(Project no.1): Al-Inmaa Head-Quarter Bank.
Location: Riyadh - Saudi Arabia (340 million SR).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection, Lighting,
all Low Current System, BMS &Power systems for Tower consist of (40 Stories), Basement consist
of (7 stories), Data center consist of (4 stories) and Amenity consist of (1 story).
(Project no.2): Beach House (Mohamed Bin Zaid Palace) Phase2.
Location: New Alamein - Egypt (430 million EGP).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection, Lighting,
all Low Current System, BMS &Power systems for (3 Villas), (3 Electrical substation), (Kitchen), (2
Guest House), (Helipad), (Pump station for Domestic and Ro System) and (Dry & wet Infra structure
Networks)
(Project no.1): Queisna for Agriculture Development HQ-Building.
Location: New Cairo - Egypt (60 million EGP).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection, Lighting,
all Low Current System, BMS &Power systems for Building consist of (6 Stories) and Basement (2
Stories).
(Project no.2): Zaha Park Mall (Home Town Development).
Location: New Cairo - Egypt (97 million EGP).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection, Lighting,
all Low Current System, BMS &Power systems for Building consist of (9 Stories) and Basement (2
Stories)
(Project): Cairo Festival City (AL-Futtaim) - Office Buildings (12B02 and 12B03).
Location: New Cairo - Egypt (240 million EGP).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection, Lighting,
all Low Current System, BMS &Power systems for Two Buildings Each One Consist of (6 Stories) &
Basement (2 Stories) and Landscape.
(Project): City Centre Al-MAZA Mall (Majid El-Futtaim).
Location: Cairo - Egypt (one billion EGP).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection,
Lighting, all Low Current System, BMS &Power systems For Building (4 Stories) Built-up area for
each floor 120, 000 m²
(Project no.1): New Building for Civil Services Ministry.
(Project no.2): Faculty of Education & Faculty of Medical Sciences (Salman bin
Abd El-Aziz University).
Scope of Work: Supply & installation of the HVAC, Fire Fighting, plumbing, Fire Detection,
Lighting, all Low Current System, BMS &Power systems.
(Project): St. Regis Nile Corniche Hotel -Qatari Diar.
Scope of Work: Capacity 4, 000 Refrigerant Ton. L.E. 780 million (US$ 130Million) Situated off the
Nile River in Cairo, Egypt. Total Built up Area 232, 257 m²; has Cooling the building
(Project no.1): AMN El DAWLA Building at 6 October city.
(Project no.2): Dar El-SALAM Hospital at Maadi.
(Project no.3): Capital Business Park (Dorra Group) at 6 October city.
Scope of Work: Fire Fighting Water & Gas System.
Master Of Business Administration
Ain Shams University - Faculty of Engineering B.Sc. in Mechanical Engineering department.
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.