خلدون الشيخ, Area Manager

خلدون الشيخ

Area Manager

Gulf Cooperation Symbols Contracting co., ltd.

البلد
الأردن - عمان
التعليم
بكالوريوس, B.Sc. in Civil Engineering
الخبرات
21 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 3 أشهر

Area Manager في Gulf Cooperation Symbols Contracting co., ltd.
  • المملكة العربية السعودية - الشرقية
  • يونيو 2018 إلى مارس 2020

Position Project Manager/Area Manager,
Role and responsibilities:
 Designing and applying appropriate project management standards for incorporation in the gateway Review Process.
 Managing the production of the required deliverables.
 Planning and monitoring the project.
 Adopting any delegation and use of project assurance roles within agreed reporting structures.
 Preparing and maintaining project, stage and exception plans as required.
 Managing project risks, including the development of contingency plans.
 Liaison with programme management (if the project is part of a programme) and related projects to ensure that work is neither overlooked nor duplicated.
 Monitoring overall progress and use of resources, initiating corrective action where necessary.
 Applying change control and configuration management processes.
 Reporting through agreed lines on project progress through highlight reports and end-stage assessments.
 Liaison with appointed project assurance representatives to assure the overall direction and integrity of the project.
 Maintaining an awareness of potential interdependencies with other projects and their impact.
 Adopting and applying appropriate technical and quality strategies and standards.
 Identifying and obtaining support and advice required for the management, planning and control of the project.
 Managing project administration.
 Conducting a project evaluation review to assess how well the project was managed.
 Preparing any follow-on action recommendations
Projects worked:
1-Saudi Aramco Haradh and Hawiyah Field Gas compression Project
Description of Project: Location, Haradh and Hawiyah, Duration, June 2018 up March. 2020, Client: Saudi Aramco, Budget: 190, 000, 000 S.R, the locations are spread over an approx. (150 km x120 km Area) consist of 18 sites, and cover 3 contracts, to Construct temporary facilities (Office and accommodation facilities including the construction of laydown area as warehouses. with all earth work and asphalt work with all infra-structure for all underground utilities

Project Manager في GCS
  • المملكة العربية السعودية - الدمام
  • يونيو 2016 إلى مايو 2018

Saudi Aramco Fadhili Gas Program Project.
Description of Project: Location: Fadhili, Duration, June 2016 up to May 2018., Client Saudi Aramco, Budget: 75, 000, 000 S.R, Construction of temporary facilities (Office facilities and accommodation facilities including the construction of laydown area as warehouses.

PROJECT MANAGER في GCS
  • المملكة العربية السعودية - الشرقية
  • يوليو 2015 إلى مايو 2016

Project name: Ma´aden Umm Wu´al - EPC-8 Project - Infrastructure, Utilities & Offsite.
Description of Project: Location: Ras al Khair., Budget: 65, 000, 000 S.R, Construction of Liquid Storage Tanks, Flushing Hot Water, Concrete pavement, Trenches, Containment Walls & Tanks Pumps Footings, Pipe Racks Foundation in MGA Tanks Area & Train/RC Area, Buildings (Substation/Electrical, Diesel Generator, Amenity &Transformer Yard ), Truck Unloading Area (Foundation & Underground Facilities), Earthworks for Underground Utilities , Construction of Pits And Manholes, Road And Urbanization , Drinking Water Plant Foundation, Potable Water Storage Tank Foundation, Pipe Racks Foundation, Storm water retention Pond & Channels.

PROJECT MANAGER في GCS
  • المملكة العربية السعودية - الشرقية
  • يناير 2014 إلى يونيو 2015

Emergency Response Building (ERB) at SADARA, from Jan. 2014 - JUNE 2015
Description of Project: Location: Jubail., Project Name: Emergency Response Building (ERB) at SADARA/Sadara Chemical Plant-III, Location: Jubail., Budget: 55, 000, 000 S.R, The Scope include the construction of the building with Associated infrastructure including storm water drainage, sanitary sewer (gravity and force main from local lift Station), potable water, electrical power, roads and paving, chilled water piping, Fire mains and compressed air pipe., The building consisted of 5 Zones (Workshops and Dormitories, Enclosed Steel Structure Garages, SEDC and Fire Department, Medical Centre, Ancillary Building and Utilities and site development)

Project Manager في GCS
  • المملكة العربية السعودية - الدمام
  • نوفمبر 2011 إلى ديسمبر 2013

Project Manager for the construction Aramco supporting Facilities, of Sewage Treatment plant (STP), infrastructure, Aramco offices and accommodation, ...etc

Section Eng. في Saudi Oger (Amman-Jordan))
  • الأردن - عمان
  • يناير 2009 إلى أكتوبر 2011

The Boulevard project's construction, located in the heart of the Abdali new downtown, will comprise of a total built up area of 224, 000 sqm divided into 118, 000 sqm (above ground), and 106, 000 sqm of parking and service basement levels (4 levels).

Set to become a major regional shopping and visiting destination, the 'Boulevard' will consist of a 370 meter long and 21 meter wide pedestrian strip outlined by 12 buildings, averaging 9 floors (above ground) each, and will host over 130 retail shops, 400 luxurious five-star serviced apartments, 27, 000 sqm of state-of-the-art office space; and for the first time in Jordan the rooftop experience will be introduced, hosting restaurants, fitness clubs, terraces, and pools overlooking the scenes of the city.

Project Coordinator في Al Rajhi Projects (U.A.E)
  • الإمارات العربية المتحدة - الشارقة
  • مايو 2007 إلى ديسمبر 2008

Project: ARIG HQ TOWER,
The value of the Project 350 million dirham and with total build up area of 103521 m2 consist of 59-floor with 4 basement, located in Riyadh, K.S.A and manage from our Head office in U.A.E.

