جورج فوزي عبد الملاك, Estate Manager

جورج فوزي عبد الملاك

Estate Manager

NCBIS

البلد
مصر - القاهرة
التعليم
بكالوريوس, Mechanical production engineering
الخبرات
19 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 5 أشهر

Estate Manager في NCBIS
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يونيو 2013

Operation Management
Maintenance and renovation
setup for events

Assistant Chef Engineer -mechanical engineer في Total FM - Porto Sokhna -Amer Group
  • مصر - السويس
  • يوليو 2012 إلى يونيو 2013

During my work I passed with the department through the following projects & targets ….
• Recover a lot of the construction problems .
o Emergency lighting installation
o Master key plan design & installation .
o Total snagging for the entire site.
o Install new sensors for electric saving in building corridors .
• Engineering Filling System
 Water quality log books
 As built drawings - catalogs
 Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
 Preventive Maintenance Checklists
• Work with saving cost programs in Electricity for public area
• Go in deep in all of the Hotel Projects during the low season periods
o Total electric maintenance for street lighting
o Handrails renewing in all the site.
• Engineering Department operation
o Managing the operation tasks through the supervisors & technician
o Modifications calculations
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Daily report preparation .
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
 Putting the aim to have loyal Staff
 Deal with the Last Period in Egypt with Stable Engineering Department

Assistant Chef Engineer - acting Chef Engineer في Carols Hotel
  • مصر
  • سبتمبر 2010 إلى يوليو 2012

During my work I get a lot of experience in a lot of fields & projects ….
• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems
o Fire alarm / Fighting system
o Air condition system “Chiller - AHUs - Split Units - Hoods ”
o Kitchen Equipments
o Electric Distribution system “ Medium - Transformers - Earthing - …”
o Sewage system “sewage plant - sewage man halls ”
o Domestic Water system
o Hot water system “Hot water Boiler - Electric heaters - calorifiers ”
o Swimming Pools “pumps - filters - heat exchangers ”
• Engineering Filling System
o Total Engineering Filling System Creation
 Water quality log books / Leganila disinfection protocol filing
 Elevators -kitchen equipments - data and service visits
 As built drawings - catalogs
 Travel life environmental file
 Fax in /out - …..etc
o Prepare & implement total maintenance checklists
 Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
 Preventive Maintenance Checklists
• Work with saving cost programs “Water - Electricity - etc…”
• Working with external auditors
o Hygiene consultant “Crystal Co.”
o Environment Consultant “Travel Life ”
• Go in deep in all of the Hotel Projects during the low season periods
• Managing the Engineering Department
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
 Putting the aim to have loyal Staff
 Deal with the Last Period in Egypt with Stable Engineering Department

Maintenance Engineer في intercontinental hotels
  • غير ذلك
  • ديسمبر 2007 إلى سبتمبر 2010

"The Palace Hotel" As a Maintenance Engineer
During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….
• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.
• Created all the maintenance check lists “daily checks - weekly -monthly-3 monthly - …. etc” check lists for all site equipments, follow up the PM Implementation.
• Follow up all the utilities consumption - according to IHG Standard -on daily basis-.
• Prepare & Work with water quality book according to IHG requirements.
• Create escape plane -room door escape plan- for the hotel.
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Work with saving cost programs “water - electricity ….”.
• Work with the electric earth protection in the rooms & equipments.
• Working with hygiene consultant “Crystal Co.”
• Working with water Quality consultant “House Man Co.”
• Working according to FLS requirements.

3D Cad Cam designer for Spare Parts -Molds - Dies في ESPI
  • مصر
  • يوليو 2006 إلى ديسمبر 2007

• Design a plastic mold "Simple molds"
• Design sheet metal dies "Cutting Dies"
• Spare parts Design
• Medical lines Requirement Design
• Reverse Engineering
• Using CAD-CAM-CAE systems " Unigraphics NX4.0"
• Create company Introduction presentation
• Case Study for projects "design view"

CNC Engineer في SIROMISR
  • مصر
  • ديسمبر 2004 إلى يوليو 2006

- I was CNC engineer "Wire & Milling M/C".
- plastic mould “injection & extortion ” Maker
CAD / CAM Engineer For wire cut M/C
- create 3D drawing using CAD Soft "Solid Edge"
- Create 2D Wire Cut CAD file using AutoCAD
-Create Wire Cut Cam file Using ESPrit Soft Ware

الخلفية التعليمية

بكالوريوس, Mechanical production engineering
  • في Helwan University.
  • مايو 2004

Degree: Bachelor degree in Mechanical production engineering. * University: Helwan University. * General grade: Acceptable. * Project: Design & Manufacturing of plastic mold for Thread and nut. * Project grade: Discriminate. * Graduate year: 2004.

Specialties & Skills

Unigraphics
Maintenance Planning
Maintenance Engineering
Graphic Design
3D CAD Drawing
Preventive maintenance planner
CAM Engineer
Database Design
Macromedia designer
ms project
maintenance management
maintenance engineering
operation

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

Mubarak Puplic Library
  • member
  • May 1996