Mahmoud Otoom, Projects Manager

Mahmoud Otoom

Projects Manager

First Link For Communication

Location
Jordan - Amman
Education
Bachelor's degree, Telecommunication & Software Engineering
Experience
5 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 6 Months

Projects Manager at First Link For Communication
  • Jordan - Amman
  • September 2015 to August 2016

▪Impact analysis of pre- and post- implementation of maintenance window activities to detect any conflict/overlap and interference of activities scheduled during the same time.
▪Take care of Key account business customers by issuing the contracted Notifications with its related Reporting.
▪Liaise with internal colleagues and vendors to identify changes faults and escalate them appropriately to ensure the issue solving.
▪Interface O&M all work related to internal audits to be resolved in coordination with all stakeholders.
▪Increasing Company profits in range 25% using some risk management tools.

Projects Coordinator & Operations Team Leader at Firstlink For Communication
  • Jordan - Amman
  • April 2015 to August 2015

▪Assisting and supporting the PM in their daily duties.
▪Ensuring that relevant management information is captured and analyzed.
▪Providing project support to vendor IM’s & CEG.
▪Reviewing the efficiency and effectiveness of delivery service.
▪Responsible for handling the projects finances.
▪Acting as administrative support to PM & GM.
▪Identify, Analyze, Prioritize, Mitigate & communicate project risks.
▪Communicate with PM & GM to report on project status.
▪Involved in coordination projects from inception to completion.
▪Developing training and briefing material for staff.
▪Leading and organizing the teams.
▪Involved in interpreting performance data and translate this into practical improvements.

Transmission Team Leader at Firstlink For Communications
  • Libya - Tripoli
  • April 2014 to March 2015

▪Telecom project management & coordination (New site installation, Optimization,
Supervision, Testing, Configurations, Maintenance, Acceptance & Clearance).
▪Lead a transmission team to installation, commissioning & aligment a large MW dishes (1.8M - 3M) NEC DMR 5000s backbone with high quality.
▪Lead a transmission team to installation new backup AC system for MW.
▪Lead a transmission team to installation Dehydrator Materials to suction the air in wave-guide to reach less VSWR value.
▪Commissioning Metro 1000 using I Manager U 2000 tools.
▪Commissioning DMR 5000s using PNMT & offline tools.
▪Using SDH Analyzer to verify optical power level at RX side, Veryify QOS, Verify network backup, Verify network elemnt setup & Monitoring alarms/errors.
▪Using Fiber Meter to measurement optical on fiber optics cables.

BSS Engineer at ZTE
  • Jordan - Amman
  • October 2013 to April 2014

▪Installation, Commissioning and Troubleshooting of ZTE SDR BTS8700, BTS8800, BTS8900.
▪Installation & Commissioning of RRU single band sector & dual band sector R8881, R8882).
▪Pre swap & post swap alarm testing using ZTE EOMS Tool & solve the alarms.
▪Handling DTRU addition, deletion, shuffling and resource shuffling in BSCs.
▪Various troubleshooting in configuration and hardware of BSCs and the BTS sites.
▪Provide technical support for Umniah Mobile Company & contractors companies.
▪Assign from Umniah side as node sites supervisor.
▪Looking after all the Service affecting faults such as TRX fault, VSWR, Handover drop etc.
▪Up gradation of BTS sites for better network performance.
▪Coordinating with the field technicians, Engineers and Installation teams to resolve any network degrading faults generated at BSC, Node-B sites.
▪Experienced in implementation of PDH and SDH (STM1, STM4 and STM16) loop protection and testing.
▪Performance monitoring and Testing of E1s using BER meter.

Telecom & Power Implementation Engineer at UMNIAH Mobile Company
  • Jordan - Amman
  • August 2011 to August 2013

▪Telecom & power project management & coordination (New site installation, Optimization, Supervision, Testing, Configurations, Maintenance, Acceptance & Clearance).
▪Conduct site survey and prepare technical site survey reports such as LOS survey & survey for Frequency.
▪Make a test for signal before and after new sites installation such as signal (strength, Quality & interference) and making the required adjustments.
▪Installation, commission, troubleshooting, and maintenance of various communication equipment such as UHF Equipment, BSC Equipment (Huawei BSC6900 series), BTS Equipment (Huawei BTS3900 series, Huawei BTS3012) & (ZTE 8700, 8900).
▪Perform VSWR and DTF on feeders and antenna system using site Master & analyzer.
▪New MW‐Links (RTN series & NEC) installation, commission, alignment, integration & cascading.
▪Designing, Installation, Troubleshooting & Maintenance of IBS, Microcell sites until site on‐air.
▪Installation urgent mobile car sites on record time.
▪Installation, troubleshooting, and maintenance solar system, wind system & DC‐ systems.
▪Wi‐max D & E version equipment’s installation.

Transmission data & Switching Trainee Engineer at Orange
  • Jordan - Amman
  • January 2011 to June 2011

I trained under the supervision of engineers in the
field of switchboards and data transmission.

Education

Bachelor's degree, Telecommunication & Software Engineering
  • at Al-Balqa' Applied University
  • August 2011

Languages

Arabic
Expert
English
Expert

Memberships

JEA
  • Telecommunication & Electronics Engineer
  • August 2011

Training and Certifications

Matlab (Certificate)
Date Attended:
July 2007
Wimax (Training)
Training Institute:
Huawei
Date Attended:
May 2013
LTE Wireless (Certificate)
Date Attended:
December 2014
IP Microwave (Training)
Training Institute:
ZTE
Date Attended:
December 2013
XPIC Microwave (Training)
Training Institute:
Huawei
Date Attended:
November 2014
NEC DMR 5000s (Training)
Training Institute:
Huawei
Date Attended:
April 2014
LTE Wireless (Training)
Training Institute:
Huawei
Date Attended:
November 2014