Project 1: Ruwais Housing Complex Expansion - Phase IV
(The project involves construction of a 40 Buildings G+5 comprising a ground floor and 5 additional floors offering 48 housing units each building, in 2320 sq.m area in addition to the estimation of 15km of infra works, irrigation, 11 Sub-stations and 4 Mosques).
Project 2: construction of central park & villas community facilities
(Shops Buildings, Cricket Filed, Parks & irrigation works)
Client: ADNOC
Responsibility:
 Reviews shop drawings, Material Submittals, and Methods statements to make sure they are as per contract drawings, specifications, local regulation and Standards.
 Monitors performance of contractors, reporting the progress and assisting CM in decision making.
 Performs various administrative duties as assigned.
 Dealing with contractor to assure project is executed as per client’s requirements
 Verifying materials & long lead items delivered to site through MVRs.
 Supervising the site inspection engineer’s and making sure that all works (MEP) executed are according to approved shop drawings, method statements and inspection/test plans.
 Reporting to construction manager on works implementation at site
 Apply and implement all quality controls and quality procedures of the site.
 Review of as Build drawing
 Coordinating with QA/QC, civil and all other departments to assure execution of the work as per plans

Project Engineer à BIN HAM ELECTROMECHANICAL ENT. LLC
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2011 à juin 2015

Project : Construction Works for Refurbishment of Mafraq, Ghantoot
And Al Khatim WWTPs and Associated Works
CLIENT : ADSSC
CONSULTANT : PARSONS INTERNATIONAL LIMITED
Main Contract : BIN HAM ELECTROMECHANICAL ENT. LLC
Position : Mechanical Engineer - Approved as Mechanical Engineer
From PIL/ADSSC - Reported to PM
Responsibility:
 Follow-up material and drawing and Method Statement submittal, compliance statement according to the project specification, until it’s approved, and monitoring the same in log sheet.
 Preparing Technical Proposal of all variation work.
 Attending meeting with Consultant / Client and solving all site issue.
 Preparing permit to work, entry permit, and follow all client procedure.
 Preparing Monthly Progress Report and submit the same to consultant.
 Preparing RCDR / Measurement Sheet as per ADSSC Standard for invoice.
 Certifying incoming invoices from supplier / subcontractor.
 Ensure the progress is going according to planning program.
 Monitoring all mechanical BOQ activity,
 Ordering for all materials as per the approved submittal, insured the delivery date according to mechanical planning job, and closed inspection of all delivered materials.

Project Engineer à Unisafe Fire Protection Specialists LLC
  • Émirats Arabes Unis - Dubaï
  • septembre 2008 à décembre 2010

Project 1 : The Building by DAMAN @ DIFC (5B+G+4P+65)
(The 235m-high development is a 65-floor mixed use residential and commercial complex that include freehold apartments, offices, retail space and a luxury hotel built on a 20, 440m2 plot of land)
Main Contract : Oger Dubai
MEP Contractor : ETA M&E
Position : Project Engineer
Responsibility:
 Managing the site team of 2 site engineers and average of 40 labors.
 Break down the Fire Protection planning from MEP recovery program; deploy the team according that, and follow-up the progress in daily basis.
 Follow-up material and drawing submittal, preparing compliance statement according to the project specification, until it’s approved, and monitoring the same in log sheet.
 Preparing Quantity take-off from FF shop drawings, and requesting for the same with the delivery schedule, and ensure the delivery of materials are in time.
 Attending the site meeting with MEP/Main contract/Consultant, and clear all technical & site issues.
 Preparing Submission of monthly invoice and follow-up the payment certificate.
 Check and approve invoices of Sub-Contractors & Suppliers
 In charge of following up the FP related changes, additional works as well as claims in accordance with the established procedure of the contract.
 Installing Sprinkler system, Stand Pipe system, FM 200, Pump Station and Pre-Action system According to NFPA Standard and DCD requirement.
 Follow-up shop drawings approval from DCD with UNISAFE coordinator.


2nd Project from February 2010 up to December 2010 the details of project as bellow
Project 2 : D1 tower, Dubai (3B+G+78)
Client : Emirates Sunland.
Main Contract : KELE.
MEP Contract : Hastie International.
Position : Project Engineer.
Responsibility:

HVAC Engineer à Minarco Electrical & Mechanical Works
  • Émirats Arabes Unis - Abu Dhabi
  • septembre 2007 à août 2008
Site Engineer à Karaf Cooling Enterprise
  • Soudan - Khartoum
  • avril 2004 à avril 2007

ion and maintenance manual.

Éducation

Baccalauréat, Mechanical Engineering
  • à University Of Khartoum
  • novembre 2003

BSc. honor in mechanical engineering

Specialties & Skills

Schedule Planning
Program Monitoring
Technical Issues
Fire Protection
MS office, word, excel, PowerPoint etc

Langues

Arabe
Expert
Anglais
Expert

Formation et Diplômes

35 Hrs of PMBOK, preparation of PMP (Certificat)
Date de la formation:
December 2011
Valide jusqu'à:
January 2012