  • My current job since July 2013

Project : Al Amal Psychiatric Hospital, Dubai
Title : Sr. Project Resident Engineer
Project description :

Al Amal Psychiatric Hospital, Dubai, UAE
Valued at AED 420 million

Al Amal Psychiatric Hospital, commissioned by MPOW (Ministry Of Public Works ), is a specialized Psychiatric Hospital with advanced treatment.
The project developed by HDP ( Overseas ), comprises 54, 000 m2 on two floors .
The whole facility provides accommodation for 274 beds with Treatment, outpatient, emergency, and consultation facilities, The project consists of 8 blocks for the Main Building, Half way patient, Central plant, Substation, Maintenance workshop, STP . The provision also includes dining and conference facilities, laboratories, imaging with soft and hard landscaping with total Project area of 108, 633 m2.
The project is established from outset on sustainable principles with aim to achieve Healthcare ‘Silver’ accreditation .The sustainable approach is manifest primarily in the engineering systems.

Job Profile :
Includes but not limited to :
• Site management and supervision duties.
• Managing the necessary coordination between the issued For Construction Drawing (IFC), Medical Equipment and F.F & E (loose and fixed furniture).
• Reviewing and monitoring project schedule and procurement.
• Assessment of the Contractor’s Monthly payment application.
• Technical assessment of the Contractor’s Variation.
• Monitoring Shop Drawing activities, amendments on project.
• Managing all the meetings, correspondence, submittals with the main Contractor and the Client.
• Communicate with the Client for issuing the necessary site instruction for the project. Monthly reporting for the client indicating the progress on site, discuss & solve any problematic issues on site.
• Managing with Home support from Head office regarding any design / Operators changes.
• Managing a staff of 10 persons (Engineers and Inspectors) which are reviewing Program, all material submittals, shop drawing submittals, Technical submittals, RFI’s and site inspection for all activities on site.
• Following up HDP’s monthly payment with the Client.

Sr. Project Manager/ Sr. Project Resident Engineer at HDP Overseas Ltd
  • United Arab Emirates - Abu Dhabi
  • My current job since July 2014

Title : National Rehabilitation Centre, Al Mafraq, Abu Dhabi
Worth : AED 285 Million
Brief : NRC, commissioned by Musanada, is a specialized Rehabilitation Centre with advanced treatment. The project developed by HDP (Overseas), comprises 38, 000 m2 built up area. The project consists of 7 blocks with total Project area of 108, 717 m2. The project is established from outset on sustainable principles with aim to achieve Estidama 2 Pearl accreditation .The sustainable approach is manifest primarily in the Design and Engineering systems.

Snr. Resident Engineer at WS Atkins
  • United Arab Emirates - Dubai
  • September 2017 to March 2018

Bluewaters Development Hospitality, Dubai
Project Brief: The Bluewaters Development include entertainment hospitality, residential and retail zones, and is forecast to attract more than 3 million visitors annually. The main attraction of the island will feature Dubai Eye, a 228 - metre tall giant Ferris wheel
Bluewaters- Hospitality
Project Brief: The Mixed-use development which include a178 Key five-star Luxury Hotel, 301 Key entry level five-star family Hotel, focused around lifestyle and contemporary style, two Serviced Apartments Building (SA! & SA2), beach front residential apartments, Resident Beach Clubs, Conference Centre, bespoke souk encircled by promenade that boast dining, mix of retail stores and Structured Parking for above facilities

Sr. Project Manager at HDP Overseas Ltd
  • United Arab Emirates - Abu Dhabi
  • August 2008 to June 2013

Project :

August 2008 - June 2013, Abu Dhabi, UAE

 Arzanah Medical Complex, Abu Dhabi - UAE
 Prepared the RFP for H.H.Shaikh Khalifa bin Zayed Al Nahyan Hospital in Islamabad Pakistan; HDP acting as Project Management.

Project description :

 AMC; Arzanah Medical Complex, Abu Dhabi - UAE
Valued at AED 700 million.

Title : Sr. Project Manager

The Arzanah Medical Complex, Commissioned by Mubadala Healthcare, is a Specialist Sports Medicine Hospital and Clinic situated within Zayed Sports City in Abu Dhabi.
The project developed by HDP (Overseas) together with HDR International of San Francisco, comprises 35, 600 m2 on six levels - four floors above ground plus a plant room level in two buildings, Hospital and Clinic. Two basement levels - with further 17, 700 m2 of underground parking.

