muhammad farrukh zaki, SENIOR SITE ENGINEER ROADS

muhammad farrukh zaki

SENIOR SITE ENGINEER ROADS

Parsons International Limited

Lieu
Qatar
Éducation
Baccalauréat, civil engineering subjects
Expérience
41 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :41 years, 5 Mois

SENIOR SITE ENGINEER ROADS à Parsons International Limited
  • Qatar
  • Je travaille ici depuis août 2015

construction supervision of road works under PWA.
Road widths vary between 24m and 64m.

TEAM LEADER à UMER MUNSHI ASSOCIATES
  • Bangladesh
  • février 2014 à août 2015

CONSTRUCTION SUPERVISION OF BRIDGE OVER RIVER SHITALAKHYA IN BANDAR UPZILA IN NARAYANGANJ, BANGLADESH.

RESIDENT ENGINEER à NESPAK
  • Arabie Saoudite - Jizan
  • septembre 2012 à juillet 2013

CONSTRUCTION OF 24 NO. ACCESS ROADS AND 24 NO. GABION DAMS IN JIZAN AREA OF SAUDI ARABI.

PM à NESPAK
  • Arabie Saoudite - La Mecque
  • mars 2012 à août 2012

CONSTRUCTION OF WTP, DI PIPELINE 49.2 KM LONG 600MM DIA METER AND UNDERGROUND DAM IN AL-LITH AREA IN MAKKAH REGION.

Resident engineer à NESPAK
  • Autre
  • juillet 2010 à mars 2012

CONSTRUCTION SUPERVISION OF ROADS IN RIYADH REGION 102 KM IN LENGTH FOR THE MINISTRY (MOMRA) SAUDI ARABIA
DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC

RESIDENT ENGINEER à ITALCONSULT
  • Arabie Saoudite - Jizan
  • juin 2008 à mai 2010

CONSTRUCTION SUPERVISION OF JIZAN EXPRESSWAY 130KM LONG HAVING 29 BRIDGES AND 6 INTERCHANGES.
COST: 600MILLION SAUDI RIYAL

DUTIES: QUALITY ASSURANCE, APPROVAL OF CONSTRUCTION MATERIAL, PREPARATION OF MONTHLY PROGRESS REPORTS, MONITORING PROGRESS, CHECKING AND PROCESSING CONTRACTOR;S IPCs ETC

resident engineer à italconsult
  • Arabie Saoudite
  • juin 2008 à octobre 2009

Project: Majmaa-Shaqra expressway 96 km long.

Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

snr expat contracts specialsit à nespak
  • Bangladesh
  • janvier 2008 à mai 2008

Project : 4 -laning of Dhaka-Chittagong highway 189 km long
Duties: To convene pre-bid meeting, supervise the Tender process, evaluation of bids and recommendation to the client for selection of contractor.

resident engineer à nespak
  • Pakistan - Rawalpindi
  • janvier 2007 à décembre 2007

Project: Lai expressway 11.2 km long having 2 bridges.

Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

snr expat contract specialist à nespak
  • Bangladesh
  • mai 2006 à décembre 2006

Project: 4-laning of Dhaka- Chittagong highway 189 km long

Duties: preparation of all tender documents to select a contractor for the project.

Resident engineer à nespak
  • Oman
  • septembre 2004 à avril 2006

Project: Mahout to Nizwa Thumrait road, 110 km long

Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

proncipal engineer (proposals) à nespak
  • Pakistan - Lahore
  • juillet 2003 à août 2004

duties: preparation of proposals (Technical as well as financial), LOI, EOI etc. for all domestic and international road sector projects.

Resident Engineer à nespak
  • Pakistan - Lahore
  • janvier 2001 à mai 2003

Project: " Punjab highway supervision project" 101 km
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

ARE (Site based) à nespak
  • Pakistan
  • novembre 1998 à décembre 2000

Project: ADB assisted Farm to market roads, 102 km long
Duties: To assist RE to ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

Resident engineer à nespak
  • Pakistan - Lahore
  • juin 1998 à octobre 1998

Project: Bridge over main railway track at Garhi shahu
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

Resident engineer à nespak
  • Pakistan - Karachi
  • janvier 1997 à mai 1998

Project: Fyzee Rahamin art gallery & auditorium
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
-it was 3-storey air conditioned building of 1600 persons capacity.