Project Manager في Al-Latifia Trading & Contracting (K.S.A)
  • المملكة العربية السعودية - الشرقية
  • يوليو 2004 إلى نوفمبر 2006

Project: United Logistics Center, Dammam
Construction of above building comprising built up area of 16500 sq.m. Consisting of Main Building with Offices, Accommodation Area, and Warehouse for cold rooms, Water/Septic Tanks, Guardhouse, SCECO and External work includes all civil, finishing, electro-mechanical works.
Responsibilities:
Manage projects to time, budget and customer satisfaction.
Manage resource to cost estimate
Provide input to all plans for engineering and commissioning activities
Review recourses requirements for projects
Setting up Management meetings; running meetings; writing and distributing meeting minutes
Reporting on Construction schedule to Projects Director
Input to construction program - amendments & sequence of builds
Managing relationships with contractors and suppliers at site
Produce project handover documentation including drawings, and operation and maintenance manuals etc.

Deputy Project Manager في Al-Latifia Trading & Contracting (K.S.A
  • المملكة العربية السعودية - الشرقية
  • يونيو 2003 إلى يوليو 2004

Project: Al-Youm Press Building, Dammam

Turnkey construction of above steel structure building comprising built up area of 5851 sq.m. Consists of Press Main Building, Paper Storage, Offices, LPG Gas storage, Guard House, SCECO and External work includes cladding by Seporex Panel and all Civil, Finishing, Electro-mechanical & HVAC works.
Responsibilities:
Supervision of day-to-day activities of the Project and coordination between Project Manager and other discipline Engineers. Control the project during the absence of Project Manager, submission of all required reports to the Management and follow-up with Client/Consultant and sub-contractor.

Procurement & Quality Control Engineer في Al-Latifia Trading & Contracting (K.S.A)
  • المملكة العربية السعودية - الرياض
  • مايو 2001 إلى مايو 2003

Responsibilities:
• Contract, Subcontract agreement and purchase order.

• Quotation request inquiries from inside and out side of Saudi Arabia.

• Comparison sheet, evaluation and selection of suppliers, and proposed material complying with the project specification.

• Material Technical data, and sample submittals for Clients approval.

Involved in the following Projects:
1. SABG Elementary Schools, Hofuf.

2. The New Saudi British Bank Branch, Takhassusi Street, Riyadh.

3. Prince Turki Bin Abdu Aziz Al Awwal Headquarters and Headquarters Company (PTAB HHC) Complex, At Khashm Al An.

4. Proposed Singapore Chancery Building & Ambassador's Residence on Plot D-20 at the Diplomatic Quarter in Riyadh.

5. The Saudi British Bank, Central Province Super Branch, Riyadh.

6. Saudi Aramco New Operation, Maintenance & Engineering, Building at Riyadh Refinery, Contract No.6400044760

Site Engineer في Al-Latifia Trading & Contracting (K.S.A)
  • المملكة العربية السعودية - الشرقية
  • فبراير 2000 إلى أبريل 2001

Project: Rehabilitation Complex, Dammam
Turn key construction of above building comprises built up area of 17920 sq.m consists of Main Building varying from single to 3 stories high, which includes an indoor swimming pool & gymnasium in addition to a prosthetic unit building, a Mosque, water reclaiming station, SCECO and External work includes all Civil, Finishing & electro-mechanical works.

Planning Engineer في International Engineers for Construction Co, Jordan
  • الأردن - عمان
  • أغسطس 1999 إلى يناير 2000

Planning Engineer

Site Engineer في Ayman Abu Al-Neel Contracting Est,
  • الأردن - عمان
  • أغسطس 1998 إلى يوليو 1999

The project is a turnkey construction of Sewage Treatment Plant at Ain -Gasale, the Plant is designed to handle the Amman Waste Water Flow of existing box culvert 1.8mx1.8m discharging into existing Manhole, which is starting point of Pretreatment Plant Works.
The Sewage Treatment Plant Consist of the Following Main Functional Structures:
• Box Culvert Conveyor.
• Mechanical Screening Unit.
• Grit Chamber Unit.
• Discharge Pipe Conveyor.
• Tie in shaft Manhole, which is the end of pre-treatment plant work.

الخلفية التعليمية

بكالوريوس, B.Sc. in Civil Engineering
  • في University of Jordan
  • يونيو 1998

Engineering: B.Sc. in Civil Engineering in 1998 University of Jordan from Faculty of Engineering and Technology

Specialties & Skills

Minutes
Operation
Procurement
Staad3, Primavera, P3, P5,P6 , ,AutoCAD , Microsoft Office ,

اللغات

الانجليزية
متمرّس

العضويات

Jordan Engineers Association
  • Civil
  • August 1998
Saudi Council of Engineering
  • Civil
  • December 2013

التدريب و الشهادات

Preperation for PMP exam (الشهادة)
تاريخ الدورة:
December 2012
صالحة لغاية:
January 2013
Complete 20 Training Hrs. (الشهادة)
تاريخ الدورة:
June 2011
صالحة لغاية:
June 2011
"Introductory Awareness Session to ISO 9001: 2000" (الشهادة)
تاريخ الدورة:
November 2005
صالحة لغاية:
November 2005
Primavera ,P5 (الشهادة)
تاريخ الدورة:
January 2008
صالحة لغاية:
January 2008
Staad-3 version 18. (الشهادة)
تاريخ الدورة:
January 1998
صالحة لغاية:
January 1998
Effective Construction Contract and Site Administration (الشهادة)
تاريخ الدورة:
June 2006
صالحة لغاية:
June 2006