محمد مصطفى محروس, Project Manager

محمد مصطفى محروس

Project Manager

Al Abdulkarim Holding Company

Location
Saudi Arabia
Education
Bachelor's degree, Civil Engineering, (Construction & Building)
Experience
18 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 0 Months

Project Manager at Al Abdulkarim Holding Company
  • Saudi Arabia - Khobar
  • My current job since November 2021

Responsible for all Maintenance work & quality control in Company & Tower & showrooms and private properties
* Finishing works for a villa for the owner in Sunset Resort.
* Finishing works for Al-Azizia Showroom for Abdul Karim and Schneider company
* Finishing The Administrative Offices in The Tower.
job description / Responsibilities:
- Supervision all onsite finishing & quality control
-Follow up the project time schedule
- Monitor and direct all contractors in all activities on site.
- Review all project documents (BoQ - shop drawings - contractor's contract).
- Attending periodic meetings to discuss technical problems of the project and project progress.
- Preparing daily reports that show work progress.
BAYAN

Constructions Manager at BAYAN Realty Company
  • Saudi Arabia - Khobar
  • August 2016 to April 2021

Components of The Project:
- Project Cost One billion and 200 million riyals
- Consisting of 800 residential villas
- Residential studios
- Hyper Market
- 5 Mosques + 2 Schools
- Health center.
job describtion / Responsibilities :
- Supervision all onsite constructions to monitor compliance with building and safety regulations.
-Follow up the project time schedule
- Monitor and direct all contractors in all activities on site.
- Review all project documents (BoQ - shop drawings - contractor's contract - soil reports - concrete tests).
- Attending periodic meetings to discuss technical problems of the project and project progress.
- Preparing daily reports that show work progress and next day plan.
- Coordinating with the project manager.
- Sharing to preparation of the final quality file and graphics as built.

construction manager at Medad Project Management Co.
  • Saudi Arabia - Khobar
  • September 2014 to June 2016

Components of The Project :-
- Project Cost 120 million riyals ( phase 1 )
- Consisting of 156 residential villas
job describtion / Responsibilities :
- Responsible for all Constructions Works.
- Review all project documents (BoQ - shop drawings - contractor's contract - soil reports - concrete tests).
- Follow up the project schedule and match it with the implementation of the work on the site.
- Monitor & Guide Consultant and contractors in all activities in the Site..
- Make periodic meetings to discuss the technical problems of the project and the progress of theproject
- Preparing daily reports that show work progress and next day plan.
- Coordinating with the project manager.
- Sharing to preparation of the final quality file and graphics as built.

Site Manager at Al-Rashid Trading & Contacting Company Ltd
  • Saudi Arabia - Riyadh
  • July 2012 to August 2014

Site Manager & QC Engineer in project King Abdullah bin Abdul-Aziz to Develop the Security Headquarters of the Ministry of Interior Phase IV (KAP-4)
Owner : Ministry of INterior
Project location: Albrchaah Dammam Riyadh way


Components of the project:
- Project Cost 2 billion and 200 million riyals
- Dormitories Buildings (consisting of 10 buildings each building 5 floors full finishing)
-General Directorate (composed of 22 building fully finished) - -Infrastructure works (water and sanitation tanks - sewer lines and Potable water - Electrical Rooms and substations - telephone)
- Construction of the road, including walkways and street lighting and irrigation system.
- Landscape (trees, shrubs and landscaping).
* Job description/Responsibilities:
- Review all documents related to the project. ( Structural drawings and architectural drawings - soil reports- data sheets ) and preparation of required submissions
- Coordinating with the project manager.
-Determine labor requirements and dispatch workers to construction sites.
- Monitor and direct all contractors in all activities on site.
-Follow up the project time schedule
- Preparing daily reports that show work progress and next day plan

Site Engineer at Zaid Al-Hussain Group IN Saudi Arabia
  • Saudi Arabia - Hail
  • February 2010 to May 2012

Civil Site Engineer in the infrastructure project at the University of Hail
Owner: Ministry of education
Project location: Hail
Components of the project:
- Project Cost 85 million riyals
-Administrative Services Building
- Extension Services (water - Electrical Rooms & substations - telephone).
-Building 3 concrete tanks for drainage works
- Building 1 major concrete tank for potable water
- Landscape (trees, shrubs and landscaping).

Site Engineer at Industrial Construction & Engineering Company ( SIAC)
  • Egypt - Alexandria
  • September 2006 to February 2010

Site Engineer For several projects as
San Stefano Complex and Lodges in ALEX (High Rise Tower) *
Description of work:
Build a residential complex + Lodges finish Super Deluxe
works Including Cut & fill work, Concrete work, masonry work & finishing work.

*Administrative Juhayna Company Buildings In Sixth of October City Industrial Zone
Description of work
Two building administrative in six october works Including
(Cut & fill work, Concrete work, masonry work & finishing work)
Technical office works :
Calculation of quantities and work extracts
Project time scheduling by primavera project

Site Engineer at South Sina Company
  • Egypt - Sharm el Sheikh
  • September 2005 to September 2006

Construction Site Engineer responsible for structure and finishing work & interor design for Aida Hotel from sharm-El sheak city

مهندس موقع تنفيذى
العمل فى شرم الشيخ فى إنشاء فندق سياحى بمدينة شرم الشيخ
اعمال الخرسانات والتشطيبات والفرش الكامل للفندق

Education

Bachelor's degree, Civil Engineering, (Construction & Building)
  • at B.S.in Civil Engineering from 6th of October University, in June 2005
  • June 2005

Graduation: B.S.in Civil Engineering from 6th of October University, in June 2005 Department: Civil Engineering, (Construction & Building) . Total Grade: GOOD Final Project: Management. Grade of project: High Good.

Specialties & Skills

Project Management
Construction Supervision
Build Engineering
Civil Engineering
Civil Works
Ability to work in under pressure
Construction Management Skills & Communication Skills. & Quality Control Skills
Good in leading and managing people
Ability to foster great relationships with all stuff and technicians.

Languages

English
Intermediate
Arabic
Expert

Memberships

Member of Saudi Cuncil of Engineering.
  • Civil Engineer
  • September 2011
Member of Engineering Syndicate since sep. 2005.
  • Civil Engineer
  • September 2005

Training and Certifications

Project Management Professional ( PMP ) (Training)
Training Institute:
grey campus
Date Attended:
April 2016
Duration:
35 hours

Hobbies

  • Reading - and the search for what is new in engineering