and layout improvements achieving 60, 000 € by minimizing wastes.
Develop timing plans, co-ordinates the activities necessary to assure the successful introduction of new products in the agreed time.
Communicate with customers and suppliers to achieve proper introduction of projects to deliver a quality product in a cost effective way.
Assess facilities planning concepts: design layouts with optimum material flow to achieve the best MOM and area utilization.
Maintain continuous improvement by identifying problems in manufacturing and solving those using appropriate techniques.
Communicate with several departments to ensure timely implementation of project milestones.
Failure Mode and Effects Analysis (FMEA) co-coordinator.
Develop timing plans, co-ordinates the activities necessary to assure the successful introduction of new products in the agreed time.
Communicate with customers and suppliers to achieve proper introduction of projects to deliver a quality product in a cost effective way.
Assess facilities planning concepts: design layouts with optimum material flow to achieve the best MOM and area utilization.
Maintain continuous improvement by identifying problems in manufacturing and solving those using appropriate techniques.
Communicate with several departments to ensure timely implementation of project milestones.
Failure Mode and Effects Analysis (FMEA) co-coordinator.
يوليو 2004
إلى أبريل 2006
Process Engineer
في Kandil Industries for steel
البلد :
مصر
Member of the Research and Development team.
Supervised the processes of 2 production lines (Annealing and Pickling).
Researched and developed the annealing program achieving 3 hrs saving from the annealing cycle which reduced the consumed energy and material with total savings of 80, 000€.
Developed working instruction for many production lines.
Conducted feasibility studies for various new pickling lines and selected the best offer that would fulfill the requirements.
Supervised the processes of 2 production lines (Annealing and Pickling).
Researched and developed the annealing program achieving 3 hrs saving from the annealing cycle which reduced the consumed energy and material with total savings of 80, 000€.
Developed working instruction for many production lines.
Conducted feasibility studies for various new pickling lines and selected the best offer that would fulfill the requirements.
أغسطس 2003
إلى أكتوبر 2003
Manufacturing Engineering Trainee
في General Motors Egypt
البلد :
مصر
Developed Time Studies for the Opel Corsa assembly line which increased the daily production of the line.(group project)
Attended sessions on the assembly and disassembly of various automotive gearboxes.
Attended sessions on the assembly and disassembly of various automotive gearboxes.