Total Years of Experience: 19 Years, 3 Months
June 2013
To Present
Estate Manager
at NCBIS
Location :
Egypt - Cairo
Operation Management
Maintenance and renovation
setup for events
Maintenance and renovation
setup for events
July 2012
To June 2013
Assistant Chef Engineer -mechanical engineer
at Total FM - Porto Sokhna -Amer Group
Location :
Egypt - Suez
During my work I passed with the department through the following projects & targets ….
• Recover a lot of the construction problems .
o Emergency lighting installation
o Master key plan design & installation .
o Total snagging for the entire site.
o Install new sensors for electric saving in building corridors .
• Engineering Filling System
Water quality log books
As built drawings - catalogs
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs in Electricity for public area
• Go in deep in all of the Hotel Projects during the low season periods
o Total electric maintenance for street lighting
o Handrails renewing in all the site.
• Engineering Department operation
o Managing the operation tasks through the supervisors & technician
o Modifications calculations
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Daily report preparation .
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
• Recover a lot of the construction problems .
o Emergency lighting installation
o Master key plan design & installation .
o Total snagging for the entire site.
o Install new sensors for electric saving in building corridors .
• Engineering Filling System
Water quality log books
As built drawings - catalogs
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs in Electricity for public area
• Go in deep in all of the Hotel Projects during the low season periods
o Total electric maintenance for street lighting
o Handrails renewing in all the site.
• Engineering Department operation
o Managing the operation tasks through the supervisors & technician
o Modifications calculations
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Daily report preparation .
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
September 2010
To July 2012
Assistant Chef Engineer - acting Chef Engineer
at Carols Hotel
Location :
Egypt
During my work I get a lot of experience in a lot of fields & projects ….
• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems
o Fire alarm / Fighting system
o Air condition system “Chiller - AHUs - Split Units - Hoods ”
o Kitchen Equipments
o Electric Distribution system “ Medium - Transformers - Earthing - …”
o Sewage system “sewage plant - sewage man halls ”
o Domestic Water system
o Hot water system “Hot water Boiler - Electric heaters - calorifiers ”
o Swimming Pools “pumps - filters - heat exchangers ”
• Engineering Filling System
o Total Engineering Filling System Creation
Water quality log books / Leganila disinfection protocol filing
Elevators -kitchen equipments - data and service visits
As built drawings - catalogs
Travel life environmental file
Fax in /out - …..etc
o Prepare & implement total maintenance checklists
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs “Water - Electricity - etc…”
• Working with external auditors
o Hygiene consultant “Crystal Co.”
o Environment Consultant “Travel Life ”
• Go in deep in all of the Hotel Projects during the low season periods
• Managing the Engineering Department
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems
o Fire alarm / Fighting system
o Air condition system “Chiller - AHUs - Split Units - Hoods ”
o Kitchen Equipments
o Electric Distribution system “ Medium - Transformers - Earthing - …”
o Sewage system “sewage plant - sewage man halls ”
o Domestic Water system
o Hot water system “Hot water Boiler - Electric heaters - calorifiers ”
o Swimming Pools “pumps - filters - heat exchangers ”
• Engineering Filling System
o Total Engineering Filling System Creation
Water quality log books / Leganila disinfection protocol filing
Elevators -kitchen equipments - data and service visits
As built drawings - catalogs
Travel life environmental file
Fax in /out - …..etc
o Prepare & implement total maintenance checklists
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs “Water - Electricity - etc…”
• Working with external auditors
o Hygiene consultant “Crystal Co.”
o Environment Consultant “Travel Life ”
• Go in deep in all of the Hotel Projects during the low season periods
• Managing the Engineering Department
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
December 2007
To September 2010
Maintenance Engineer
at intercontinental hotels
Location :
Other
"The Palace Hotel" As a Maintenance Engineer
During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….
• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.
• Created all the maintenance check lists “daily checks - weekly -monthly-3 monthly - …. etc” check lists for all site equipments, follow up the PM Implementation.
• Follow up all the utilities consumption - according to IHG Standard -on daily basis-.
• Prepare & Work with water quality book according to IHG requirements.
• Create escape plane -room door escape plan- for the hotel.
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Work with saving cost programs “water - electricity ….”.
• Work with the electric earth protection in the rooms & equipments.
• Working with hygiene consultant “Crystal Co.”
• Working with water Quality consultant “House Man Co.”
• Working according to FLS requirements.
During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….
• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.
• Created all the maintenance check lists “daily checks - weekly -monthly-3 monthly - …. etc” check lists for all site equipments, follow up the PM Implementation.
• Follow up all the utilities consumption - according to IHG Standard -on daily basis-.
• Prepare & Work with water quality book according to IHG requirements.
• Create escape plane -room door escape plan- for the hotel.
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Work with saving cost programs “water - electricity ….”.
• Work with the electric earth protection in the rooms & equipments.
• Working with hygiene consultant “Crystal Co.”
• Working with water Quality consultant “House Man Co.”
• Working according to FLS requirements.
July 2006
To December 2007
3D Cad Cam designer for Spare Parts -Molds - Dies
at ESPI
Location :
Egypt
• Design a plastic mold "Simple molds"
• Design sheet metal dies "Cutting Dies"
• Spare parts Design
• Medical lines Requirement Design
• Reverse Engineering
• Using CAD-CAM-CAE systems " Unigraphics NX4.0"
• Create company Introduction presentation
• Case Study for projects "design view"
• Design sheet metal dies "Cutting Dies"
• Spare parts Design
• Medical lines Requirement Design
• Reverse Engineering
• Using CAD-CAM-CAE systems " Unigraphics NX4.0"
• Create company Introduction presentation
• Case Study for projects "design view"
December 2004
To July 2006
CNC Engineer
at SIROMISR
Location :
Egypt
- I was CNC engineer "Wire & Milling M/C".
- plastic mould “injection & extortion ” Maker
CAD / CAM Engineer For wire cut M/C
- create 3D drawing using CAD Soft "Solid Edge"
- Create 2D Wire Cut CAD file using AutoCAD
-Create Wire Cut Cam file Using ESPrit Soft Ware
- plastic mould “injection & extortion ” Maker
CAD / CAM Engineer For wire cut M/C
- create 3D drawing using CAD Soft "Solid Edge"
- Create 2D Wire Cut CAD file using AutoCAD
-Create Wire Cut Cam file Using ESPrit Soft Ware
Share on Facebook
Share on Twitter
Share Via Email