Senior Mechanical Engineer
Saudi Tech Engineering Consultancy.
Total years of experience :13 years, 7 Months
. Supervising the implementation of mechanical works inside Neom Palace.
.Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials
Supervising the implementation of mechanical works for a swimming pool inside the sea (the pumps room and its contents - air conditioning and ventilation for the pumps room - fire works inside the pumps room).
.Supervising projects of the Ministry of Water.
.Supervising the implementation of water projects for the governorates of the Makkah Al Mukarramah region (Al-Mudhaylif - Al-Ardiyat Al-Shamaliah - Adham - Al-Qunfudah - Turbat Al-Baqum - Al-Kamel - Al-Sail Al-Kabeer in Taif - Al-Quoz). . Water network and home connections - transportation pipes lines from a strategic tank to an upper tank - valve rooms (control - air - washing) - ductile and polyethylene water lines . Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials
. Supervising development housing projects in Al-Bayda Center in Al-Bahra Governorate in Makkah region (water network - sewage network - transportation pipes lines - sewage lifting station - water purification station - water treatment plant) . Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, and other mechanical systems. . Approving materials and receiving approved materials . Evaluated the final products overall performance, reliability, and safety. . Reviewed technical drawings developed by CAD technicians and drafters.
. Supervising the implementation of a water network and a high tank with a capacity of 750 cubic meters in Turbat al-Baqum Governorate in Taif.
. Water network and home connections - transportation pipes lines from a strategic tank to an upper tank - valve rooms (control - air - washing) - ductile and polyethylene water lines - Implementation of fire hydrants. . Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials.
tanks to water tanks in Samta, Twal, and Al-Mwasam in the Jizan Area. . valve rooms (control - air - washing) - ductile water lines - Implementation of fire hydrants . Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials
. Supervising the projects of the implementation of sewage estuaries and lifting stations for the province of Sabia and Samta and housing displaced persons in Jizan area
Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials . Evaluated the final products overall performance, reliability, and safety. . Identified deficiencies in mechanical processes to develop improvements. .Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
. Supervising the project to establish passports for the Western Region in Shumais, Mecca Region, and supervising the King Abdullah Project for Umrah pilgrims and pilgrims - Makkah in Al-Muzdalifah . Design Review, Supervising the implementation of works HVAC, plumbing, firefighting systems, water supply, sewage, and other mechanical systems. . Approving materials and receiving approved materials
. Supervising the implementation of residential buildings and the maintenance and renovation of the university hospital . Design Review Supervising the implementation of works HVAC, plumbing, firefighting systems, and other mechanical systems.
. Responsible for implementation and installation of pipelines and daily, weekly, and monthly reports. . Communicated project requirements and areas for improvement in design review meetings. . Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines. . Drafted assemblies, models, and other technical drawings.