Quantity Surveyor في Terrazzo Dubai Co LLC
  • الإمارات العربية المتحدة - دبي
  • مارس 2015 إلى أبريل 2016

Perform the commercial activities(viz. contractual documentation and writing)
Preparation and tracking of various submittals.
Preparation of progress billing.
Check Bill of quantities (BOQs) against the drawings to raise claims and assist the Project manager (PM) with cost monitoring and controlling.
Assist in collecting and processing of additional orders from suppliers for the active projects.
Ensure compliance with the commercial framework.
Capability to carry out QS function, BOQ preparation, management and measurement activities etc.
Stakeholders Management.

Quantity Surveyor في L &T Construction ECC div. Ltd
  • الهند - مومباي
  • أبريل 2011 إلى فبراير 2015

Managing costs on a wide variety of new building projects and structures, such as residential developments, sports stadiums, roads and bridges, schools, hospitals, offices.
undertaking costs analysis for repair and maintenance project work.
Assisting in establishing a client’s requirements and undertaking feasibility studies.
performing risk and value management and cost control.
Advising on procurement strategy.
preparing tender and contract documents, including bills of quantities.
Preparing Cash flow (micro level) wkly, monthly, quarterly, halfyearly, yearly for management.
identifying, analysing and developing responses to commercial risks.
preparing and analysing costings for tender.
providing advice on contractual claims.
Analysing outcomes and writing detailed progress reports.
valuing completed work and arranging payments.
preparing professional cost estimates.
Builds data bases of suppliers, material prices and cost information for the construction projects.

Planning & Billing Engineer في Shapoorji&Pallonji (I) Ltd
  • الهند - ناجبور
  • مايو 2010 إلى مارس 2011

Preparing BL Programs at Tendering stage, Pre- construction stage & Post Construction stage, and submitting same to Consulatnt /Engineers for discussion & approval.
Co-ordination with engineering and procurement sections regarding the interface of construction activities material and equipment delivery.
Regular visits to project sites Building, Roads, services, Landscaping etc. to validate whether the progress of work on site is in compliance with approved schedules, major milestones have been met and report deficiencies to construction manager .
Reviewing all daily, weekly and monthly report and also reviewing sub contractor report, in case of any deficiency or non-compliance discussing with Project Manager.
Reviewing EOT& Claim involving time impact and reporting its assessment to construction manager.
Verified bills for main and other contractors and arrange payment certificates in ERP /SAP.
Checked the bill of quantities which were claimed by the contractor in running bills with Actual / GFC drawings in accordance to IS-1200/SP27-mode of measurements
Evaluated all the necessary supporting documents submitted along with the abstract of the monthly bill
Reviewed and prepared reconciliation statements for RMC, steel and other client supply materials which included free issue materials, pour cards for concrete, test reports of materials and comparison statements for value of work (Actual/WO values)
Inspected the specification compliance checklists and work quality checklists
Conducted rate analysis which included calculating / finalizing price for main contractor variations or non-tender items as per the work order conditions
Released the Payment Certificate as per the work order terms.

Under Graduate Engineering Trainee في Shapoorji&Pallonji (I) Ltd
  • الهند - ناجبور
  • مايو 2006 إلى مارس 2009

Monitored the overall execution of work from initial stage of project that was from excavation, marking of footings, construction of framed structure to the final stage that included finishing works such as Masonry, waterproofing, Plastering, flooring, Painting and interior works.
Directed the team as per GFC drawings for marking.
Conducted bar bending schedule preparation.
Prepared sub-contractor bills every fortnight and monthly main contractor bill along with checklists as per the specification for every activity.
Supervised the quality of work that was offered before, in process and after the completion
Performed activities like checking the quality of materials, conducting various tests in co-ordination with the quality control department and so on.

الخلفية التعليمية

دبلوم عالي, PGDBA -Opr & CRM
  • في Symbiosis
  • ديسمبر 2012

PGDBA in Operations & CRM

بكالوريوس, B.Tech Civil
  • في Nagpur University
  • مايو 2010

(B.Tech - Civil, PGDBA – Operations & CRM)

Specialties & Skills

Budget Setting
Costing
Primavera P6
Primavera
FIDIC,NRM1-2-3
AUTOCAD
BILLING
CASH FLOW
CONSULTING
COST CONTROL

اللغات

الانجليزية
متمرّس
الهندية
متمرّس

التدريب و الشهادات

Seminar on Material selection for new construction Under Green Building Standard. - LEED (تدريب)
معهد التدريب:
3 Fold Centre
تاريخ الدورة:
March 2016
المدة:
8 ساعات
Dispute resolution under FIDIC Condition of contract. (تدريب)
معهد التدريب:
3 Fold Centre
تاريخ الدورة:
February 2016
المدة:
8 ساعات

الهوايات

  • Football
    State level Played