Expériences professionnelles

Total des années d'expérience :19 years, 10 Mois

Sr. QAQC Engineer à JAMES L. WILLIAMS MIDDLE EAST LLC
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis janvier 2013

1 SR. QA/QC ENGINEER, ( Nov. 2013 - Present )
JAMES L. WILLIAMS MIDDLE EAST L.L.C (Constructions/Infrastructures,
Electro-Mechanical Works, Power projects)
Projects: Dubai Metro Underground Stations Project, Dubai Airport C3, District Cooling Jabel Ali, Mix Development Projects-Hotel Apartment & Villas).

2. QAQC ENGINEER ( 2009-2013)
ETA-ASCON (M&E DIVISION)

• Responsible in supervision and implementing quality standards and procedures at site as per specifications and requirements of the client.
• Carried-out Inspection of Incoming Materials, Installation and Testing & Commissioning of equipment and services at site as per ITP plan.
• Prepare Inspection & Test Plan, Method Statement, Job Safety Analysis and HSE Risk Assessment as per Environmental Management Plan(EMP) and EPSS.
• Prepare MIR and ITR attaching related supporting documents ( FAT, MA, design, shop drawings, Test Reports) for specified items and system services that are subject for inspection.
• Ensure installation and testing being carried out at site as per approved Method Statement, material, design and shop drawings.
• Assist Testing and Commissioning of Equipment and other system services at site conducted by the Third Parties to make sure all are carried-out accordance with specifications and requirements.
• Responsible in issuing and closing of Non-Conformance Report (NCR) at site for any occurrence of non-conformances and provide monitoring report.
• Coordinates and follow-up to site team, main contractor, sub-contractor and consultant regarding quality issues and inform to concern personnel.
• Make sure all Inspection, Measuring & Test Equipments are calibrated and in good condition whenever inspection or testing being carried-out.
• Provide updates thru Inspection monitoring reports at site that are under my supervision related to QAQC matters then submit to the Manager.
• Proper control of QAQC reports, documents & filings.
• Close coordination to my manager and concern personnel at site for a quicker response for any rejected items and services encountered.

Project Engineer / QAQC Engineer à IBR Electro-Mechanical L.L.C.
  • Émirats Arabes Unis - Dubaï
  • octobre 2006 à décembre 2008

2 MEP PROJECT ENGINEER - ( Dec. 2006 - Dec. 2008 )
IBR Electro-Mechanical Works L.L.C ( MEP Constructions/Infrastructures)
(Engage in Electro-Mechanical Works, Mechanical -Electrical Plumbing, HVAC & Refrigeration, High Rise & Commercial Bldg.)
Project Handled: Hotel Apartment Bldg. (2B+G+6+MF, 2B+G+30+MF )

1 Estimate and prepare bill of quantity for MEP works (Mechanical, Electrical, Plumbing & Fire Fighting) as per tender or shop drawings requirement.
2 Estimates & design HVAC ducting layout, static pressure and load distribution as per specification requirements.
3 Responsible in monitoring the execution & progress of the whole project.
4 Oversee and follow up daily activities of personnel within my supervision (engineers, supervisors, foreman, and draftsman) to keep updated of the issues and important details for the project.
5 Coordinate to consultants and main contractor regarding the MEP works and site progress as well as important issues for the work being carried out.
6 Coordinate with engineers and concerned departments regarding the material & shop drawings submittals as per client & consultants requirements.
7 Make sure that all material and shop drawings submittals are approved prior to work execution and purchasing of materials.
8 Prepare work plan schedule and manpower allocation base on the target date to finish the work.
9 Monitor and follow-up material stocks and availability base on the work plan schedule.
10 Make sure the work will be finished on the target date required.
11 Prepare daily, weekly & monthly progress report then submit to Managing Director as well as for work monthly billing purposes.
12 Responsible in maintaining smooth work flow and good welfare of the personnel within my supervision.

HVAC ENGINEER à SHAR CENTER INT'L. AIR CONDINTIONING EST.
  • Arabie Saoudite - Jeddah
  • juin 2003 à juillet 2006

4 HVAC ENGINEER ( June 2003 - July 2006 )
(Mechanical Engineer)
SHAR CENTER for Int'l. Air Condition, Jeddah, K.S.A.
Sub-contractor for Oil & Gas HVAC Inspection, Maintenance & Installation.
Client: MADAEN, ARAMCO, BINLADIN, SAUDI OGER & MODA.

• Responsible in HVAC design, layout plans/drawings, estimates, cost analysis, project execution, inspection, piping installation and maintenance of various HVAC equipments ( Chillers, Cooling Towers, AHU’s, FCU’s, Heat Exchangers, Compressors, Fans, Valves, Instrumentations and Pumps)
• Supervision of duct man and technician's daily activities.
• Monitor progress of the sales & project on site then prepare progress reports.
• Prepare daily schedule of service and maintenance of technicians.
• Coordinate with the client, customers, contractors, suppliers and other companies regarding quality and improvement of work.
• Supervision of materials control at warehouse.
• Implement good planning and management on scope of work.
• Do field work survey and maintenance if necessary.
• Prepare progress report for billing and daily / monthly reports to be submitted to the manager.
• Instill proper work discipline and flexibility in handling manpower / subordinates.

QAQ ENGINEER à HAYAKAWA COMPONENT TECHNOLOGIES INC.
  • Philippines
  • octobre 2001 à juin 2004

6 QUALITY ASSURANCE (QA) ENGINEER, ( October 2001 - June 2004)
Hayakawa Component Technologies, Inc. (Electro-Mechanical Assembly & Manufacturing Co.)
(Engage in ATM Machine Electro-Mechanical Assembly, Photo Copier Machine (Konica & Sekonic), Car Stereo, Plasma Fax machine Assembly, Metal & Die Tooling, Electro-Plating, Plastic Moulding and Wire Harness etc.)
Main Ave. Cavite Export Processing Zone
Rosario, Cavite.Philippines.

1 Supervision of Incoming and Outgoing Inspection activities.
2 Conduct Inspections, measurements and testing using specified machines for every assembly output base on the as built drawing specification requirements and standards.
3 Prepares QA Inspection Standards / Procedures / Process Flow.
4 Conduct QA In-process Monitoring Inspection to make sure work is carried out properly.
5 Initiates proactive and preventive actions for production improvement in order to eliminate process rejections.
6 Coordinates with concerned department /section regarding the quality of work.
7 UL Machine Audit Representative / In-charge.
8 Handle Customer Quality Service / Complaint Response
9 Audit Sub-con and Supplier Product Development.
10 Conduct Instrument / Equipment Calibration and monitoring.
11 Ensure all instrument and equipment used in the production process are calibrated and in good condition.
12 Evaluate and qualify calibration laboratories base on ISO standard.
13 Instill proper work discipline and flexibility in handling manpower / subordinates.

Engineering Maintenance à SANNO Manufacturing Philippines Co.
  • Philippines
  • mai 2000 à octobre 2001

7 ENGINEERING MAINTENANCE STAFF, (May 2000 - October 2001)
Sanno Manufacturing Phils. Co. ( Chemical Compound, Gold, Silver and chrome plated for metals and eletrical conductor.)
Gateway Export Processing Zone, General Trias, Cavite, Phils.

1 Inspection and daily monitoring of machines and equipments such as Boilers, Compressors, Chillers, Pumps, Instruments and Fire Fighting Equipments being use during production process.
2 Take piping pressure gauge reading and check piping connections for leakage twice a day to make sure systems are working in good condition.
3 Conduct evaluation, preventive maintenance and repair of machines
4 Assist Testing & Commissioning of newly installed machines.
5 Provide tools and jigs needed at production line.
6 Analyze and formulation of countermeasures on every machine breakdown occurrence.
7 Conduct necessary testing for equipments to ensure its capability and durability as per API standards and Welding standards.
8 Do other task assign by the superior.

Éducation

Baccalauréat, Bachelor of Science in Mechanical Engineering
  • à UNO-Recoletos University
  • mai 2000

Specialties & Skills

Quality Inspection
Calibration
Electro mechanical
Mechanical Testing
AutoCAD
Computer Microsoft office (Excel,Word,Powerpoint.etc)

Langues

Arabe
Expert
Anglais
Expert

Adhésions

APEX NDT ( Non -Destructive Testing )
  • Member
  • September 2009