Amr Kandil, Project Manager

Amr Kandil

Project Manager

LEONI Wiring Systems

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Mechanical Engineering
Expérience
20 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 1 Mois

Project Manager à LEONI Wiring Systems
  • Egypte - Le Caire
  • Je travaille ici depuis janvier 2011

 Responsible for key projects in different international locations.
 Assure proper utilization of resources by maneuvering the resources based on work load and project complexity.
 Perform cost management by preparing the capital expenditure and ensure the project adherence with planned costs.
 Conduct project risk planning by monitoring the risk triggers and dealing with them based on the contingency plan for each risk.
 Managing the sample area with zero customer concerns and schedule adherence of about 95%.
 Leading a team of the KATA improvement projects.

Senior Project Engineer à LEONI Wiring Systems
  • Egypte - Le Caire
  • octobre 2008 à janvier 2011

 Responsible for the Lighting sector mainly BMW & Mercedes.
 Coach a team of 4 members; Analyzing and prioritizing their workload.
 Responsible for the KPIs, setting and reviewing targets of the team.
 Set training and development plans for the team.
 Customer interface providing technical and improvement solutions on/off site from the design phase till the closure phase of the project.
 Liaison with production planning, sales, and process and development departments.

Project Engineer à Leoni Wiring Systems
  • Egypte
  • mai 2006 à octobre 2008

 Led Lean Manufacturing & Six Sigma project team in automating the taping process and layout improvements achieving 60, 000 € by minimizing wastes.
 Develop timing plans, co-ordinates the activities necessary to assure the successful introduction of new products in the agreed time.
 Communicate with customers and suppliers to achieve proper introduction of projects to deliver a quality product in a cost effective way.
 Assess facilities planning concepts: design layouts with optimum material flow to achieve the best MOM and area utilization.
 Maintain continuous improvement by identifying problems in manufacturing and solving those using appropriate techniques.
 Communicate with several departments to ensure timely implementation of project milestones.
 Failure Mode and Effects Analysis (FMEA) co-coordinator.

Process Engineer à Kandil Industries for steel
  • Egypte
  • juillet 2004 à avril 2006

 Member of the Research and Development team.
 Supervised the processes of 2 production lines (Annealing and Pickling).
 Researched and developed the annealing program achieving 3 hrs saving from the annealing cycle which reduced the consumed energy and material with total savings of 80, 000€.
 Developed working instruction for many production lines.
 Conducted feasibility studies for various new pickling lines and selected the best offer that would fulfill the requirements.

Manufacturing Engineering Trainee à General Motors Egypt
  • Egypte
  • août 2003 à octobre 2003

 Developed Time Studies for the Opel Corsa assembly line which increased the daily production of the line.(group project)
 Attended sessions on the assembly and disassembly of various automotive gearboxes.

Éducation

Baccalauréat, Mechanical Engineering
  • à American University in Cairo
  • juin 2004

Specialization: materials and industrial and manufacturing Engineering

Etudes secondaires ou équivalent, Science
  • à IGCSE
  • juin 1998

IGCSE

Specialties & Skills

Project Management
MS Project
Time Studies
Feasibility Studies
Cycle Time Reduction
MS Word, Excel, Power Point, Project), AutoCAD 2D & 3D,MAT-Lab

Langues

Anglais
Expert
Arabe
Expert

Adhésions

PMI
  • Member
  • August 2011

Formation et Diplômes

PMP (Certificat)
Date de la formation:
August 2011
Valide jusqu'à:
August 2011