Resident Engineer à nespak
  • Pakistan
  • janvier 1996 à novembre 1996

Project: demolition of old and construction of new dome of shahbaz qaladar.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

senior engineer à nespak
  • Kazakhstan
  • janvier 1993 à décembre 1995

Project: development of surjani town and north Karachi
duties:Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc
Scope of work included 1000 flats/apartments, roads over 100km, water supply network and sewerage network.

Resident engineer à nespak
  • Pakistan - Islamabad
  • janvier 1991 à décembre 1992

Project: Head quarter building of Pakistan medical and dental council Islamabad.
Duties: To ensure that work done by the contractor was as per agreement, checking and processing contractor's IPCs, preparation of monthly progress reports, attending progress review meetings with the client and the contractor, approval of constructional material, etc

senior engineer à nespak
  • Pakistan - Karachi
  • janvier 1989 à décembre 1990

Project: Suzuki plant port Qasim
duties: I was responsible for quality assurance of the assembly shop and paint shop, over water tank, under ground water tank, mosque, canteen and access & internal roads.
Roof of assembly shop and paint shop was of pre-cast planks on structural steel trussed.

senior engineer à nespak
  • Pakistan - Karachi
  • janvier 1988 à décembre 1988

preparation of contract documents (volume 1, 2 and 3)
volume 1 contained: invitation to tenderer, general condition of contract, special conditions of contract
volume 2: Technical specifications
volume: BOQ

senior engineer à nespak
  • Pakistan - Karachi
  • février 1987 à novembre 1987

Project: National stadium Karachi for world cup cricket 1987
Duties: quality assurance of RCC and structural steel works
The structural steel work included
structural steel columns, structural steel girders, structural steel trusses
also quality assurance of under ground tank and over tank, floor finishes, doors and windows, steel louvers etc.

senior engineer à nespak
  • Pakistan - Karachi
  • juillet 1985 à décembre 1986

Project: terminal 3 Karachi airport- construction of road from star gate to the airport, car parks, taxiways and hard standing bays (air side)

duties: make sure that the work done by the contractor was as per specification and drawings,

junior engineer (site) à NESAPK
  • Pakistan - Karachi
  • décembre 1981 à juin 1985

construction supervision of main access road to port Qasim from national highway 11.00 km long.
duties: to ensure that the thickness and compaction of each layer of pavement was as per specifications/drawings.
also to ensure that temperature of asphalt at the time of laying was neither below nor above the specified values.

Éducation

Baccalauréat, civil engineering subjects
  • à NED university of engg and technology karachi
  • novembre 1981

I have over 29 yrs experince with consultants. 27 yrs with nespak and 2 yrs with italconsult of italy. worked as RE on oman (roads) in 2004-2005-2006 working in saudi arabia since 2008 (july) as RE (roads) worked in dhaka (Bangladesh) in second half of 2006 and 1st half of 2008 on dhaka -chittagong road project as contract specilaist . worked in apksitan as RE, ARE ,SE and junior engineer on various roads, buildings, stadium, airport,appartments, water supply and sewerage projects.

Specialties & Skills

Site Inspection
Roadshows
Quality Assurance
Civil Engineering
Construction Engineering
CONSTRUCTION SUPERVISION OF ROADS AND BUILDINGS

Langues

Anglais
Expert
Bengali
Expert
Urdu
Expert
Hindi
Expert
Arabe
Débutant

Adhésions

SAUDI COUNCIL OF ENGINEERS
  • CIVIL ENGINEER
  • April 2011
PAKISTAN ENGG COUNCIL
  • PROFESSIONAL CIVIL ENGR
  • June 1983

Formation et Diplômes

PMP (Certificat)
Date de la formation:
April 2021
Valide jusqu'à:
February 2024

Loisirs

  • reading books, watching tv and playing chess and badminton