مجموع سنوات الخبرة: 19 سنوات, 11 أشهر
يناير 2016
إلى حتى الآن
Senior Technical Office
في United Engineering for Construction Co. (UECC)
Residential Project)
Tasks-
* Manage Client Invoices.
* Manage Subcontractors Invoices.
* Prepare Material Escalation.
* Prepare Variation orders with breakdown as well.
* Prepare as built Drawing Shop Drawing & Quantity Survey.
* Submit monthly cost-forecasting reports to Project Manager.
Tasks-
* Manage Client Invoices.
* Manage Subcontractors Invoices.
* Prepare Material Escalation.
* Prepare Variation orders with breakdown as well.
* Prepare as built Drawing Shop Drawing & Quantity Survey.
* Submit monthly cost-forecasting reports to Project Manager.
فبراير 2010
إلى فبراير 2011
Site Engineer
في Electrical Power stations)
for Contracting
أكتوبر 2008
إلى يناير 2010
في SIEMENS).
for Contracting
يوليو 2007
إلى أغسطس 2008
Site Engineer
في Infra-structure project) Asalt Almadin
Project 1:- implementation of infrastructure works full of sewage (main lines)
device Level, is a major water lines, telephone lines and electricity, curbstone
and sidewalks, backfilling and compaction of layers of roads and pavement.
Gamal El Borg
device Level, is a major water lines, telephone lines and electricity, curbstone
and sidewalks, backfilling and compaction of layers of roads and pavement.
Gamal El Borg
أبريل 2006
إلى مايو 2007
Project 1:- implementation of residential buildings consisting of four floors,
concrete structure construction work and the work of finishing turnkey
concrete structure construction work and the work of finishing turnkey
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني