Field Engineer
Ericsson Pakistan PVT LTD.
Total years of experience :12 years, 3 Months
I am working as a Field Engineer in Ericsson Pakistan in Hyderabad Region, my responsibilities are to Lead the team which is engages on PMCL BSS and Mw Project. Hands-on Experience of NEC MW, Minilink, Alcatel BTS, RBS (6101, 6301 )installation, commissioning & Troubleshooting.
I worked as a BSS and Transmission Engineer in Vital Tech Engineering and Services in Shikarpur Region, and worked for (Mobilink) for the operation, installation, and maintenance of BTS and BSCs in Pakistan (Level 1).
Worked at Egyptian Pakistani Telecom Service Company (An Orascom Company) as a BSS and Transmission Engineer, Lead the Team in High Tension Environment in Gambat, Larkana, Shikarpur And Jacobabad Region, and worked for (Mobilink) for the operation, installation, and maintenance of BTS and BSCs in Pakistan (Level 1).
Job Duties/Responsibilities for BSS Engineer are as under:
* Established the (PCM-30) E-1 Connection.
* Any fault occurs in BSS & Transmission side (BTS & BSCs) have to troubleshoot,
* Installation and Maintenance of Microwave links of NEC and Alcatel. Also monitor all problems.
* Also perform PM (Preventive Maintenance) of the sites.
* Managed the store, spare parts and tools required during field work.
* Currently handled (Mobilink) South Region sites including BSC.
* Microwave Loop shifting, loop testing and site shifting activities.
* To Handle Alarms (Before handover) in Adjustable Short time.
* To get the site work done according to Customer specification.
* Power Section, Battery bank and cabling, GSM antenna and Microwave installation.
* RF cable with VSWR Measurement. Fully Operate Site Master to Remove VSWR.
* Complete Installation and Operation of the Software (B9, B10, B11 (single, Twin Trx), Alcatel 1320CT, and (PNMT).
* Having Sound Knowledge about Telecommunication Equipments.
POWER:
* Any fault whether related to electrical or mechanical are under BSS engineer.
* Fault related to External Alarm (fire, rectifiers, intruder, Temperature, Genset).
* Fully responsible in maintenance of air-conditioning of sites using LG, Mitsubishi and Sabro AC`s.
RADIO TOOLS:
* BTS-Terminal Release B9, B10, BTS11 (Single TRE, Twin TRE, Combiner, and SUMA Offline), Alcatel 1320CT.
* PNMT (Paso link Network Management Terminal) of NEC, and NEO).
* Off Line Commissioning.
* Remove VSWR Through Site Master.
I worked as a Telecom Engineer my responsibilities are to Lead the team which is engages on PMCL MW Project. Hands-on Experience of NEC links installation, commissioning & Troubleshooting.
MW Transmission Engineer PMCL Project:
Installed complete Microwave sites Hands-on experience of Installation, commissioning, and Acceptance Testing of NEC equipments.
Achievements:
• Lead the Team on PMCL project.
• Over 38 NEC Microwave links with different Protections installed successfully.
• Hand-on experience installation of NEC NEO & Pasolink Microwaves links worked on PDH, SDH, and Xpic links.
Dismantling of NEC Links @ PMCL Project:
Hands-on experience of dismantling of NEC equipments and replacing it with NEO.
Achievements:
• Lead the Team on PMCL project
• Over 38 NEC Microwave links dismantled successfully.
• Hand-on experience of dismantling of space diversity links.
• Replacing of NEC system with NEO.
I worked as a Telecom Engineer my responsibilities are to Lead the team which is engages on PMCL BTS Project. Hands-on Experience of Alcatel BTS installation, commissioning & Troubleshooting.
BSS Engineer PMCL Deployment Project:
Installed complete BTS sites Hands-on experience of Installation, commissioning, and Acceptance Testing of BTS equipments.
Achievements:
*Lead the Team on PMCL project.
*Over 50+ Alcatel new Roll out Sites installed successfully.
*Hand-on experience installation of Alcatel BTS Equipment Such as TRX, Combiners, Suma Card.
RADIO TOOLS:
*BTS-Terminal Release B9, B10, BTS11 (Single TRE, Twin TRE, Combiner, and SUMA Offline).
*PNMT (Paso link Network Management Terminal) of NEC, and NEO).
*LMT Software
*Off Line Commissioning.
*Remove VSWR Through Site Master.