Planning & Design Engineer
WiConnect
Total years of experience :12 years, 9 Months
STC project _PtMP "Wireless Access Design"
- Network Design Engineer " HUB's, CPE " .
- Preliminary design of the RF elements of a microwave communications system,
routeing and path analysis based on diverse maps/terrain databases,
link capacity optimisation,
- Radio path calculations (path loss 5, LCT "CBNL tools ", CONNECT, map info )antenna sizing and centerline optimization, RSL design.
.
Nokia-(Senior Transport& Transmission performance Engineer) STC Account Feb 2020~ present
Leading the Transport Performance & Microwave team technically to achieve the target.
Managing the day-to-day activities of the team.
Delegating tasks to team members.
Manage and Control Quality performance.
Manage Customer Relationship Management (CRM).
Manage Change Management activity on the networks in real time to ensure all activities comply according to process.
Escalate complex problems to the relevant person to ensure case/issue is closed efficiently and in a timely manner.
Dealing with Key Performance Indicators (KPI) and Service level agreement (SLA) in order to improve the network.
Solve all technical issues related to project.
Capture & detects technical issues impacting Performance through Variations in the Normal trends.
End to End solving & improving Network (WAN/LAN) utilization & congestion issues.
Reporting daily, weekly, monthly and quarterly with analyzing data graphically to ensure best performance.
Nokia -(Senior Microwave Transmission Design), STC Account April 2019 - Feb 2020.
Transmission Network Design & Frequency Planning for projects 4G, 5G, Mobile Aspiration, and WBB.
Upgrading the TDM transmission network to Full IP network.
Design and planning TD using many systems such as TRENDS, Aircom (Connect), Path loss, JISOW, SAF and Google earth.
Analyse the Space Diversity SD for difficult links in Path Loss software and determine the best antenna highest which reduce
the errors & increase the availability.
Plan and Design E-band, SD, XPIC (8+0), XPIC (4+0), XPIC (2+0) links and Carrier Aggregation.
Solving all types of hardware troubleshooting, plus fading and ducting due to high humidity and weather problems in the
coastal areas.
Creating Network IP Subnet Data Connection Network (DCN design) in order to be Links visible through STC server.
Lead the migration process (backhaul migration) of MBHs to new PRE-AGGs/DWDM.
Assign LOS survey to subcontractor to provide us LOS and Path loss reports and follow them to receive reports.
Plan Active / Passive Repeaters for LOS issue sites.
Creating TCC for Microwave sites.
Network troubleshooting (Interference issue) .
- Overseeing the installation, integration and commissions of PTP. PMP, MW, BS and CPEs together with Cambridge broadband wireless hardware.
- Design microwave link by using PATH LOSS 4.0.
- Made full Installation for VSAT I DIRECT equipment.
- Generate documentation required for system design.
mobily - alcatel project : Made full Insta llation for MPT, MPR, AWY, LUX50 andtroubleshooting,
- Make commissioning for the previous mentioned equipment
- Make Supervision for the links
- Good experience in MDT Actions
- Experience in ALU materials
STC - NSN (AL-HAJJ ) project
- Made full Installation MW link for FP and troubleshooting,
- Make commissioning for the previous mentioned equipment.
- Made full Installation node B 3G and troubleshooting,