The whole facility provides accommodation for three distinct operators, for spinal, knee and sports Medicine and clinic operator for dental, GP, Pediatrics, dermatology, endoscopy, pain management and women’s aesthetics clinics. It includes three wards with 78 beds and six operating theaters with a 3 bed surgery step- down department. The provision also includes dining and conference facilities, inpatient and outpatient pharmacies, laboratories, imaging and a rehabilitation centre.

The project is established from outset on sustainable principles with aim to achieve ‘Silver’ accreditation .The sustainable approach is manifest primarily in the engineering systems. The Project already certified ‘Gold’ accreditation, resulted on strict controls and supervision during the current contract stage.

Job Profile :

• Site management and supervision duties.
• Managing the necessary coordination between the issued For Construction Drawing (IFC), Medical Equipment and F.F & E (loose and fixed furniture).
• Reviewing and monitoring project schedule and procurement.
• Assessment of the Contractor’s Monthly payment application.
• Technical assessment of the Contractor’s Variation.
• Monitoring Shop Drawing activities, amendments on project.
• Managing all the meetings, correspondence, submittals with the main Contractor, the PM and the Client.
• Communicate with the PM, for issuing the necessary site instruction for the project. Weekly reporting for the client indicating the progress on site, discuss & solve any problematic issues on site.
• Managing with Home support from Head office regarding any design / Operators changes.
• Managing a staff of 17 persons (Engineers and Inspectors) which are reviewing all material submittals, shop drawing submittals, Technical submittals, RFI’s and site inspection for all activities on site.
• Monitoring Testing and commissioning procedures, Room Data Sheet, O& M Manuals and close out procedures.
• Following up HDP’s monthly payment with PM / Client.

Sr. Project Manger at Projacs International / Asco Consulting Engineering
  • Qatar - Doha
  • October 2007 to August 2008

General Project Manager -
Projacs International / Asco Consulting Engineering

October 2007 to 2008

Projects:

 Sports City Project, Doha - Qatar

All projects in the sports city premises which mainly consists of:

 Khalifa Stadium
 Aquatic Center
 Women’s Club
 Aspire Academy
 Aspire Dome
 Aspire; Orthopedic Sports Medicine Hospital
 Super Club
 Mosque
 Stadium Gazette Printing Press
 Press Centre
 All Soft and land-escaping within the premises
 Leisure land

 Al Sadd Stadium, Doha - Qatar

Job Profile:

• In addition to the same responsibility and Job profile above, Managing and coordinating with concern Contractors
For Pre and Post project Completion.

Sr. Project Manger at Projacs Internatonal / Asco Consulting Engineering
  • Qatar - Doha
  • June 2004 to September 2007

Project Manager -
Projacs International / Asco Consulting Engineering
June 2004 - September 2007

Projects:

The Following projects have been executed simultaneously.

 Aspire; Orthopedic Sports Medicine Hospital Sports City Doha - Qatar
 Ceremonies Compounds for DAGOC (Doha Asian Games Organizing Committee)
 Stadium Gazette Printing Press
 Hard landscaping around Sport city

Project description :

 Orthopedic Sports Medicine Hospital Sports City
“ Aspetar “, Doha - Qatar
Valued at QR 320 million

• ‘Aspetar’ is a specialist Sports medicine Hospital and Clinic situated within the sports city (Aspire Zone) in Doha.
• Aspetar is the first specialized Orthopedic and Sports Medicine Hospital in the Gulf region. It provides the highest possible medical treatment for sports-related injuries in a state-of-the-art facility.
• It has an approx. a plot area of 27, 174.03 Sq.m with a total constructed area of 6007 Sq.m and total built up area of 17, 753 Sq.m plus additional Normobaric chambers with an area of 1369 Sq.m and a future extending of another floor of normobaric chambers with an area of the same, 1369 Sq.m.
• The present capacity for the hospitals is 75 rooms with a future extension of 25 rooms.
• The Hospital accommodates Imaging, Bio-med,
Hydro/Tallaso, Sports Hall, Admin., Indoor
Sports Hall, Examination rooms, Auditorium, Medical library, Normobaric (25 rooms), Laboratory,
Pharmacy, 4 Nos. OT, s, ICU (6 Nos.), Patient
Rooms & VIP patient rooms.
The facility also includes Kitchen ), Dinning, Jacuzzi, Souna, Steam, Sports perform & Exchange rooms, Terrace (Exterior), Swimming Pool (Exterior) and exterior Hydrotherapy pool with a floating deck.


Job Profile:

• Direct reporting to the ‘Client’.
• Site management and supervision duties.
• Managing the necessary coordination between the issued For Construction Drawing (IFC), Medical Equipment and F.F&E (loose and fixed furniture).
• Reviewing and monitoring project schedule and procurement.
• Assisting “Client” head office of the Contractor’s Monthly payment application.
• Assisting “Client” head office on the Technical assessment of the Contractor’s Variation.
• Monitoring Shop Drawing activities, amendments on project.
• Managing all the meetings, correspondence, submittals with the main Contractor and the Client.
• Communicate with the Client for issuing the necessary site instruction for the project. Daily reporting for the client indicating the progress on site discuss & solve any problematic issues on site.
• Managing with the Client and Head office of the Sport City regarding any design / Operators changes. Conduct all the meetings with the designers (M/s. Ellerbe Backet - USA, sub-designer M/s. QDC & M/s. Atelier Kafrawi) to clarify any design conflict.
• Handling the necessary coordination with QOSMC Qatar Orthopedic and Sports Hospital) for reviewing all the drawings and the medical equipments and updating all the information required to achieve the up-to-date technology for all equipments.
• Managing a staff of 12 persons (Engineers and Inspectors) which are reviewing all material submittals, shop drawing submittals, Technical submittals, RFI’s and site inspection .
• Monitoring/Approving Testing and commissioning procedures, Room Data Sheet, O& M Manuals and close out procedures.
• Sign Off the Close up report.

 Ceremonies Compounds for DAGOC (Doha Asian Games Organizing Committee)

• Total construction cost QR. 60 million
• The 2 no. projects are located within the Sports City Project to the North side of Khalifa Stadium.
• It consists of 4 packages which were ongoing in parallel.

 Stadium Gazette Printing Press
• Total construction cost QR 12 million
• Consists of Steel structure, Structural, Civil and MEP works.

 Hard landscaping around Sport city.
• Total Construction cost QR 27 million
• Road works, Inter-locking, Civil works. Etc

Director at private business
  • Egypt - Cairo
  • June 2002 to May 2004

Projects:

 El Sheruk 2000- Hassan Dura Co.
 El Bustan: 6th of October city, modern projects Co.
 Stella De Mare - El Sokhna - Ayoub Adley Ayoub Co.
 In addition to many private villas.

Scope of works :

Executing and coordinating civil, finishing, MEP works
including infrastructure works.

projects Coordinator at alico Egypt
  • Egypt - Cairo
  • February 2002 to June 2002

Project Coordinator - Alico Egypt Co.
February 2002 - June 2002

Projects:

 Cairo airport Transit Hall
 Arab academy for eng. & tech. Cairo

Job Profile:

• Acting as a Projects Coordinator for the aluminum works
(i.e. .Curtain walls, windows, doors, frame-less glass, wall cladding etc.).

Scope of works:

Includes coordinating between production (factory) and sites, revision for drawings, executing and hand-over to the consultant.

Project Manager at Dorcas Development Co.
  • Egypt
  • May 2001 to September 2001

Projects:

 Shat El Nakhil, El Sokhna ( Tourist Resort )- Egypt
Reporting directly to the Client

Job Profile:

• Acting as a Project Manager for ALL activities on Site including the Civil, structural works, Finishing and MEP. All site infrastructure with all the corresponding design data required, reviewing and recommending materials and finishes.
• Issuing the monthly invoice for the Contractors.
• Handling all the commissioning works with the Owners.

Project Manager at Egybel International
  • Egypt - Cairo
  • September 1999 to April 2001

Project Manager - Egybel International- Cairo

September 1999 - April 2001

Projects:

 Marriot Mirrage - Cairo
 Golden Pyramids Plaza - Cairo

Job Profile:

• Acting as a projects coordinator for the aluminum works: Curtain walls, windows, doors, frame-less glass, wall cladding etc.

Scope of Works:

Includes time scheduling for the projects, Coordinating between production (factory) and sites, revision for drawings, executing and hand-over to the consultant.

Sr. Architect , Site Supervision at Katameya for real Estate Investment Co.
  • Egypt - Cairo
  • July 1996 to September 1999

Katameya for Real Estate Investment Co.

July 1996 - September 1999

Projects:

 Katameya heights ( Golf & villas )

Job Profile:

• Manager for the entire finishing works for : Club House,
Villas (400 villa), Utilities buildings, infrastructure (for some areas), soft and hard landscaping.

Scope of Works:

Scope of works includes time scheduling for each project, reviewing all the design drawings, approvals for materials, coordinating between all trades (Finishing, MEP, Infrastructure etc.. ), monitoring and controlling all site activities and handing over to the clients / owners .

Sr. Site Architect at Soares Da Costa International, Portuguese Company
  • Egypt - Cairo
  • July 1992 to June 1996

Projects:

 Palmariva Sphinx Hotel( Sofitell ) -Cairo, Egypt
 Luxor holiday hotel ( Sofitell ) - Luxor, Egypt

Job Profile:

• In-charge of all interior and exterior works for the guest rooms and a part of the public area, supervising more than (200) men working around the clock to achieve the time completion date .

Scope of Work:

Reviewing all shop drawing and design drawing, Executing and coordinating all the running activities starting from concrete and ending with finishing, Coordinating with MEP Subs. Scope of works also includes attending meetings and handing over works to the Engineer.

Technical Office Manager at Joe -D International
  • Egypt - Cairo
  • March 1988 to July 1992

Projects:

 Tendering & Pricing for several projects

Job Profile:

• In-charge for all the technical office activities: Tendering, Pricing, Scheduling, Designs for banks, schools and monitoring the sites to achieve the targets for cost and time schedule.
• Conduct meetings with all contracts to facilitate and clarify all drawings and specifications.
• Monitoring the time schedule for all projects to ensure the time completion date for each project.

Sr. project Architect at Arab Sunley
  • Egypt - Luxor
  • July 1987 to January 1988

Projects:

 Hilton Luxor Hotel - Luxor

Job Profile:

 In-charge of all interior finished and exterior works including hard landscaping

Project Manager at Misr for trading & Enineering Co.
  • Egypt - Cairo
  • February 1985 to June 1987

Projects:

 Bank of Alex. Ghamra Branch- Cairo
 Bank of Alex. Roxy Branch- Cairo
 Bank Misr : Roxy Branch- Cairo
 General Information Authority - Cairo
 Interior Perspective Project For Kasphareet Hanger - Egypt air

Job Profile:

 Acting as a project manager for the finishing works, MEP works with all the corresponding design data required.

Director at Private Business
  • Egypt - Cairo
  • April 1983 to January 1985

+ Ramo co. Tower 17 Floor :Interior finishing
+ Many private villas, Turnkey Jobs

Project Manager at Top Mobil
  • Egypt - Cairo
  • October 1982 to March 1983

Small project Value:
IDP project - zamalek - Cairo- Egypt

Job Profile:

 Acting as a project manager for the Civil works, Finishing, Electrical, Plumbing, HVAC, Fire Fighting, telecommunications with all the corresponding design data required.

Director at Private business
  • Egypt - Cairo
  • October 1980 to January 1982

 +Ayoub Adley Ayoub Tower 10 floors: Interior Finishing
 +Arab contracting Co. 8 Floors buildings: Interior finishing
 +Many private villas, Turn Key Jobs

Scope of Work:

Executing finishing, MEP and interiors .

Site Junior Engineer. at Mobag - Ayoub International
  • Egypt - Cairo
  • October 1979 to September 1980

Projects:

 Ramses Hilton Hotel 35 floor Cairo

Job Profile:

 Site engineer for a part of the plaster, Gypsum-board activities; Scope of works includes Executing and coordinating finishing, electrical, plumbing works related to the above responsibility including inspection for all works with the consultant Engineers

Education

Master's degree, MBA
  • at Brooksville university, USA, On line
  • September 2011

Master in Project Management

Bachelor's degree, Degree of consulting architect from Engineering Syndicate January .1999 in the field of : Supervisin
  • at Bachelor degree in Architectural Engineering (June 1979) - Ain Shams university, Egypt
  • June 1979

++Pricing, Scheduling and tendering course attending El-Omma Center. ++Degree of consulting architect from Engineering Syndicate January .1999 in the field of : Supervising Arch. Projects , Construction ++Attended certificate for PMP on Sep. 2012, Abu Dhabi, UAE

Specialties & Skills

Consulting Engineering
Project Management
Project Engineering

Languages

English
Expert

Memberships

Engineers Syndicate, Cairo – Egypt
  • Architect
  • June 1979

Training and Certifications

yes (Certificate)
Date Attended:
February 1982
Valid Until:
March 1982